★ Independent, reader-supported & ad-free · Watching the watchers in all 50 states ★ Support Us
The Docket · Government Meeting · DKT-2026-002321

On the agenda: Shenandoah meeting — Surveillance Camera (Oct 28)

⚠ Agenda Watch  Shenandoah, Texas · Wednesday, October 28, 2026 — in 5 days

About this record

The published agenda for this October 28 meeting contains: "Surveillance Camera". This is the public record BEFORE the vote — read the document, then show up. Public comment is where cancellations start.

WhenWednesday, October 28, 2026
Check the agenda document for the meeting time.
WhereShenandoah, Texas
BodyCity Council Meeting
Money$78,300.00 on the table
On the record“Surveillance Camera”

The agenda, word for word

Government public record — the full text of the published document, archived October 23, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗

100 pages · scroll to read
Page 1 of 100

NOTICE OF REGULAR MEETING
October 28, 2026
SHENANDOAH CITY COUNCIL
STATE OF TEXAS
COUNTY OF MONTGOMERY
CITY OF SHENANDOAH

AGENDA

NOTICE IS HEREBY GIVEN that a Meeting of the Shenandoah City Council will be held on Wednesday,
October 28, 2026 at 6:00 p.m. at the City of Shenandoah Municipal Complex, 29955 IH-45 North,
Shenandoah, Texas for the purpose of considering the following:
1. CALL TO ORDER
2. CALL OF ROLL
3. PLEDGE OF ALLEGIANCE
4. INVOCATION
5. CITIZENS FORUM
Citizens are invited to speak for three (3) minutes on matters relating to city government that
relate to agenda or non-agenda items. Speakers are asked to approach the podium and give their
name and address before sharing their comments.
In accordance with the Texas Open Meetings Act, responses to citizen comments by members
of the City Council, or any board or commission subject to the Act, are limited to statements of
specific factual information or recitations of existing policy. Any deliberation or decision shall
be limited to a proposal to place the subject on a future agenda.
CONSENT AGENDA:
Consent agenda items are considered routine by City Council and will be enacted by one motion. There
will be no separate discussion of these items unless a Councilmember requests an item be removed and
considered separately.
A. Adopt the minutes of the September 9, 2026 regular meeting.
B. Adopt the following Resolution:
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHENANDOAH, TEXAS, EXPRESSING
SUPPORT FOR THE PRESERVATION AND RESTORATION OF THE HISTORIC MONTGOMERY COUNTY
COURTHOUSE; RECOGNIZING THE PROJECT'S HISTORICAL, CULTURAL, AND TOURISM VALUE TO
MONTGOMERY COUNTY; ENCOURAGING CONTINUED PARTNERSHIP AMONG LOCAL
GOVERNMENTS; AND PROVIDING FOR AN EFFECTIVE DATE.
C. Adopt the following Ordinance:
AN ORDINANCE OF THE CITY OF SHENANDOAH, TEXAS AMENDING CHAPTER 14, ARTICLE II BY
UPDATING BUILDING CODES; PROVIDING FOR THE SEVERABILITY OF THE PROVISIONS OF THIS
ORDINANCE; PROVIDING FOR THE REPEAL OF ANY AND ALL ORDINANCES OR RESOLUTIONS TO
THE EXTENT THE SAME ARE INCONSISTENT WITH OR IN CONFLICT WITH THIS ORDINANCE; AND
PROVIDING FOR AN EFFECTIVE DATE.
City Council Meeting
October 28, 2026
Page 1 of 2

Page 2 of 100

INDIVIDUAL CONSIDERATION:
6. Discussion and possible action regarding amendment No. 4 for Engineering Services with Bleyl
Engineering.
7. Discussion and possible action regarding additional funding for the City Hall Building Security and
Infrastructure Refresh project.
8. Civic Club Updates
9. City Administrator updates-Monthly Reports.
10. COUNCIL INQUIRY
Pursuant to Texas Government Code Section 551.042, members of the City Council or any board
or commission subject to the Open Meetings Act may inquire about a subject not listed on this
agenda. Responses must be limited to statements of fact or recitations of policy. Deliberation
or action must be limited to a proposal to place the item on a future agenda. The presiding
officer may limit time and scope of inquiries to maintain meeting order and ensure compliance
with the Open Meetings Act.
EXECUTIVE SESSION
Public notice is given that the City Council, or any board or commission subject to the Texas Open
Meetings Act, may convene in Executive Session at any time during the meeting to discuss matters listed
on the agenda when authorized by the provisions of Chapter 551 of the Texas Government Code.
Executive Session may be used to receive legal advice or to discuss personnel matters, land acquisition,
or other matters permitted under the Act.
The body may retire into Executive Session concerning any item listed on the agenda whenever it is
deemed necessary and legally justified. Prior to entering into Executive Session, the presiding officer will
publicly announce the applicable agenda item and the Section or Sections of Chapter 551 that authorize
the closed discussion.
ADJOURN
The City Council, or any board or commission subject to the Texas Open Meetings Act, may vote and/or
act upon each of the items listed on this Agenda. One agenda item will be discussed at a time unless
logic and practical consideration allow similar topics to be considered together for purposes of
convenience and efficiency.
Any discussion item on the agenda permits members of the City Council, or any board or commission
subject to the Texas Open Meetings Act, to question the involved parties or receive a presentation by
the involved parties.
City Hall is wheelchair accessible. A sloped entry is available at the entrance with specially marked parking spaces
available. Requests for accommodations or interpretive services must be made 48 hours prior to this meeting.
Please contact the City Secretary’s office at 281-298-5522 or Fax 281-367-2225 for information.
I, Courtney Clary, City Secretary, do hereby certify that the above Notice of Meeting of the governing body of the
City of Shenandoah is a true and correct copy of said Notice and that I posted a true and correct copy of said Notice
on the bulletin board at City Hall, a place convenient and readily accessible to the general public at all times. Said
Notice was posted on October 22, 2026 at 5:15 p.m., and remained so posted continuously for at least three business
days preceding the scheduled time of said meeting in accordance with Chapter 551 of the Texas Government Code,
as amended by H.B. 1522.

________________________________________
Courtney Clary, City Secretary
City Council Meeting
October 28, 2026
Page 2 of 2

Page 3 of 100

MINUTES OF REGULAR MEETING
September 9, 2026
SHENANDOAH CITY COUNCIL
The meeting was called to order by Mayor Escoto at 6:00 p.m. City Council members present,
Councilmember Ernest Sumrall, Councilmember Joe M. Summerlin, Jr., Councilmember Charlie Bradt, and
Councilmember Frank Robinson. City Administrator Sam Masiel, Assistant City Administrator Joseph
Peart, City Secretary Courtney Clary, City Attorney William Ferebee, Finance Director Lisa Wasner, Police
Chief Troye Dunlap, Public Works Director Rual Porras, and IT Manager Chris Grizzaffi were also present.
1. CALL TO ORDER
Mayor Escoto called the meeting to order at 6:00 p.m.
2. CALL OF ROLL
Mayor Escoto stated for the record that Councilmember Pollard was absent and excused from the
meeting.
3. PLEDGE OF ALLEGIANCE
4. INVOCATION
Councilmember Robinson gave the invocation.
5. CITIZENS FORUM
Citizens are invited to speak for three (3) minutes on matters relating to city government that relate
to agenda or non-agenda items. Speakers are asked to approach the podium and give their name and
address before sharing their comments.
In accordance with the Texas Open Meetings Act, responses to citizen comments by members of the
City Council, or any board or commission subject to the Act, are limited to statements of specific
factual information or recitations of existing policy. Any deliberation or decision shall be limited to
a proposal to place the subject on a future agenda.
Michael McLeod: To view comments, please click HERE
INDIVIDUAL CONSIDERATION:
6. Presentation regarding the process for becoming a home rule municipality.
To view the presentation, please click HERE
7. Presentation of a proclamation recognizing September 11, 2026, as Patriot Day and National Day
of Service and Remembrance in the City of Shenandoah.
Mayor Escoto presented a proclamation recognizing September 11, 2026, as Patriot Day

City Council Meeting Minutes
September 9, 2026
1

Page 4 of 100

MINUTES OF REGULAR MEETING
September 9, 2026
SHENANDOAH CITY COUNCIL
and National Day of Service and Remembrance in honor of the 25th anniversary of the September
11, 2001 terrorist attacks. The proclamation honored the victims, survivors, first responders, and
service members and encouraged residents to observe the day through remembrance, reflection,
and acts of service.
8. Discussion and possible action regarding funding for the 120-Day General Fund Reserves.
COUNCILMEMBER ROBINSON MADE A MOTION TO APPROVE THE TRANSFER OF FUNDS
TO ESTABLISH THE 120-DAY COMMITTED GENERAL FUND RESERVE BALANCE, COUNCILMEMBER
SUMMERLIN SECONDED. THE MOTION CARRIED 4/0.
9. Discussion and possible action to cast votes for Places 1 through 4 on the Texas Municipal League
Intergovernmental Risk Pool Board of Trustees ballot.
COUNCILMEMBER SUMRALL MADE A MOTION TO APPROVE CASTING VOTES FOR J.W.
FULLEN (PLACE 1), EMILY CRAWFORD (PLACE 2), CORBY ALEXANDER (PLACE 3), AND AUSTIN
BLEESS (PLACE 4) ON THE TML INTERGOVERNMENTAL RISK POOL BOARD OF TRUSTEES BALLOT,
COUNCILMEMBER ROBINSON SECONDED. THE MOTION CARRIED 4/0.
10. Discussion and possible action to adopt the minutes of the July 8, 2026 and July 22, 2026 regular
meetings.
COUNCILMEMBER BRADT MADE A MOTION TO APPROVE THE MEETING MINUTES AS
PRESENTED, COUNCILMEMBER SUMMERLIN SECONDED. THE MOTION CARRIED 4/0.
11. City Administrator updates- Monthly Reports.
•
•
•

City Hall HVAC Project: Construction is underway, beginning with the Community Room and
adjoining areas.
AMI Water Meter Conversion: The Ameresco water meter conversion project is progressing, with
work beginning in the Valley area.
Tamina Project: Work continues to progress.

12. COUNCIL INQUIRY
Pursuant to Texas Government Code Section 551.042, members of the City Council or any board or
commission subject to the Open Meetings Act may inquire about a subject not listed on this agenda.
Responses must be limited to statements of fact or recitations of policy. Deliberation or action must
City Council Meeting Minutes
September 9, 2026
2

Page 5 of 100

MINUTES OF REGULAR MEETING
September 9, 2026
SHENANDOAH CITY COUNCIL
be limited to a proposal to place the item on a future agenda. The presiding officer may limit time and
scope of inquiries to maintain meeting order and ensure compliance with the Open Meetings Act.
Councilmember Robinson thanked Tourism Advisory Board member Michael McLeod for
sharing his experience at the Destination Texas Conference. He also recognized John Mayner and Billy
Adams for their assistance and expressed appreciation for the educational opportunities provided by
the conference.
Mayor Escoto emphasized the importance of remembering the September 11, 2001 terrorist
attacks and honoring those who lost their lives as the nation observes the 25th anniversary.
EXECUTIVE SESSION
Public notice is given that the City Council, or any board or commission subject to the Texas Open
Meetings Act, may convene in Executive Session at any time during the meeting to discuss matters listed
on the agenda when authorized by the provisions of Chapter 551 of the Texas Government Code.
Executive Session may be used to receive legal advice or to discuss personnel matters, land acquisition,
or other matters permitted under the Act.
The body may retire into Executive Session concerning any item listed on the agenda whenever it is
deemed necessary and legally justified. Prior to entering into Executive Session, the presiding officer will
publicly announce the applicable agenda item and the Section or Sections of Chapter 551 that authorize
the closed discussion.
There being no further business, Mayor Pro Tem Charlie Bradt adjourned the meeting at 6:40 p.m.
ADJOURN
The Council may vote and/or act upon each of the items listed on this Agenda. One agenda item will be
discussed at a time unless logic and practical consideration allow similar topics to be considered
together for purposes of convenience and efficiency. The Council may retire into executive session
concerning any of the items listed on this Agenda, whenever it is considered necessary and legally
justified under the Open Meetings Act.
Any discussion item on the City Council agenda permits City Council to question the involved parties or
receive a presentation by the involved parties.

SUBMITTED BY:

DATE APPROVED:
Courtney Clary, City Secretary
John G. Escoto, Mayor

City Council Meeting Minutes
September 9, 2026
3

Page 6 of 100

RESOLUTION R-26-__
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SHENANDOAH, TEXAS, EXPRESSING
SUPPORT FOR THE PRESERVATION AND RESTORATION OF THE HISTORIC MONTGOMERY
COUNTY COURTHOUSE; RECOGNIZING THE PROJECT'S HISTORICAL, CULTURAL, AND TOURISM
VALUE TO MONTGOMERY COUNTY; ENCOURAGING CONTINUED PARTNERSHIP AMONG LOCAL
GOVERNMENTS; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Historic Montgomery County Courthouse is a significant public landmark that represents
the history, heritage, and civic identity of Montgomery County and its residents; and
WHEREAS, Montgomery County has invested in the development of a Historic Courthouse Preservation
Master Plan, which has been approved by the Texas Historical Commission, establishing a framework for
the preservation and restoration of the courthouse to its historically significant 1936 appearance; and
WHEREAS, Montgomery County has been awarded a planning grant through the Texas Historical
Commission to prepare detailed architectural and engineering plans necessary for future restoration of
the courthouse, contingent upon the County providing the required local matching funds; and
WHEREAS, preservation of the Historic Montgomery County Courthouse has the potential to enhance
heritage tourism, preserve an important public asset, strengthen community identity, and contribute to
the long-term economic vitality of Montgomery County; and
WHEREAS, the City of Shenandoah recognizes the importance of preserving historically significant public
facilities that benefit residents and visitors throughout Montgomery County and acknowledges that
successful preservation efforts require collaboration among the County, municipalities, community
organizations, and other stakeholders; and
WHEREAS, the City Council desires to express its support for the County's efforts to preserve and restore
the Historic Montgomery County Courthouse.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHENANDOAH, TEXAS THAT:
Section 1. The City Council hereby expresses its support for Montgomery County's efforts to preserve and
restore the Historic Montgomery County Courthouse and recognizes the historical, cultural, educational,
and tourism benefits the project may provide to Montgomery County and its communities.
Section 2. The City Council encourages continued cooperation among Montgomery County, its
municipalities, community organizations, and the Texas Historical Commission in advancing the
preservation of this historic landmark.
Section 3. The City Council respectfully encourages Montgomery County to continue pursuing available
state, federal, private, and local funding opportunities necessary to complete the preservation and
restoration project.
Section 4. This Resolution expresses the City Council's support for the courthouse preservation initiative.

1

Page 7 of 100

Section 5. This Resolution shall become effective immediately upon its adoption.
PASSED AND APPROVED this the 28th day of October 2026.

CITY OF SHENANDOAH, TEXAS

_______________________________
JOHN G. ESCOTO, Mayor
ATTEST:

_________________________________
COURTNEY CLARY, City Secretary
APPROVED AS TO FORM:

_________________________________
WILLIAM C. FEREBEE, City Attorney

2

Page 8 of 100

ORDINANCE O-26-__
AN ORDINANCE OF THE CITY OF SHENANDOAH, TEXAS AMENDING CHAPTER 14, ARTICLE II BY
UPDATING BUILDING CODES; PROVIDING FOR THE SEVERABILITY OF THE PROVISIONS OF THIS
ORDINANCE; PROVIDING FOR THE REPEAL OF ANY AND ALL ORDINANCES OR RESOLUTIONS TO
THE EXTENT THE SAME ARE INCONSISTENT WITH OR IN CONFLICT WITH THIS ORDINANCE; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City of Shenandoah has adopted various building codes, such as the International
Residential Code, the International Building Code, the International Fire Code, the International
Mechanical Code, the International Plumbing Code, the International Fuel Gas Code, the International
Energy Conservation Code, the ICC Performance Code for Buildings and Facilities, the International
Property Maintenance Code and the National Electrical Code; and
WHEREAS, each of the Codes is updated on a periodic basis; and
WHEREAS the City periodically updates its building codes such as the International Residential Code,
the International Building Code, the International Fire Code, the International Mechanical Code, the
International Plumbing Code, the International Fuel Gas Code, the International Energy Conservation
Code, the ICC Performance Code for Buildings and Facilities, the International Property Maintenance Code
and the National Electrical Code; and
WHEREAS, each of the codes listed above has updated their provisions; and
WHEREAS, the updates are an improvement on prior code provisions; and
WHEREAS, the City Council finds it in the best interest to update the above codes in effect;
NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SHENANDOAH, TEXAS;
Section One:
The Code of Ordinances of the City of Shenandoah, Texas, is hereby amended by repealing Chapter 14,
Article II, Section 14-31(a) in its entirety and by adding a new Section 14-31(a) as follows:
Sec. 14-31. Residential Code Adopted
(a)

There is adopted by the city for the purpose of establishing rules and regulations for the
construction, alteration, repair, removal, demolition, equipment, use and occupancy of
buildings and structures, including permits and penalties, that certain code known as the
International Residential Code, 2024 Edition, with appendices and amendments to such code
and such code is adopted as the residential code of the city as if fully set out at length in this
section, and the provisions of such code shall be controlling within the corporate limits of the
city and its extraterritorial jurisdiction. Additionally, the city reserves the right to require
permits that may not be required by the adopted version of the International Residential Code
and to adopt additional rules and regulations by written policy that will supersede
requirements of the adopted code.

The Code of Ordinances of the City of Shenandoah, Texas, shall be and is hereby amended by repealing
Chapter 14, Article II, Section 14-32(a) in its entirety and by adding a new Section 14-32(a) as follows:

1

Page 9 of 100

(a)

The codes and regulations and provisions of the international codes as recommended and
published by the International Code Council (ICC) with appendices and amendments to such
codes, as well as the National Electrical Code of the National Fire Protection Association, Inc.,
2026 edition, with appendices and amendments thereto, in sections 14-33 and 14-34, as listed
below are adopted as the regulations governing the construction of buildings, additions,
alterations and other structures and activities in the city involving building, plumbing,
mechanical and electrical construction. It shall be unlawful to erect, modify or construct any
building or structure, or change the occupancy or use of any building or structure in violation
of, or without complying with, such regulations, codes and provisions. Additionally, the city
reserves the right to require permits that may not be required by the adopted version of the
Codes listed below and to adopt additional rules and regulations by written policy that will
supersede requirements of the adopted code.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)

International Building Code, 2024 Edition.
International Fire Code, 2024 Edition.
International Mechanical Code, 2024 Edition.
International Plumbing Code, 2024 Edition.
International Fuel Gas Code, 2024 Edition.
International Swimming Pool and Spa Code, 2024 Edition.
International Energy Conservation Code, 2024 Edition.
ICC Performance Code for Buildings and Facilities, 2024 Edition.
International Property Maintenance Code, 2024 Edition.
National Electrical Code of the National Fire Protection Association, Inc., 2026 Edition
The city will continue to use the Standard Amusement Device Code, 1997 edition.

The Code of Ordinances of the City of Shenandoah, Texas, shall be and is hereby amended by repealing
Chapter 14, Article II, Section 14-33(a) (2) in its entirety and by adding a new Section 14-33(a) (2) as
follows:
Sec. 14-33. Code Amendments
(2) The 2024 International Fire Code is hereby amended to adopt and incorporate the amendments
approved by the Commissioners Court of Montgomery County, Texas, effective May 14, 2025.
Section Two:
It is hereby declared to be the intention of the City Council that the several provisions of this ordinance
are severable, and if any court of competent jurisdiction shall judge any provisions of this ordinance to be
illegal, invalid, or unenforceable, such judgment shall not affect any other provisions of this ordinance
which are not specifically designated as being illegal, invalid or unenforceable.
Section Three:
Any and all ordinances, resolutions, and/or policies of the City of Shenandoah, Texas, whether written or
otherwise, which are in any manner in conflict with or inconsistent with this ordinance shall be and are
hereby repealed to the extent of such conflict and/or inconsistency.

2

Page 10 of 100

Section Four:
This ordinance shall become effective and applicable immediately upon its passage and approval as
provided by law.
PASSED, APPROVED AND ADOPTED this 28th day of October 2026.

___________________________________
JONH G. ESCOTO, MAYOR
ATTEST:

___________________________________
COURTNEY CLARY, CITY SECRETARY
APPROVED AS TO FORM:
___________________________________
WILLIAM C. FEREBEE, CITY ATTORNEY

3

Page 11 of 100

Montgomery County Fire Code
Jimmy Williams
Fire Marshal ‐ Fire Chief
Kevin Bates

Brian Cross

Assistant Fire Marshal
Fire Investigations

Assistant Fire Marshal
Fire Inspections

Montgomery County Fire Marshal’s Office
501 N. Thompson, Conroe, Texas, 77301 Suite 102
Phone: (936)538‐8288
Fax: (936)538‐8277
Email: [email protected]

1

Page 12 of 100

TABLE OF CONTENTS
SECTION 101 – SCOPE AND GENERAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
SECTION 102 – APPLICABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
SECTION 103 – DEPARTMENT OF FIRE CODE ADMINISTRATION AND ENFORCEMENT . . . . . 7
SECTION 104 – GENERAL AUTHORITY AND RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . 8
SECTION 105 – PERMITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
SECTION 106 – FEES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
SECTION 107 – INSPECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
SECTION 108 – MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
SECTION 109 – VIOLATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
SECTION 110 – UNSAFE BUILDINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16

EXHIBIT A – ADDITIONS, INSERTIONS, DELETIONS AND CHANGES to
INTERNATIONAL FIRE CODE and BUILDING CODE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . … .17
**Montgomery County has only adopted certain chapters of the International Building Code. Please refer to 102.3.2 Application of
building code for chapters and sections that have been adopted.**

The 2024 International Fire Code, including Appendices B, C, D, H,
I, J, L and P, is hereby adopted as the Montgomery County Fire
Code by the Commissioners Court of Montgomery County, Texas.

Effective Date: May 14th 2025

2

Page 13 of 100

CHAPTER 1
SCOPE AND ADMINISTRATION
PART 1—GENERAL PROVISIONS
SECTION 101
SCOPE AND GENERAL REQUIREMENTS
101.1 Title. These regulations shall be known as the Fire Code of Montgomery County, hereinafter referred
to as “this code.”
101.1.1 Occupancy prohibited before approval. No building or structure subject to this code shall be
occupied prior to:
1. Receipt by the County Fire Code Official of a request for final inspection from the permit holder as
submitted on a form provided by the Fire Marshal Office, and
2. Issuance of a Certificate of Compliance by the Fire Marshal’s Office that indicates that applicable
provisions of this code have been met.
101.2 Scope. This code establishes regulations affecting or relating to structures, processes, premises and
safeguards regarding all of the following:
1. The hazard of fire and explosion arising from the storage, handling or use of structures, materials or
devices.
2. Conditions hazardous to life, property or public welfare in the occupancy of structures or premises.
3. Fire hazards in the structure or on the premises from occupancy or operation.
4. Matters related to the construction, extension, repair, alteration or removal of fire suppression or alarm
systems.
5. Conditions affecting the safety of fire fighters and emergency responders during emergency operations.
6. New construction, substantial improvements, alterations, relocations, enlargement, replacement, repair,
equipment, use and occupancy, location, of every building or structure or any appurtenances connected or
attached to such buildings or structures.
Exceptions:
1. One‐and‐two‐family dwellings,
2. A multifamily residential dwelling consisting of three or less units.
3. Industrial facilities having a fire brigade that conforms to requirements of the Occupational Safety
and Health Administration 1910 and receives exemption by Montgomery County.
101.2.1 Appendices. Appendices B, C, D, H, I, J, L and P are adopted as part of the Montgomery County Fire
Code.
101.3 Intent. The purpose of this code is to establish the minimum requirements consistent with nationally
recognized good practice for providing a reasonable level of life safety and property protection from the
hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises,
and to provide a reasonable level of safety to fire fighters and emergency responders during emergency
operations.
3

Page 14 of 100

101.4 Severability. If a section, subsection, sentence, clause or phrase of this code is, for any reason, held to
be unconstitutional, such decision shall not affect the validity of the remaining portions of this code.

101.5 Validity. In the event any part or provision of this code is held to be illegal or void, this shall not have
the effect of making void or illegal any of the other parts or provisions hereof, which are determined to be
legal; and it shall be presumed that this code would have been adopted without such illegal or invalid parts
or provisions.
101.6 Abrogation and greater restrictions. This Code is not intended to repeal, abrogate, or impair any
existing laws, regulations, easements, covenants, or deed restrictions.

4

Page 15 of 100

SECTION 102
APPLICABILITY
102.1 Construction and design provisions. The construction and design provisions of this code shall apply to:
1. Structures, facilities and conditions arising after the adoption of this code.
2. Existing structures, facilities and conditions not legally in existence at the time of adoption of this code.
3. Existing structures, facilities and conditions that, in the opinion of the fire code official, constitute a distinct
hazard to life or property.
102.2 Administrative, operational and maintenance provisions. The administrative, operational and
maintenance provisions of this code shall apply to:
1. Conditions and operations arising after the adoption of this code.
2. Existing conditions and operations.
102.3 Substantial Improvement. A substantial improvement shall not be made unless the building and/or
structure is made to comply with new construction requirements of the Montgomery County Fire Code.
102.3.1 Use and Occupancy. No building or structure shall be used or occupied, and no change in the
existing occupancy classification or use of a building or structure or portion thereof shall be made, until a fire
code inspection has been completed as approved and the Fire Marshal’s Office has issued a certificate of
compliance as provided herein. Issuance of a certificate of compliance shall not be construed as an approval
of a violation of the provisions of this code or of other regulations, ordinances, or court orders of
Montgomery County.
102.3.2 Application of building code. The design and construction of new structures shall comply with
Chapters 2‐10, 17, 30, 33,35, Sections 1405 and 1406, 1505, 3101 through 3105, 3110, 3111, and Appendix C
of the International Building Code, and any alterations, additions, substantial improvements, changes in
occupancy, use or changes in structures required by this code, which are within the scope of the
International Building Code, shall be made in accordance therewith.
102.4 Referenced codes and standards. The codes and standards referenced in this code shall be those that
are listed in Chapter 80, and such codes and standards shall be considered to be part of the requirements of
this code to the prescribed extent of each such reference and as further regulated in Sections 102.4.1 and
102.4.2.
102.4.1 Conflicts. Where conflicts occur between provisions of this code and referenced codes and
standards, the provisions of this code shall apply.
102.4.2 Provisions in referenced codes and standards. Where the extent of the reference to a
referenced code or standard includes subject matter that is within the scope of this code, the provisions of
this code, as applicable, shall take precedence over the provisions in the referenced code or standard.
102.5 Subjects not regulated by this code. Where applicable standards or requirements are not set forth in
this code, or are contained within other laws, codes, regulations, ordinances or bylaws adopted by the
jurisdiction, compliance with applicable standards of the National Fire Protection Association or other
nationally recognized fire safety standards, as approved, shall be deemed as prima facie evidence of
compliance with the intent of this code. Nothing herein shall derogate from the authority of the fire code
official to determine compliance with codes or standards for those activities or installations within the fire
code official’s jurisdiction or responsibility.
5

Page 16 of 100

102.6 Matters not provided for. Requirements that are essential for the public safety of an existing or
proposed activity, building or structure, or for the safety of the occupants thereof, that are not specifically
provided for by this code, shall be determined by the fire code official.
102.7 Conflicting provisions. Where there is a conflict between a general requirement and a specific
requirement, the specific requirement shall be applicable. Where, in a specific case, different sections of this
code specify different materials, methods of construction or other requirements, the most restrictive shall
govern.
102.8 Other laws. The provisions of this code shall not be deemed to nullify any provisions of local, state or
federal law.
102.9 Application of references. References to chapter or section numbers, or to provisions not specifically
identified by number, shall be construed to refer to such chapter, section or provision of this code.

6

Page 17 of 100

PART 2—ADMINISTRATIVE PROVISIONS
SECTION 103
DEPARTMENT OF FIRE CODE ADMINISTRATION AND ENFORCEMENT
103.1 General. The Fire Marshal or Fire Code Official means the individual appointed by Commissioner’s
Court and all employees designated by the Fire Marshal to administer the provision of this code to include
the review of submitted construction plans and documents for compliance with this adopted code and the
issuance of the required permits and final Certificates of Compliance.
The fire code official shall be the person appointed by Commissioners Court as the County Fire Marshal or
the employee(s) designated by the County Fire Marshal to perform a task required by this code. The Fire
Marshal shall have enforcement authority for this code and shall conduct all required inspections for
compliance with this code.
103.2 Fire Code Official. Fire Code Official shall have the authority to appoint deputies, other related
technical officers, inspectors and other employees.
103.2.1 Fire Marshal. Fire Marshal shall have the authority to appoint a Building Official, other related
technical officers, and other employees.
103.3 Liability. The fire code official, Fire Marshal, officer or employee charged with the enforcement of this
code, while acting for the jurisdiction, in good faith and without malice in the discharge of the duties
required by this code or other pertinent law or ordinance, shall not thereby be rendered civilly or criminally
liable personally, and is hereby relieved from all personal liability for any damage accruing to persons or
property as a result of an act or by reason of an act or omission in the discharge of official duties.
103.3.1 Legal defense. Any suit or criminal complaint instituted against any officer or employee because of
an act performed by that officer or employee in the lawful discharge of duties and under the provisions of
this code shall be defended by the legal representatives of the jurisdiction until the final termination of the
proceedings. The fire code official, Fire Marshal, or any subordinate shall not be liable for costs in an action,
suit or proceeding that is instituted in pursuance of the provisions of this code; and any officer of
Montgomery County, acting in good faith and without malice, shall be free from liability for acts performed
under any of its provisions or by reason of any act or omission in the performance of official duties in
connection therewith.

7

Page 18 of 100

SECTION 104
GENERAL AUTHORITY AND RESPONSIBILITIES
104.1 General. The fire code official is hereby authorized to administrate and enforce the provisions of this
code. The fire code official shall have the authority to render interpretations of this code and to adopt
policies, procedures, rules and regulations in order to clarify the application of its provisions. Such
interpretations, policies, procedures, rules and regulations shall be in compliance with the intent and
purpose of this code. Such policies, procedures, rules and regulations shall not have the effect of waiving
requirements specifically provided for in this code.
104.1.1 Authority of the Fire Marshal and the Fire Marshal’s Office. It shall be the duty of the Fire Marshal
or designee to protect the safety and property of residents from fire hazards, through the issuance of Fire
Marshal Orders, Notices of Violations, and Citations as required to achieve compliance with the fire and
building codes.
104.2 Applications and permits. The Fire Marshal is authorized to receive applications, review construction
documents and issue permits for construction regulated by this code, issue permits for operations regulated
by this code. The fire code official is authorized to inspect the premises for which such permits have been
issued and enforce compliance with the provisions of this code.
104.3 Right of entry. Where it is necessary to make an inspection to enforce the provisions of this code, or
where the fire code official has reasonable cause to believe that there exists in a building or on any premises
any conditions or violations of this code that make the building or premises unsafe, dangerous or hazardous,
the fire code official shall have the authority to enter the building or premises at all reasonable times to
inspect or to perform the duties imposed on the fire code official by this code. If such building or premises is
occupied, the fire code official shall present credentials to the occupant and request entry. If such building or
premises is unoccupied, the fire code official shall first make a reasonable effort to locate the owner, the
owner’s authorized agent or other person having charge or control of the building or premises and request
entry. If entry is refused, the fire code official has recourse to every remedy provided by law to secure entry.
104.3.1 Warrant. Where the fire code official has first obtained a proper inspection warrant or other remedy
provided by law to secure entry, an owner, the owner’s authorized agent or occupant or person having
charge, care or control of the building or premises shall not fail or neglect, after proper request is made as
herein provided, to permit entry therein by the fire code official for the purpose of inspection and
examination pursuant to this code.
104.4 Technical assistance. To determine the acceptability of technologies, processes, products, facilities,
materials and uses attending the design, operation or use of a building or premises subject to inspection by
the fire code official, the Fire Marshal and fire code official is authorized to require the owner or owner’s
authorized agent to provide, without charge to the jurisdiction, a technical opinion and report. The opinion
and report shall be prepared by a qualified engineer, specialist, and laboratory or fire safety specialty
organization acceptable to the fire code official and shall analyze the fire safety properties of the design,
operation or use of the building or premises and the facilities and appurtenances situated thereon, to
recommend necessary changes. The fire code official are authorized to require design submittals to be
prepared by, and bear the stamp of, a registered design professional.
104.5 Modifications. Where there are practical difficulties involved in carrying out the provisions of this
8

Page 19 of 100

code, the fire code official shall have the authority to grant modifications for individual cases, provided that
the fire code official shall first find that special individual reason makes the strict letter of this code
impractical and the modification is in compliance with the intent and purpose of this code and that such
modification does not lessen health, life and fire safety requirements. The details of action granting
modifications shall be recorded and entered in the files of the fire code official.
104.6 Alternative materials, design and methods of construction and equipment. The provisions of this
code are not intended to prevent the installation of any material or to prohibit any design or method of
construction not specifically prescribed by this code, provided that any such alternative has been approved.
An alternative material, design or method of construction shall be approved where the fire code official finds
that the proposed design is satisfactory and complies with the intent of the provisions of this code, and that
the material, method or work offered is, for the purpose intended, not less than the equivalent of that
prescribed in this code in quality, strength, effectiveness, fire resistance, durability and safety. Where the
alternative material, design or method of construction is not approved, the fire code official shall respond in
writing, stating the reasons why the alternative was not approved.
104.7.1 Research reports. Supporting data, where necessary to assist in the approval of materials or
assemblies not specifically provided for in this code, shall consist of valid research reports from approved
sources.
104.7.2 Tests. Where there is insufficient evidence of compliance with the provisions of this code, or
evidence that a material or method does not conform to the requirements of this code, or in order to
substantiate claims for alternative materials or methods, the Fire Marshal and fire code official shall have the
authority to require tests as evidence of compliance to be made without expense to the jurisdiction. Test
methods shall be as specified in this code or by other recognized test standards. In the absence of recognized
and accepted test methods, the Fire Marshal and fire code official shall approve the testing procedures. Tests
shall be performed by an approved agency. Reports of such tests shall be retained by the Fire Marshal and
fire code official for the period required for retention of public records.

9

Page 20 of 100

SECTION 105
PERMITS
105.1 General. Permits shall be in accordance with Sections 105.1.1 through 105.7.25.
105.1.1 Permits required. A property owner or owner’s authorized agent who intends to conduct an
operation or business, or construct, substantially improve, enlarge, alter, repair, move, or change the
occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert, or replace
the installation of which is regulated by this code, or to cause any such work to be performed, shall first
make application to the Fire Marshal and obtain the required permit.
105.1.2 Types of permits.
Fire Code permit. A construction permit allows the applicant to construct, substantially improve, enlarge,
alter, repair, move, or change the occupancy of a building or structure, or to erect, install, enlarge, alter,
repair, remove, convert, or replace the installation of which is regulated by this code, or to cause any such
work to be performed, or install or modify systems and equipment for which a permit is required.
105.1.3 Emergency repairs. Where equipment replacement and repairs must be performed in an emergency
situation, the permit application shall be submitted within the next working business day to the Fire Marshal.
105.1.4 Fire Protection Repairs. The Fire Marshal shall be notified in accordance with State rules of any
repairs or impairments to any fire protection systems.
105.2 Working without a permit. Work requiring a permit shall not commence until the required permit is
posted in a conspicuous location and approvals are available on the premises designated therein. Where
work is commenced prior to obtaining said permit, the fees may be increased as determined by the fee
schedule adopted by Commissioners Court. Payment of the increased fee shall not relieve any person from
fully complying with the requirements to obtain a permit nor of any other penalties herein.
105.2.1 Occupancy prohibited before approval. The building or structure shall not be occupied prior to
issuing a permit and the fire code official conducting associated inspections indicating the applicable
provisions of this code have been met.
105.2.2 Conditional Certificate of Compliance. Where permits are issued and on the request of a permit
applicant, the fire code official is authorized to issue a conditional certificate of compliance to occupy the
premises or portion thereof before the entire work or operations on the premises is completed, provided
that such portion or portions will be occupied safely prior to full completion or installation of equipment and
operations without endangering life or public welfare. The fire code official shall notify the permit applicant
in writing of any limitations or restrictions necessary to keep the permit area safe. The holder of a
conditional certificate of compliance shall proceed only to the point for which approval has been given, at
the permit holder’s own risk and without assurance that approval for the occupancy or the utilization of the
entire premises, equipment or operations will be granted.
105.2.3 Compliance with code. The issuance or granting of a permit shall not be construed to be a permit
for, or an approval of, any violation of any of the provisions of this code or of any other regulation or
ordinance of Montgomery County. Permits presuming to give authority to violate or cancel the provisions of
this code or other regulation or ordinances of Montgomery County shall not be valid. The issuance of a
permit based on construction documents and other data shall not prevent the fire code official from requiring
10

Page 21 of 100

the correction of errors in the construction documents and other data. Any addition to or alteration of
approved construction documents shall be approved in advance by the Fire Marshal, as evidenced by the
issuance of a new or amended permit.
105.2.4 Validity of permit. The issuance or granting of a permit shall not be construed to be a permit for, or
an approval of, any violation of any of the provisions of this code or of any other regulation or ordinances of
Montgomery County. Permits presuming to give authority to violate or cancel the provisions of this code or
other regulation or ordinances of Montgomery County shall not be valid. The issuance of a permit based on
construction documents, operational documents and other data shall not prevent the fire code official from
requiring correction of errors in the documents or other data.
105.3 Construction documents. Construction documents shall be in accordance with Sections 105.4.1
through 105.4.6.
105.3.1 Submittals. Construction documents and supporting data shall be submitted in two or more sets with
each application for a permit and in such form and detail as required by the Fire Marshal.
105.3.1.1 Examination of documents. The Fire Marshal shall examine or cause to be examined the
accompanying construction documents and shall ascertain by such examinations whether the work indicated
and described is in accordance with the requirements of this code.
105.3.2 Information on construction documents. Construction documents shall be drawn to scale or
dimensioned, and on suitable material. Electronic media documents are preferred. Construction documents
shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in
detail that it will conform to the provisions of this code and relevant laws, ordinances, rules and regulations
as determined by the fire code official and Fire Marshal.
105.3.2.1 Fire protection system shop drawings. Shop drawings for the fire protection system(s) shall be
submitted to indicate compliance with this code and the construction documents, and shall be approved
prior to the start of installation. Shop drawings shall contain all information as required by the referenced
installation standards in Chapter 9.
105.3.3 Applicant responsibility. It shall be the responsibility of the applicant to ensure that the construction
documents include all of the fire protection requirements and the shop drawings are complete and in
compliance with the applicable codes and standards.
105.3.4 Approved documents. Construction documents approved by the Fire Marshal are approved with the
intent that such construction documents comply in all respects with this code. Review and approval by the
Fire Marshal shall not relieve the applicant of the responsibility of compliance with this code.
105.3.4.1 Phased approval. The Fire Marshal is authorized to issue a permit for the construction of part of a
structure, system or operation before the construction documents for the whole structure, system or
operation have been submitted, provided that adequate information and detailed statements have been
filed complying with pertinent requirements of this code. The holder of such permit for parts of a structure,
system or operation shall proceed at the holder’s own risk with the building operation and without
assurance that a permit for the entire structure, system or operation will be granted.
11

Page 22 of 100

105.4.5 Amended construction documents. Work shall be installed in accordance with the approved
construction documents, and any changes made during construction that are not in compliance with the
approved construction documents shall be resubmitted for approval as an amended set of construction
documents.
105.5 Revocation. The fire code official or Fire Marshal is authorized to revoke a permit issued under the
provisions of this code where it is found by inspection or otherwise that there has been a false statement or
misrepresentation as to the material facts in the application or construction documents on which the permit
or approval was based including, but not limited to, any one of the following:
1. The permit is used for a location or establishment other than that for which it was issued.
2. The permit is used for a condition or activity other than that listed in the permit.
3. Conditions and limitations set forth in the permit have been violated.
4. There have been any false statements or misrepresentations as to the material fact in the application for
permit or plans submitted or a condition of the permit.
5. The permit is used by a different person or firm than the name for which it was issued.
6. The permittee failed, refused or neglected to comply with orders or notices duly served in accordance with
the provisions of this code within the time provided therein.
7. The permit was issued in error or in violation of an ordinance, regulation or this code.

12

Page 23 of 100

SECTION 106
FEES
106.1 Fees. A permit shall not be issued until the fees have been paid, nor shall an amendment to a permit
be released until the additional fee, if any, has been paid.
106.2 Schedule of permit fees. A fee for each permit shall be paid as required, in accordance with the
schedule as established by Montgomery County Commissioners Court.
106.3 Work commencing before permit issuance. A person who commences any work, activity or operation
regulated by this code before obtaining the necessary permits shall be subject to an additional fee
established by the Montgomery County Commissioners Court, which shall be in addition to the required
permit fees.
106.4 Related fees. The payment of the fee for the construction, alteration, removal or demolition of work
done in connection to or concurrently with the work or activity authorized by a permit shall not relieve the
applicant or holder of the permit from the payment of other fees that are prescribed by law.

13

Page 24 of 100

SECTION 107
INSPECTIONS
107.1 Inspection authority. The fire code official is authorized to enter and examine any building, structure,
marine vessel, vehicle or premises in accordance with Section 104.3 for the purpose of enforcing this code.
107.2 Inspections. The fire code official is authorized to conduct such inspections as are deemed necessary
to determine the extent of compliance with the provisions of this code and to approve reports of inspection
by approved agencies or individuals. Reports of such inspections shall be prepared and submitted in writing
for review and approval. Inspection reports shall be certified by a responsible officer of such approved
agency or by the responsible individual. The fire code official is authorized to engage such expert opinion as
deemed necessary to report on unusual, detailed or complex technical issues subject to the approval of the
governing body.
107.2.1 Inspection requests. It shall be the duty of the holder of the permit or their duly authorized agent to
notify the Fire Marshal’s Office when work is ready for inspection. It shall be the duty of the permit holder to
provide access to and means for inspections of such work that are required by this code.
107.2.2 Approval required. Work shall not be done beyond the point indicated in each successive inspection
without first obtaining the approval of the fire code official. The fire code official, on notification, shall make
the requested inspections and shall either indicate the portion of the construction that is satisfactory as
completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code.
Any portions that do not comply shall be corrected, and such portion shall not be covered or concealed until
authorized by the fire code official.
107.3 Concealed work. It shall be the duty of the permit applicant to cause the work to remain visible and
able to be accessed for inspection purposes. Where any installation subject to inspection prior to use is
covered or concealed without having first been inspected, the fire code official shall have the authority to
require that such work be made visible and able to be accessed for inspection. Neither the fire code official
nor Montgomery County shall be liable for expense entailed in the removal or replacement of any material
required to allow inspection.
107.4 Approvals. Approval as the result of an inspection shall not be construed to be an approval of a
violation of the provisions of this code or of other regulations or ordinances of Montgomery County.
Inspections presuming to give authority to violate or cancel provisions of this code or of other regulation or
ordinances of Montgomery County shall not be valid.

14

Page 25 of 100

SECTION 108
MAINTENANCE
108.1 Maintenance of safeguards. Where any device, equipment, system, condition, arrangement, level of
protection, or any other feature is required for compliance with the provisions of this code, or otherwise
installed, such device, equipment, system, condition, arrangement, level of protection, or other feature shall
thereafter be continuously maintained in accordance with this code and applicable referenced standards.
108.2 Testing and operation. Equipment requiring periodic testing or operation to ensure maintenance shall
be tested or operated as specified in this code.
108.2.1 Re‐inspection and testing. Where any work or installation does not pass an initial test or inspection,
the necessary corrections shall be made so as to achieve compliance with this code. The work or installation
shall then be resubmitted to the fire code official for inspection and testing.
108.3 Recordkeeping. A record of periodic inspections, tests, servicing and other operations and
maintenance shall be maintained on the premises or other approved location for not less than 5 years, or a
different period of time where specified in this code or referenced standards. Records shall be made
available for inspection by the fire code official, and a copy of the records shall be provided to the fire code
official on request. The fire code official is authorized to prescribe the form and format of such
recordkeeping. The fire code official is authorized to require that certain required records be filed with the
fire code official.
108.4 Supervision. Maintenance and testing shall be under the supervision of a responsible person who shall
ensure that such maintenance and testing are conducted at specified intervals in accordance with this code.
108.5 Rendering equipment inoperable. Portable or fixed fire‐extinguishing systems or devices, and fire‐
warning systems, shall be provided with ready access and shall not be rendered inoperative, except as
necessary during emergencies, maintenance, repairs, alterations, drills or prescribed testing.
108.6 Overcrowding. Overcrowding or admittance of any person beyond the approved capacity of a building
or a portion thereof shall not be allowed. The fire code official, on finding any overcrowding conditions or
obstructions in aisles, passageways or other means of egress, or on finding any condition that constitutes a
life safety hazard, shall be authorized to cause the event to be stopped until such condition or obstruction is
corrected or require removal of occupants at a location when actual occupancy exceeds the permitted or
posted occupant load. A person commits an offense if he refuses to obey an order to vacate.

15

Page 26 of 100

SECTION 109
VIOLATIONS
109.1 Unlawful acts. It shall be unlawful for a person, firm or corporation to erect, construct, alter, repair,
remove, demolish or utilize a building, occupancy, premises or system regulated by this code, or cause same
to be done, in conflict with or in violation of any of the provisions of this code. No work shall be commenced
on any fire protection system at a new construction site or an existing structure, other than maintenance
work, without a permit being issued or by approval to begin work by the Fire Code Official or Fire Marshal.
Both the individual contractor, along with the site general contractor will be held liable for such actions.
Where work is commenced prior to obtaining said permit, the fees may be increased as determined by the
fee schedule adopted by Commissioners Court. Payment of the increased fee shall not relieve any person
from fully complying with the requirements to obtain a permit nor of any other penalties herein.
109.2 Owner/occupant responsibility. Correction and abatement of violations of this code shall be the
responsibility of the owner or the owner’s authorized agent. Where an occupant creates, or allows to be
created, hazardous conditions in violation of this code, the occupant shall be held responsible for the
abatement of such hazardous conditions.
109.3 Notice of violation, Fire Marshal Order, or citation. Where the fire code official finds a building,
premises, vehicle, storage facility or outdoor area that is in violation of this code, the fire code official is
authorized to prepare a written notice of violation, Fire Marshal’s order, describing the conditions deemed
unsafe and, where compliance is not immediate, specifying a time for re‐inspection.
109.3.1 Service. A notice of violation issued pursuant to this code shall be served on the owner, the owner’s
authorized agent, operator, occupant or other person responsible for the condition or violation, either by
personal service, mail or by delivering the same to, and leaving it with, some person of responsibility on the
premises. For unattended or abandoned locations, a copy of such notice of violation shall be posted on the
premises in a conspicuous place at or near the entrance to such premises and the notice of violation shall be
mailed by certified mail with return receipt requested or a certificate of mailing, to the last known address of
the owner, the owner’s authorized agent, or occupant.
109.3.2 Compliance with orders and notices. A notice of violation issued or served as provided by this code
shall be complied with by the owner, the owner’s authorized agent, operator, occupant or other person
responsible for the condition or violation to which the notice of violation pertains. In cases of extreme
danger to persons or property, immediate compliance is required. If the building or other premises is not
owner occupied, under lease, or otherwise, and the order or notice requires additions or changes in the
building or premises which would immediately become real estate and be the property of the owner of the
building or premises, such orders or notices shall be complied with by the owner unless the owner and the
occupant have agreed otherwise at which event the occupant shall comply.
109.3.3 Prosecution of violations. If the notice of violation is not complied with promptly, the fire code
official is authorized to request the legal counsel of Montgomery County to institute the appropriate legal
proceedings at law or in equity to restrain, correct or abate such violation or to require removal or
termination of the unlawful occupancy of the structure in violation of the provisions of this code or of the
order or direction made pursuant hereto.

16

Page 27 of 100

109.3.4 Unauthorized tampering. Signs, tags or seals posted or affixed by the fire code official or Fire
Marshal shall not be mutilated, destroyed or tampered with, or removed, without authorization from the
issuer.
109.4 Abatement of violation. In addition to the imposition of the penalties herein described, the fire code
official is authorized to institute appropriate action to prevent unlawful construction or to restrain, correct or
abate a violation; or to prevent illegal occupancy of a structure or premises; or to stop an illegal act, conduct
of business or occupancy of a structure on or about any premises.

17

Page 28 of 100

SECTION 110
UNSAFE BUILDINGS
110.1 General. If during the inspection of a premises, a building or structure, or any building system, in
whole or in part, constitutes a clear and inimical threat to human life, safety or health, the fire code official
shall issue such notice or orders to remove or remedy the conditions as shall be deemed necessary in
accordance with this section, and shall refer the building to the Fire Marshal for any repairs, alterations,
remodeling, removing or demolition required.
110.1.1 Unsafe conditions. Structures or existing equipment that are or hereafter become unsafe or
deficient because of inadequate means of egress, that constitute a fire hazard, are otherwise dangerous to
human life or the public welfare, or involve illegal or improper occupancy or inadequate maintenance, shall
be deemed an unsafe condition. A vacant structure that is not secured against unauthorized entry as
required by Section 311 shall be deemed unsafe.
110.1.2 Structural hazards. Where an apparent structural hazard is caused by the faulty installation,
operation or malfunction of any of the items or devices governed by this code, the fire code official shall
immediately notify the building code official in accordance with Section 109.1.
110.2 Evacuation. The fire code official or the fire department official in charge of an incident shall be
authorized to order the immediate evacuation of any occupied building deemed unsafe where such building
has hazardous conditions that present imminent danger to building occupants. Persons so notified shall
immediately leave the structure or premises and shall not enter or re‐enter until authorized to do so by the
fire code official or the fire department official in charge of the incident.
110.3 Abatement. The owner, the owner’s authorized agent, operator or occupant of a building or premises
deemed unsafe by the fire code official shall abate or cause to be abated or corrected such unsafe conditions
either by repair, rehabilitation, demolition or other approved corrective action.

18

Page 29 of 100

EXHIBIT A
ADDITIONS, INSERTIONS, DELETION AND CHANGES TO THE ADOPTED
INTERNATIONAL FIRE CODE and INTERNATIONAL BUILDING CODE ‐ 2024 EDITION
AS APPROVED BY MONTGOMERY COUNTY.

CHAPTER 1
SCOPE AND ADMINISTRATION
CHAPTER 1 is deleted in its entirety and is replaced by Chapter 1 of the Montgomery County Fire Code as
adopted by Montgomery County and to which this Exhibit is attached is substituted in its place.
Notwithstanding any other provision of the Montgomery County Fire Code which might otherwise be
interpreted to the contrary, the Montgomery County Fire Code shall not be construed as requiring any
license or permit not specifically required by Chapter 1 unless required by other applicable law.

19

Page 30 of 100

CHAPTER 2
DEFINITIONS
SECTION 202 is amended to include the following revised or additional definitions:

ADULT CARE FACILITY. See Institutional I‐4 occupancy definition.
ALTERNATE HOUSING FACILITY. A residence in which three or more unrelated parolees reside that is owned
by an individual, private entity, a non‐profit or faith‐based organization, but is not operated by, established
by, or contracted with the Texas Department of Criminal Justice.

AMBULATORY CARE FACILITY. Buildings or portions thereof used to provide medical, surgical, psychiatric,
nursing or similar care on a less‐than‐24‐hour basis to persons who are rendered incapable of self‐
preservation by the services provided or staff has accepted responsibility for care recipients already
incapable. This group may include but not be limited to the following:
Dialysis Centers
Sedation Dentistry
Surgery Centers
Colonic Centers
Psychiatric Centers
ASSISTED LIVING FACILITY. An establishment that furnishes in one or more facilities, food and shelter to four
or more persons who are unrelated to the proprietor of the establishment and provides personal care services
or administration of medication by a licensed person or may provide limited skilled nursing services as outlined
in the Texas Health and Safety Code chapter 247.
CRITICAL FACILITIES. Those facilities essential to the preservation of life and property, including, but not
limited to, type E occupancies of permanent construction and occupant load greater than 1000, nursing
homes, assisted living homes, hospitals, police, fire and emergency response installations, and facilities used
for the storage of critical records.
ELECTRIC VEHICLE CHARGING STATION. One or more vehicle spaces served by an electric vehicle charging
system.
FOSTER GROUP HOME. A child‐care facility that provides care for 7 to 12 children on a 24‐hour basis.
FOSTER HOME. A child‐care facility that provides care for not more than six children on a 24‐hour basis.

GENERAL RESIDENTIAL OPERATION. A child‐care facility that provides care for more than 7 children for 24
hours a day, including facilities known as children’s homes, halfway houses, residential treatment centers,
emergency shelters, and therapeutic camps.
20

Page 31 of 100

GROUP HOME. A residential board and care facility with at least three and no more than sixteen clients for
social rehabilitation, substance abuse or mental health problems containing a group housing arrangement
that provides custodial care but does not provide acute care.
LODGING HOUSE. A one‐family dwelling that furnishes lodging, for payment, to three but not more than
sixteen persons and one or more of the occupants are primarily permanent in nature. The term lodging house
shall include the following:
Boarding Home, Emergency Shelters, Halfway Houses, Flophouses, and Alternative Living Facilities, however,
the term shall not include, hotels, motels, bed and breakfast facilities, or single‐family residential building,
condominium, or townhouse.
INSTITUTIONAL GROUP I‐1. Institutional Group I‐1 occupancy shall include buildings, structures or portions
thereof for more than 16 persons, excluding staff, who reside on a 24‐hour basis in a supervised environment
and receive custodial care. Buildings of Group I‐1 shall be classified as one of the occupancy conditions
indicated below and shall comply with Section 420 of the International Building Code. This group shall include,
but not be limited to, the following:
Alcohol and drug centers
Assisted living facilities
Congregate care facilities
Convalescent facilities
Group homes
General residential operation
Halfway houses
Residental Board and Care – Large A
Residential board and care
Social rehabilitation facilities
INSTITUTIONAL GROUP I‐2. Institutional Group I‐2 occupancy shall include buildings and structures used for
medical care on a 24‐hour basis for more than five persons who are not capable of self‐preservation, and not
otherwise classified as a This group shall include, but not be limited to, the following:
Foster care facilities
Detoxification facilities
Hospitals
Nursing homes
Residental Board and Care – Large B
Psychiatric hospital
Child and Adult day care facilities, operated on a 24‐hour basis
Occupancy Conditions. Buildings of Group I‐2 shall be classified as one of the following occupancy
conditions and shall comply with Section 407 of the International Building Code:
Condition 1. This occupancy condition shall include facilities that provide nursing and medical care
but do not provide emergency care, surgery, obstetrics, or in‐patient stabilization units for
psychiatric or detoxification, including, but not limited to, nursing homes and foster care facilities.
Condition 2. This occupancy condition shall include facilities that provide nursing and medical care
and could provide emergency care, surgery, obstetrics, or inpatient stabilization units for
psychiatric or detoxification, including, but not limited to, hospitals.
21

Page 32 of 100

RESIDENTIAL GROUP R‐3. Residential Group R‐3 occupancies where the occupants are primarily permanent in
nature and not classified as Group R‐1, R‐2, R‐4 or I, including:
Buildings that do not contain more than two dwelling units
Community Homes in compliance with Human Resource Code Chapter 123
Congregate living facilities (non‐transient) with 16 or fewer occupants
Convents
Dormitories
Fraternities and sororities
Monasteries
Conversion of an existing single‐family dwelling into a Boarding or Lodging house.
RESIDENTIAL GROUP R‐4. Residential Group R‐4 shall include buildings, structures or portions thereof for more
than five but not more than 16 persons, excluding staff, who reside on a 24‐hour basis in a supervised
residential environment and receive custodial care. Buildings of Group R‐4 shall be classified as one of the
occupancy conditions indicated below. This group shall include, but not be limited to, the following:
Alcohol and drug centers
Assisted living facilities
Congregate care facilities
Halfway houses
Residential board and care facilities
Social rehabilitation facilities
Group R‐4 occupancies shall meet the requirements for construction as defined for Group R‐3, except
as otherwise provided for in the International Building Code.
Condition 1. This occupancy condition shall include buildings in which all persons receiving custodial
care, without any assistance, are capable of responding to an emergency situation to complete
building evacuation.
Condition 2. This occupancy condition shall include buildings in which there are any persons receiving
custodial care who require limited verbal or physical assistance while responding to an emergency
situation to complete building evacuation.
PERSONAL CARE SERVICE. Assistance with feeding, dressing, moving, bathing, or other personal needs or
maintenance, or general supervision or oversight of the physical and mental well‐being of a person who needs
assistance to maintain a private and independent residence in an assisted living facility or who needs assistance
to manage the person's personal life, regardless of whether a guardian has been appointed for the person.
RESIDENTIAL CARE SERVICES. Shelter, protection, meals, health care, mobility assistance, or personal care
services, including bathing, dressing, and eating.
START OF CONSTRUCTION. Construction begins on the date that ground is broken for a building, or if no
ground is broken, on the date that:
1. The first materials are added to the original property;
2. Foundation pilings are installed on the original property;
3. A manufactured building or relocated structure is placed on a foundation on the original property.

22

Page 33 of 100

CHAPTER 5
FIRE SERVICE FEATURES
SECTION 510 is amended to read as follows:
SECTION 510 – 2024 IFC
EMERGENCY RESPONDER RADIO COVERAGE
510.1 Emergency responder radio coverage in buildings. Buildings subject to the Montgomery County Fire
Code shall have approved radio coverage for emergency responders within the building based on the existing
coverage levels of the public safety communication systems utilized by the jurisdiction, measured at the
exterior of the building. Coverage shall include the Montgomery County Radio System (TxWARN). The
frequency range to be supported is 700‐800 MHz (FDMA and TDMA)). Any building or structure that fails to
support adequate radio coverage must be brought into compliance. The owner shall immediately contact the
Montgomery County Fire Marshal’s Office to report the system failure. This section shall not require
improvement of the existing public safety communication systems.
510.1.1 Emergency responder radio coverage compliance. All new installation must comply with
Montgomery County standards and guidelines. ERRC guidelines are available upon request from the Fire
Marshal’s Office.

23

Page 34 of 100

SECTION 611
ELECTRIC VEHICLE CHARGING STATIONS
611.1 General. Electrical vehicle charging stations shall comply with this section.
611.1.1 Location of charging stations. Battery electric vehicle charging stations as follows:
1. Ten feet or more from the lot line of the property.
2. Twenty feet from a required exit discharge of a structure.
3. So that all portions of the vehicle being charged will be on the premises of the battery electric
vehicle charging station.
611.2 Emergency Disconnects/Shutoff Switches. Locations containing electric vehicle charging stations shall
be provided with a clearly identified emergency disconnect/estops, provided with ready access and installed
in an approved location. The emergency power disconnect/shutoff switch shall shut off all power from the
charging station when activated.
611.2.1 Alternative disconnects. Where approved, a disconnect provided to comply with NFPA 70 can be
utilized to meet the disconnect requirement when it is clearly identified, and the location is provided with
ready access.
611.2.2 Location. Emergency disconnect/shutoff switches shall be installed not more than 100 feet and
not less than 20 feet from the charging stations.
611.2.3 Height. Emergency disconnect/shutoff switches shall be not less than 42 inches (1067 mm) and
not more than 48 inches (1372 mm) measured vertically above the walking surface.
611.2.4 Labeling. Emergency disconnect switches shall be clearly visible and labeled to correspond to the
associated charging station. The emergency disconnect/shutoff shall be labeled “EMERGENCY ELECTRIC
VEHICLE CHARGER DISCONNECT” in letters not less than 4 inches high.
611.2.5 Manual reset. Emergency disconnect/shutoff switches shall require manual intervention to reset
after activation.
611.3 Fire extinguishers. Approved portable fire extinguishers complying with Section 906 with a minimum
rating of 2‐A:20‐B:C shall be provided and located such that an extinguisher is not more than 75 feet (23 860
mm) from electric vehicle charging stations.

24

Page 35 of 100

CHAPTER 9
FIRE PROTECTION SYSTEMS
903.2.9.4. Group S‐1. Upholstered furniture and mattresses.
Exception: The exception is deleted.
903.2.10 Group S‐2 Parking Garages.
4. Where electric vehicle charging is allowed on any floor of an open or enclosed parking garage.
903.2.11.3: Buildings 55 feet or more in height or Greater than 2 stories.
An automatic sprinkler system shall be installed throughout buildings that have one or more stories
with and occupant load of 10 or more located 55 feet or more in height or greater than 2 stories above the
lowest level of fire department vehicle access.
903.3.5.3. Combination Fire and Domestic or Dedicated Fire Mains.
Any underground water main regardless of name given by engineering, architectural, or plumbing
design that is on private property and not governed by and installed by a public water system, public utility,
or water utility provider that provides water to or for:
1. Fire hydrant.
2. Fire sprinkler system.
3. Fire standpipe system.
4. Fire Pump.
5. Dry fire hydrant.
6. Any other system regulated by this code.
Shall comply with NFPA 24 from the point the water main enters the property or leaves control of water
provider or as defined by the fire code official.
903.4.3 Alarms. An approved audible device, located on the exterior of the building in an approved
location, shall be connected to each automatic sprinkler system. Such sprinkler waterflow alarm devices shall
be activated by water flow equivalent to the flow of a single sprinkler of the smallest orifice size installed in
the system. Where a fire alarm system is installed, actuation of the automatic sprinkler system shall actuate
the building fire alarm system, meet the requirements of 903.4.3.1.
903.4.3.1. Occupancy notification. Provide occupant notification in accordance with Section 907.5 in all
areas under the protection of the automatic sprinkler system.
903.7 Required minimum safety pressure. An automatic fire sprinkler system shall be required a minimum
hydraulically calculated safety pressure of ten (10) psi or greater, unless approved by the Fire Code Official.
907.2 Where required—new buildings and structures. An approved fire alarm system installed in
accordance with the provisions of this code and NFPA 72 shall be provided in new buildings and structures in
accordance with Sections 907.2.1 through 907.2.23 and provide occupant notification in accordance with
Section 907.5, unless other requirements are provided by another section of this code.
All buildings under the protection of a fire sprinkler system shall have full occupancy notification throughout
the entire structure and shall be provide with smoke detection as required below and in accordance with
other applicable code sections.
25

Page 36 of 100

All building that require a fire or smoke detection system shall also comply with this section, and provide
occupant notification throughout and smoke detection as required below and in accordance with other
applicable code sections.
The automatic fire detectors shall be smoke detectors. Where ambient conditions prohibit installation of
automatic smoke detection, other automatic fire detection shall be allowed.
All manual, automatic or manual and automatic fire alarm systems shall also include smoke detectors in each
mechanical equipment, electrical, transformer, telephone equipment, corridors, lobbies, storage rooms
larger than 200 square feet, elevator machine rooms, elevator lobbies, and other areas determined to be a
special hazard by the County Fire Marshal.
Not fewer that one manual fire alarm box shall be provided in an approved location to initiate a fire alarm
signal for fire alarm systems employing automatic fire detectors or waterflow detection devices. Where
other sections of this code allow elimination of the fire alarm boxes due to sprinklers, a single fire alarm box
shall be installed.

26

Page 37 of 100

CHAPTER 32
HIGH PILED COMBUSTIBLE STORAGE
SECTION 3201 is amended by the addition of Section 3201.5, to read as follows:
SECTION 3201.5 Required Specialized Engineered Plans. All high piled storage facilities shall be designed
with the assistance of an engineer specializing in fire protection, licensed in the State of Texas.

27

Page 38 of 100

CHAPTER 50
HAZARDOUS MATERIALS – GENERAL PROVISIONS
5001.7 is amended by the addition of Section 5001.7, to read as follows:
SECTION 5001.7 REQUIRED SPECIALIZED ENGINEERED PLANS. All Group H occupancies shall be designed
with the assistance of an engineer specializing in fire protection, licensed in the State of Texas.

28

Page 39 of 100

CHAPTER 56
EXPLOSIVES AND FIREWORKS
5609.1.1 Applicability. This Section 5609 provides standards for the design and construction of buildings in
which Fireworks 1.4G are to be stored, sold, or displayed. Such design and construction shall comply with
this section and the Texas Fireworks Rules, current edition, as promulgated by the Texas Fire Marshal’s
Office.
5609.1.2 Compliance with Fire Code. All structures used for the storage or sale of consumer fireworks 1.4G
shall comply with the applicable provisions of the Montgomery County Fire Code for new structures, and
with applicable sections of this sub‐section.
5609.1.3 Fire Code Permit and Inspections. Any structure that is erected, occupied, or moved into or within
the jurisdiction is considered new construction and requires a Fire Code permit and an inspection to ensure
compliance with the adopted code.
5609.3 Conflict between provisions. If there is a conflict between the provisions of this section and the
Fireworks Rules, the more stringent of the provisions shall apply.
5609.3.1 Limit of authority. This section does not limit the authority of the County Fire Marshal to inspect
any retail site location or storage facility to require additional fire protection measures.
5609.4 Requirements for all retail sales, displays, and storage sites and facilities. All Fireworks 1.4G retail
sales sites, storage buildings, and control areas, including temporary storage facilities such as trailers, semi‐
trailers, or metal shipping containers must conform to the minimum standards of this section.
5609.4.2 Residential Storage. Fireworks 1.4G retail storage buildings shall not be used for residential
occupancies. Use of a residential building for the storage of fireworks in excess of 125 pounds of pyrotechnic
material shall be considered a change in occupancy.
5609.4.3 Maximum allowable quantity. No more than 125 pounds of pyrotechnic material may be stored
and/or displayed in any control area. In the absence of documentation approved by the fire code official, 25
percent of the gross weight of the fireworks, including all packaging, will be used to determine the 125
pound limitation.
Exception:
1. The maximum allowable quantities can be increased 100 percent if the building is equipped
throughout with an automatic sprinkler system in accordance with Section 903.
2. The maximum allowable quantities may be greater than allowed by this section, subject to
approval by the County Fire Marshal, if the building meets all requirements for a Group H‐3
occupancy and Section 5609.4. The aggregate quantity in use and storage shall not exceed the
quantity listed for storage in the Application for Permit.
5609.5 Specific requirements for retail fireworks sites other than stands. All indoor retail fireworks sites
and storage facilities, other than stands, shall comply with the requirements of this section.
5609.5.1 Building Design. The retail fireworks sales building shall be a free standing, durable structure with
no basement, and only one story.
29

Page 40 of 100

5609.5.2 Multi‐use building prohibited. The fireworks sales area shall not be part of a multi‐use or multi‐
tenant building, except that office areas and restrooms ancillary to the building are allowed if:
1. Offices and related spaces are separated from fireworks storage or sales areas by fire barriers having a fire
resistance rating of not less than 1 hour; and
2. Window openings in the fire barrier wall are protected by self‐closing fire doors or fixed fire windows
having a fire protection rating of not less than 3/4 hour, and installed in accordance with NFPA 80, Standard
for Fire Doors and Fire Windows.
5609.5.4 Application, Plans, Approval, Permits. All newly constructed firework retail sites other than stands
shall comply with the adopted Montgomery County Fire Code Regulation and all processes shall be followed
for plan submittal, approval, permitting, and inspection.
5609.5.5 Emergency response plan. The operator of each indoor retail sales site or storage facility shall
prepare a written emergency response plan in accordance with Chapter 4 of this Code. The evacuation plan
shall be posted in a conspicuous location that is accessible to the public as well as to persons employed or
otherwise working in the facility.
5609.5.6 Maximum occupant load. The approved maximum occupant load shall be conspicuously posted
near the main entrance using a format approved by the fire code official. Records of occupant load will be
maintained onsite and available for inspection by the fire code official.
5609.5.7 Means of Egress. All means of egress in consumer fireworks retail sales facilities, other than stands,
shall comply with the applicable requirements of this section.
5609.5.7.1 Minimum number of exits. The minimum number of exits provided from the retail sales area
shall be not less than three, or more as determined in accordance with this Code.
5609.5.7.2 Maximum travel distance. Exits provided for the retail sales area of consumer fireworks retail
sales facilities, other than stands, shall be located so that the maximum egress travel distance, measured
from the most remote point to an exit along the natural and unobstructed path of egress travel, does not
exceed 75 ft.
5609.7.5 Egress door swing. Unless approved by the County Fire Marshal, all egress doors shall be of the
side‐ hinge swinging type and shall be arranged to swing in the direction of egress travel.
5609.7.6 Panic Hardware. Every egress door that has a latching device shall be provided with approved panic
hardware.
5609.7.7 Roll‐up, or lift doors. Roll‐up or lift doors may be used as egress doors when there is a readily
distinguishable device that secures each door in the open position whenever the building is occupied.
5609.5.9 Fire protection.
5609.5.9.1 Fire Extinguishers. Portable fire extinguishers shall be specified as required for extra (high) hazard
occupancy in accordance with NFPA 10, Standard for Portable Fire Extinguishers.

30

Page 41 of 100

5609.5.9.1.1 Number and Placement. Every indoor retail sales building shall have not less than two portable
fire extinguishers with a minimum 2A rating. At least one approved Class A fire extinguisher shall be provided
for each 1,000 square feet of floor space, not to exceed 75 ft. travel distance.
5609.5.9.2 Fire alarm system. A fire alarm system, installed in accordance with NFPA 72, shall be required in
all consumer fireworks retail sales facilities.
5609.5.9.3 Automatic fire sprinklers. An automatic sprinkler system shall be required in all consumer
fireworks retail sales facilities, storage or bulk storage facility. Buildings over than 2,500 sq. ft. in area shall be
provided a fire sprinkler system that complies with NFPA 13 throughout building.
5609.5.10 Other codes, standards, and laws. Unless specifically outlined in this chapter, all retail fireworks
sites shall comply with the other applicable chapters of this code, the Texas Occupations Code 2154, Texas
Local Government Code 352, and the Texas Fireworks Rules.

31

Page 42 of 100

CHAPTER 80
REFERENCE STANDARDS
CHAPTER 80 is amended to read as follows:
The opening paragraph to CHAPTER 80 is amended as follows:
This chapter lists the standards that are referenced in various sections of this document. The standards are
listed herein by the promulgating agency of the standard, the standard identification, effective date and title,
and the section or sections of this document that reference the standard. If the State of Texas has adopted
any of the listed standards, the more stringent and/or more current standard of the provisions shall apply.
CHAPTER 80 is amended to include the following reference standards:
NFPA 101® Life Safety Code®— Current State adopted edition
NFPA 24 – Standard for the Installation of Private Fire Service Mains and their Appurtenances
APPENDIX B – Fire Flow for Buildings
SECTION B103.3.1 Residential Subdivisions without water supply system.
No residential subdivision (wholly or partially) in Montgomery County shall be planned or approved without
adequate water supply complying with B105.1(1) or B105.1(2). All residential subdivisions shall be equipped
with fire hydrants and spaced per Appendix C and provide required fire flow, pressure and duration.
APPENDIX D ‐ FIRE APPARATUS ACCESS ROADS
SECTION D106.1 IS AMENDED TO READ AS FOLLOWS:
D106.1 Projects having more than 30 dwelling units.
Multiple‐Family residential projects having more than 30 dwelling units shall be equipped throughout with
two separate and approved fire apparatus access roads.
Exception: Deleted in its entirety
D106.2 is deleted in its entirety.

Appendix P ‐ Manufactured Home and Recreational Vehicle Parks
P101.1 Definitions
MANUFACTURED HOME. A structure constructed on or after June 15, 1976, according to the rules of the
United States Department of Housing and Urban Development, transportable in one or more sections,
which, in the traveling mode, is eight (8) body feet or more in width or forty (40) body feet or more in length,
or, when erected on site, is three hundred twenty (320) or more square feet, and which is built on a
32

Page 43 of 100

permanent chassis and designed to be used as a dwelling with or without a permanent foundation when
connected to the required utilities, and includes the plumbing, heating, air‐conditioning, and
electrical systems. The term does not include a recreational vehicle as that term is defined by 24 CFR §
3282.8(g).
LOT. A plot of ground within a mobile home park or recreational vehicle park as indicated on the
construction plan, which is designed to accommodate one (1) manufactured home or recreational vehicle
respectively.
MANUFACTURED HOME or MANUFACTURED HOUSING. Includes the terms HUD‐code manufactured home
and mobile home, and collectively means and refers to both.
MANUFACTURED HOME ACCESSORY STRUCTURE. Any structural addition to a manufactured home or mobile
home park lot which includes awnings,,, cabanas, carports, Florida rooms, porches, storage cabinets and
buildings, and similar appurtenant structures.
MANUFACTURED HOME. A structure that was constructed before June 15, 1976, transportable in one (1) or
more sections, which, in the traveling mode, is eight (8) body feet or more in width or forty (40) body feet or
more in length, or, when erected on site, is three hundred twenty (320) or more square feet, and which is
built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation
when connected to the required utilities, and includes the plumbing, heating, air‐conditioning, and
electrical systems.
MANUFACTURED HOME PARK A unified development of lots arranged on a tract of land under common
ownership, which has been planned and improved for the placement of two (2) or more manufactured
homes for non‐transient occupancy.
PERMANENT FOUNDATION. A manufactured home stand constructed per the requirements of the Texas
Department of Labor and Standards.
RECREATIONAL VEHICLE. A vehicle which is: (a) built on a single chassis; (b) four hundred (400) square feet or
less when measured at the largest horizontal projections; (c) self‐propelled or permanently towable by an
automobile or light duty truck; (d) designed primarily not for use as a permanent dwelling but as temporary
living quarters for recreational, camping, travel, or seasonal use; and (e) required by Texas law to have a
valid vehicle registration when traveling upon public streets. It shall not include a manufactured home.
RECREATIONAL VEHICLE PARK. A unified development on a tract of land under common ownership designed
primarily for transient service, on which recreational vehicles of the general public are parked or situated.

Section P201 Manufactured Home Park Fire Safety Standards
P201.1 Applicability
All manufactured home parks and manufactured homes shall be constructed and maintained in accordance
with this appendix, and all other applicable provisions of the County Fire Code. Any reference to "mobile
home" elsewhere in the County Fire Code shall mean "manufactured home" as defined by this appendix.
Section P202 Installation and Fire Safety
33

Page 44 of 100

P202.1 The manufactured home shall be properly placed on its stand and anchored to a permanent
foundation. All utilities shall be properly installed in accordance with the instructions of the park's owner or
operator and utility providers, in accordance with all applicable State Law.
P202.2 A noncombustible skirting shall be installed around the manufactured home. Such skirting may
include any vents, screens, and/or openings necessary for utility and mechanical system hookups.
P202.3 The skirting, and any porches, stairs, awnings, and other additions shall be constructed, installed, and
maintained in good repair. All requirements of the County Fire Code pertaining to single family
developments shall be applicable.
P202.4 The space beneath a manufactured home shall not be used for storage.

Section P301 Recreational Vehicle Park Standards
P301.1 Applicability.
All recreational vehicle parks shall be constructed and maintained in accordance with this appendix, and all
other applicable provisions of the County Fire Code.
P302 Fire Safety Instruction.
Each recreational vehicle park, owner or operator, shall ensure that its park staff is instructed in the use of
park fire protection equipment and in their specific duties in the event of a fire.

Section P401 Fire Protection Features for Manufactured Home and Recreational Vehicle Parks
P401 Fire Department Access Roads
Fire Department access roads within the development shall meet the minimum design and installation
standards adopted by the County for residential developments. “No Parking Tow Away” Signs will be
required on both sides of streets less than 26 ft in width. “No Parking Tow Away” signs are required on one
side for Streets 26 to 36 ft wide.
P402 Access.
Manufactured Home and Recreational Vehicle Parks projects having more than 30 units shall be equipped
throughout with two separate and approved fire apparatus access roads. Access roads shall be placed a
distance apart equal to not less than one‐half of the length of the maximum overall diagonal dimension of
the property or area to be served, measured in a straight line between accesses.
P403 Fire Protection Water Required.
Fire protection water will be supplied in accordance with the applicable provisions of the County Fire Code.
P404 Fire Hydrant Location and Distribution.
Fire hydrant location and distribution shall be in accordance with the County Fire Code.
34

Page 45 of 100

Shenandoah City Council
AGENDA REPORT
AGENDA DATE:

October 28, 2026

ITEM NUMBER:

6

DEPARTMENT:

Public Works

PREPARED BY:

Rual Porras

PRICING:

$78,300.00

EXHIBITS:

Amendment No. 4

SUBJECT/PROCEEDING:
Tamina ARPA – Amendment No. 4 for Engineering Services with Bleyl Engineering.
RECOMMENDED ACTION:
Staff recommends approval of Amendment No. 4 in the amount of $78,300.00.
BACKGROUND/DISCUSSION:
Amendment No. 4 requests additional funding to provide the same level of service through the end of the project in the
following categories:
1.
2.
3.
4.

Community Coordination
Construction Administration
Civil Site Field Representation
Additional Project Coordination

APPROVALS:

DEPARTMENT HEAD

Rual Porras

DATE: October 15, 2026

CITY ADMINISTRATOR

Sam Masiel

DATE: October 16, 2026

Page 1
Revised 05/18

Page 46 of 100

October 14, 2026
Sam Masiel
City Administrator - Shenandoah
29955 I-45 North
Shenandoah, TX 77381
Reference:

Tamina Utilities ARPA
Amendment 4
Bleyl Project No. 13205

Dear Mr. Masiel,
We have prepared this amendment to the attached Professional Services Agreement dated April 13,
2023. Our original budget based on estimates is nearly depleted and we request these additional fund
to provide the same level of service through the end of the project. With your approval, we propose to
perform the following services with the propsd revised fee schedule below:
DESCRIPTION

PHASE

BASIS

1. Additional Services - Amendment No.
a. Additional Community Coordination:
From November 2026 to December 2026 (2 months)
b. Additional Construction Administration Services:
Services Include pay request, RFI, and change order processing,
periodic construction oversight and final inspection through
12/31/2026
c. Additional Civil Site Field Project Rep:
Continued onsite representation based on current level of effort
through 12/31/2026
d. Additional Project Coordination:
Continued project coordination based on current level of effort
through 12/31/2026

800
510

Cost + 10%

1 of 2

FEE
$

3,300.00

801

Hourly Estimate
(Attachment B)

28,000.00

802

Hourly Estimate
(Attachment B)

39,000.00

803

Hourly Estimate
(Attachment B)

8,000.00

Amendment 4 Total:

$

78,300.00

Page 47 of 100

10/14/2026
Sam Masiel
City Administrator - Shenandoah
29955 I-45 North
Shenandoah, TX 77381

CONTRACT SUMMARY
2. Original Contract Amount
Amendment 1
Amendment 1.5
Amendment 2
Amendment 3
Prop. Amendment 4

$ 1,867,872.00
$ 646,320.00
$
(4,088.00)
$ 108,414.00
$
$
78,300.00
Amended Total Fee:

$ 2,696,818.00

Should you have any questions or require additional information, please contact me at this office.
{{#Sig3=Sig_es_:signer3:signature:font(name=Arial,color=#000000,size=22)}}

Sincerely,
Engineer:
Title:
Date:
Prepared By:

Approved for: City of Shenandoah

{
{Chief Operating Officer

{Sig_es_:signer1:signature:font(name=Arial,color=#000000,size=22)

}}

{Ttl_es_:signer1:title:font(name=Arial,color=#000000,size=11)

}}

10/14/2026

{

{Sig_es_:signer2:signature:font(name=Arial,color=#000000,size=22)

2 of 2

}}

Client:
Title:
Date:

{
{

{$Sig3

}}

{$Ttl3

}}

Page 48 of 100

Shenandoah City Council
AGENDA REPORT
AGENDA DATE:

October 28, 2026

ITEM NUMBER:

7

DEPARTMENT:

Finance

PREPARED BY:

Lisa A. Wasner/Chris Grizzaffi

PRICING:

246,598.77

EXHIBITS:

Quotes

SUBJECT/PROCEEDING:
Discussion and Possible Action to Approve Additional Funding & Term Change to the City Hall Building Security &
Infrastructure Refresh Project
RECOMMENDED ACTION:
Staff Recommends Council Approve the Additional Funding & Contract Term Change as Presented in Option 1
BACKGROUND/DISCUSSION:
BACKGROUND:
Council approved the City Hall Building Security & Infrastructure Refresh Project for a total project cost of $240,000,
with a 5-year amortization payment term of $48,000 in the 2026-2027 fiscal budget.
PROPOSAL:
The Verkada software and hardware maintenance and service licenses were based on a 3-year term in the original
quote; staff renegotiated the contract to include 5 years of maintenance and service licenses, for a total project cost of
$246,598.77. Datavox noted a 12% increase in these licenses this year alone; the 5-year term will lock us at a much
lower rate than we would see in year 3 of the project, when we would need to extend the licenses.
To take advantage of these savings, we would need to extend the licenses from 3 to 5 years. The payment for the
entire project would be made as a single purchase in this fiscal year, and we would forgo the annual amortized
payments and their finance charges. This decision needs to be made prior to October 31 to avoid price increases.

Proposed Funding
Options
Plan Term
Year 1 Payment
Annual Payment
Total Contract Cost
•

Option 1
Cash Purchase
3-Year
5-Year
Plan
Plan

Option 2
Annual Lease
3-Year
5-Year
Plan
Plan

Option 3
Annual Lease
3-Year
5-Year
Plan
Plan

228,699
228,699

82,996
248,988

110,000
67,258
244,515

246,599
246,599

58,562
292,808

110,000
42,543
280,171

Option 1: 5-year plan and would only increase the overall project cost by $6,600 but would add the following
benefits:
o Add 2 years of additional licensing and lock-in rate at current cost (projected savings of approx.
$23,000)
o Eliminate finance charges, saving $46,209 compared to Option 2, and $33,572 compared to Option 3.
Page 1
Revised 05/18

Page 49 of 100

Page 2 of 2

BUDGET IMPACT:
This project is allocated across three (3) funds: the General Fund, the CVB Fund, and the Water & Sewer Fund.
Option 1 would yield the following contributions needed from each of the funds:

General Fund
CVB Fund
Water & Sewer Fund
Total

Total
Contribution
Needed
190,152
29,863
26,583

FY 26-27
Budget
Allocation
37,013
5,813
5,174

Difference
to be
Approved
153,139
24,050
21,409

246,598

48,000

198,598

APPROVALS:

DEPARTMENT HEAD

Lisa A. Wasner

DATE: October 20, 2026

CITY ADMINISTRATOR

Sam Masiel

DATE: October 21, 2026

Page 50 of 100

PHYSICAL SECURITY PROPOSAL
FOR

City Hall and Public Works Takeover - Verkada
5 Year - TIPS
City of Shenandoah
29955 Interstate 45 N
Shenandoah, TX 77381

DVXB-25073

Revision:

3

Last Modified: 10/20/2026
Valid Until: 10/31/2026

Printed On: 10/20/2026

DataVox TXDPS License B16503
Presented By:

Account Manager :
System Design:

Agustin Zentay
John Liput
TIPS Contract Number:
230105

Page 51 of 100

City Hall and Public Works Takeover - Verkada - TIPS

DVXB-25073 Rev 3

COMPANY OVERVIEW
Since 1990, DataVox has served the Greater Houston and Dallas-Fort Worth
areas by providing advanced business technology solutions. Over the years, we
have served customers in and around these markets and are uniquely
positioned to handle projects of all sizes and complexity.

7,000+
Customers Served
across Texas

300+
Full time employees

150+
Partners in industry leading
manufacturers

80.00
NPS

Net promoter score

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 2 of 21

10/20/2026

Page 52 of 100

City Hall and Public Works Takeover - Verkada - TIPS

DVXB-25073 Rev 3

EXECUTIVE
BRIEFING CENTER
DataVox’s Executive Briefing Center
6650 W Sam Houston Pkwy S
Houston, TX 77072

Audio Visual

Cloud Solutions

Smart Building
Technology

Business Phone
Systems

Cyber Security +
Solutions

Physical Security
Solutions + Services

Managed IT
Services

Building Technology
Infrastucture

Technology
Design Services

Network Cabling
Solutions

(713) 881-5300

Our Technology Briefing Center is available for use
throughout the entire design process. We invite
team members to visit our facilities and see how
valuable it can be for design sessions and
technology demonstrations.

E X P E R I E N C E S TAT E - O F THE-ART TECHNOLOGY
B R O U G H T TO L I F E

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 3 of 21

10/20/2026

Page 53 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

LOCATION SUMMARY
* Location Pricing Excludes all Optional and Alternate Components

Location

Price

Video Surveillance

$157,055.44

Access Control

$100,379.93

5 Year Pricing Discount - Valid Until October 31

($10,836.60)

Total Price (Excludes Sales Tax):

$246,598.77

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 4 of 21

10/20/2026

Page 54 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

SCOPE OF WORK
This Scope of Work outlines the services, deliverables, and responsibilities for the successful implementation of the proposed security solution.
DataVox will provide system design, programming, installation, and project management to ensure a fully integrated and compliant solution
that meets the customer’s operational and security requirements. All work will be performed in accordance with industry best practices and
the agreed-upon project specifications.

VIDEO SURVEILLANCE
DataVox proposal includes providing and installing (42) Verkada cameras for City Hall and Public Works buildings.
Camera Hardware:
·
(8) CM42 Indoor Mini Dome Cameras
o
Reuse Existing Cat 6 Cabling
·
(4) CD53 Indoor Dome Cameras
o
Reuse Existing Cat 6 Cabling
Relocate (1) Existing Cable to New Camera Location
o
o
OFE Switch Port with IEEE 802.3at (PoE+) Power, Minimum 30W Per Port
·
(4) CD53-E Outdoor Dome Cameras
o
Reuse Existing Cat 6 Cabling
o
OFE Switch Port with IEEE 802.3at (PoE+) Power, Minimum 30W Per Port
·
(8) CB52-E Outdoor Bullet Cameras
o
Reuse Existing Cat 6 Cabling
o
OFE Switch Port with IEEE 802.3at (PoE+) Power, Minimum 30W Per Port
·
(9) CF83-E Fisheye Dome Cameras
o
Reuse Existing Cat 6 Cabling
o
Relocate (2) Existing Cable to New Camera Location
Angle Mounts for (2) Locations
o
o
Switch Port with IEEE 802.3at (PoE+) Power, Minimum 30W Per Port
·
(3) CY53-E 2 Lens Multi-Sensor Cameras
o
Reuse Existing Cat 6 Cabling
o
Corner Mount Hardware
o
Switch Port with IEEE 802.3at (PoE+) Power, Minimum 30W Per Port
·
(6) CH53-E 4 Lens Multi-Sensor Cameras
o
Reuse Existing Cat 6 Cabling
o
Relocate (1) Existing Cable to New Camera Location
o
Corner Mount Hardware
o
OFE Switch Port with IEEE 802.3bt (PoE++), Minimum 60W Per Port
Camera Video Storage:
·
Onboard Storage for 30 Days of Continuous Recordings, 30 Days of Cloud Backup, and Unlimited Archiving
Camera Licenses:
·
(33) 5 Year Cloud Camera License
·
(3) 5 Year Cloud 2 Lens Multi-Sensor Camera License
·
(6) 5 Year Cloud 4 Lens Multi-Sensor Camera License
Programming for Add to Existing System: DataVox will access existing software management platform to enroll devices, optimize camera
settings for performance and security, and configure video compression for efficient storage and streaming. End user training is not included.
New Camera Installation: Final camera mounting locations will be field verified with the customer to maximize field of view and minimize
obstructions. This scope includes aiming, focusing, and one time refocus of cameras to refine customer desired field of views. All exterior
cameras will be mounted at a height of 12 to 14 feet from the ground. Weatherproofing measures will be applied to all exterior camera
installations to ensure reliable operation in outdoor environments.
Cloud or Hybrid Storage: For cloud or hybrid video storage, DataVox will configure the system to record video locally while enabling cloudbased backup, redundancy, or remote access. Customer is responsible for internet access, cloud subscriptions, and managing retention
policies and user access.

ACCESS CONTROL

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 5 of 21

10/20/2026

Page 55 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

ACCESS CONTROL
DataVox proposal includes providing and installing (Verkada) access control at (28) total locations.
Access Control Hardware:
·
(27) New AC12 Single Door Controllers to Replace Existing EVOs above Ceiling
o
(23) AD34 Card Reader for (22) Takeover Door Locations
§
Reuse Existing Door Contact, REX Sensor, Electrified Hardware, and Lock Power Supplies
§
Reuse Existing Cat 6 Cabling and 18AWG Cabling to Devices
§
Read In/Read Out for (1) Door Location
o
(5) AD64 Keypad Card Reader for (5) Takeover Door Locations
§
Reuse Existing Door Contact, REX Sensor, Electrified Hardware, and Lock Power Supplies
§
Reuse Existing Cat 6 Cabling and 18AWG Cabling to Devices
·
(1) New AC12 Single Door Controllers above Door
o
(1) AD34 Card Reader for (1) New Door Location
§
Includes New Door Contact, REX Sensor and Surface Mount Strike
§
Assumes New Cat 6 Cabling by Others Above Door at Nearest Accessible Ceiling
§
Includes New 18AWG Cabling to Devices from Controller Location
Access Control Licenses:
·
(28) 5 Year Cloud Door License
Programming for Add to Existing System: DataVox will access the existing access control management platform to enroll devices, configure
door controllers and readers, set access schedules, and apply security settings for reliable operation and compliance. End user training is not
included.
New Access Control Field Devices (For One Location): DataVox will furnish and install new access control field devices (e.g. readers, door
contacts) as defined in the Scope of Work. Mounting locations will be field-verified with the customer, subject to code compliance
requirements. All new devices will be tested and verified for proper operation upon completion.
Reuse of Existing Field Devices: DataVox will reconnect and configure existing access control field devices (e.g., card readers, door contacts,
REX devices) identified for reuse in the Scope of Work. It is assumed that all reused devices are in proper working condition, compatible with
the new system, and compliant with current code requirements.
DataVox Provided Electrified Hardware for Existing Building (For One Location): DataVox will provide and install electrified lock hardware
for proposed access control door locations. DataVox Solution Architects apply industry best practices on lock types for each door, however,
field verification and measurements during installation may require alternate lock type and result in a change order. Budgetary lock hardware
line items may be listed in this proposal for generic lock type until onsite verification is completed. Specialty or customized lock hardware may
require additional costs and non-returnable items.
Existing Electrified Door Hardware: Owner furnished existing electrified door hardware for existing access control door locations to be
reused for new access control system. DataVox assumes all hardware is installed and meets AHJ code requirements for permitting. Any
replacement or additional hardware needed will require change order.
Lock Power Supplies: DataVox will connect electrified lock hardware to power supplies. Power supplies may be integrated into ACP or
independent based on lock requirements such as fire relays, operating voltage, amperage, cable gauge, cable distance, and fail-safe vs failsecure. DataVox Solution Architects apply industry best practices on power supply calculations but actual power requirements are determined
during installation phase and may result in change order.
Badges/Credentials: If new badges are included in this scope of work, DataVox will provide Customer training on programming badges to
system, however customer is responsible for mass employee badge enrollment. If customer elects to utilize existing badges or badges
provided by others, customer will be required to import existing users from old database and enroll credentials to new system prior to system
cutover. Customer must provide test badges with facility code, badge numbers, and card format prior to installation. DataVox is not
responsible for badges being compatible with secondary systems such as shared building systems or time clock systems.
Badge Printer: If badge printer is included in this scope of work, DataVox will provide up to 1 hour of training for template options, adding
pictures, adding names, and basic set up instructions. The customer will be responsible for all customizations, creating proofs, designs, and
badge printing.

POE SWITCHES
POE Switches Provided by Customer: Customer will furnish and install all required Power over Ethernet (PoE) network switches to support IPbased security devices. Customer is responsible for ensuring sufficient PoE power budget, available ports, and proper network connectivity at
each device location. Network switch configuration including VLAN setup, port security, QoS, and POE settings are the responsibility of
Customer IT. All POE devices and cable pathways assumed to be within 300ft of a network IDF.

CABLING
New Category Cabling by Others: All new cabling (noted as OFE) shall be furnished and installed by others, including Cat 6 cable segments,
patch cables, wall penetrations, surface boxes, termination, labeling and testing prior to installation. All cabling for IP devices must be within
300ft of a network IDF/ switch.
This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 6 of 21

10/20/2026

Page 56 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

300ft of a network IDF/ switch.
Existing Category Cabling: Existing Category cabling (noted as OFE) intended to be reused is assumed to be functioning properly today with
proper installation and slack for connecting new devices. All cabling for IP devices must to be within 300ft of a network IDF/ switch.
DataVox Provided Power/Signal Cabling (For One Location): DataVox to provide and install low-voltage power/signal cabling for access
control-related devices (e.g. monitored door contacts, door release buttons) as defined in this scope of work.
Existing Power/Signal Cabling: Existing low-voltage power/signal cabling (noted as OFE) for access control/intrusion-related devices cabling
(e.g. monitored door contacts, door release buttons) intended to be reused is assumed to be functioning properly today with proper
installation and slack for connecting new devices.

LIFT RENTAL
Lift Rental: Scissor and/or boom lift rental and fuel costs are not included in the project. If lift is required, customer is responsible for
providing a lift accessible for the duration of the project. If the customer is unable to provide the required lift, DataVox will provide and bill
back costs to the Customer.

PURCHASING CONTRACTS
TIPS Process and PO Requirements: You must be a TIPS member to receive the benefits of using the TIPS purchasing contract. To register to
become a member go to https://www.tips-usa.com/texasentities.cfm. To prevent order delays, your PO must be payable to DataVox and
reference TIPS contract number 230105 and you must email your PO and the DataVox quote as a PDF file to [email protected]. Within
24 hours, TIPS will provide you with a link to download the order confirmation letter and DataVox PO contact will be sent an email to process
the order.
Non-TIPS Related Items: The following manufactures products are not included in the TIPS Contract pricing of this proposal: Miscellaneous
cabling and mounting hardware.

GENERAL
Project Management and Installation: DataVox will provide comprehensive project management services, including scheduling,
coordination with stakeholders, and oversight of all installation activities to ensure timely, code-compliant, and quality delivery.
Responsibilities include progress tracking, documentation, status reporting, and managing any required change orders. Installation will be
performed by qualified technicians following industry best practices, with all work assumed to occur during standard business hours.
Customer Engagement and IT Support: Customer will provide a dedicated point of contact (POC) to coordinate communications, approvals,
and scheduling throughout the project. This includes completing all required programming documentation for DataVox configuration. The
Customer’s IT team will support installation by supplying IP addresses (including subnet and default gateway), establishing a dedicated
security VLAN, providing VPN remote access, and managing firewall configurations to ensure seamless integration.
Owner Furnished or Provided by Others Equipment: DataVox assumes all owner furnished or existing equipment is fully functional and in
good working order prior to on-site services. DataVox assumes cabling provided by others includes wall penetrations, surface boxes,
termination, and testing are completed prior to installation. Cable gauge and distance must be suitable to deliver required power to device.
Access Control Permitting: Permit cost is not included in this SOW (reference permitting section for additional details)

Acknowledged and Accepted

\sowi1\
Initial

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 7 of 21

10/20/2026

Page 57 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

BILL OF MATERIALS

Note: * Price Includes Accessories
Note: Installed Price Includes Equipment and Labor

Video Surveillance

Installed Price

Video Surveillance Software Programming
1

DataVox
Security Programming Labor

$4,250.00

Equipment:

$0.00

Labor:

$4,250.00

Video Surveillance Software Programming:

$4,250.00

Video Surveillance Cameras
9

DataVox
Demolition of Existing IP Cameras

$1,290.96

1

DataVox
Miscellaneous Hardware For Mounting Components

$5,294.12

28

OFE
Owner Furnished Network Switch Port with IEEE 802.3at (PoE+) Power,
Minimum 30W Per Port, for Each Network Device. Includes the Switch’s Total
Poe Power Budget, Port Configuration And Active Network Connectivity at Each
Device Location. PoE Injectors are not included.

$0.00

6

OFE
Owner Furnished Network Switch Port with IEEE 802.3bt (PoE++), Minimum
60W Per Port (90W Where Manufacture Requires), for Each Network Device.
Includes the Switch’s Total PoE Power Budget, Port Configuration And Active
Network Connectivity at Each Device Location. PoE Injectors are not included.

$0.00

2

Verkada
30 Degree Angle Mount

$398.02

3

Verkada
Arm Mount

$596.49

9

Verkada
Corner Mount

$2,079.09

6

Verkada
Four-Camera Multisensor Pendant Cap Mount

$1,050.06

6

Verkada
Large Arm Mount

$1,480.98

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 8 of 21

10/20/2026

Page 58 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

3

Verkada
Dual-Dome Pendant Cap Mount

$596.49

8

Verkada
CB52-E Outdoor Bullet Camera, 5MP, Zoom Lens, 256GB of Storage, Maximum
30 Days of Retention

$15,596.08

4

Verkada
CD53-E Outdoor Dome Camera, 5MP, Zoom Lens, 256GB of Storage, Maximum
30 Days of Retention

$7,478.04

4

Verkada
CD53 Indoor Dome Camera, 5MP, Zoom Lens, 256GB of Storage, Maximum 30
Days of Retention

$5,881.80

9

Verkada
CF83-E Outdoor Fisheye Camera, 12.5MP/4K, Fixed Lens, 512GB of Storage,
Maximum 30 Days of Retention, IP67/IK10, 10 Year Warranty

$17,742.48

6

Verkada
CH53-E Outdoor Four-Camera Multisensor Camera, 1TB, 30 Days Max

$22,157.70

8

Verkada
CM42 Indoor Mini Dome Camera, 5MP, Fixed Lens, 256GB of Storage,
Maximum 30 Days of Retention

$7,283.60

3

Verkada
CY53-E Outdoor Dual-Dome Camera, 2 x 5MP, Zoom Lens, 512GB of Storage,
Maximum of 30 Days of Retention

$7,238.85

Equipment:

$77,661.32

Labor:

$18,503.44

Video Surveillance Cameras:

$96,164.76

Network Equipment
2

OFE
Owner Furnished Network Connectivity and Internet Services between Sites and
Buildings

$0.00

2

OFE
Owner Furnished Patch Panels, Rack Equipment, Mounting Hardware, and Cable
Tray

$0.00

2

OFE
Owner Furnished POE Network Switches for Security Devices in MDF/IDF
Locations

$0.00

Equipment:

$0.00

Labor:

$0.00

Network Equipment:

$0.00

Security Cabling

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 9 of 21

10/20/2026

Page 59 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

38

OFE
Owner Furnished/Existing Cat5e/6/6A Cabling for Door Controller Locations in
Nearest Accessible Ceiling to Access Control Door Location including Patch
Cords, Termination, Labeling, and Testing

$0.00

4

OFE
Relocate Existing Cat6 Cabling for Security Camera to New Locations. DataVox
Assumes there is Enough Service Loop for Relocation, or Change Order will be
Required.

$1,147.52

42

OFE
Owner Furnished Dedicated Low Voltage Conduit Cable Pathway from Security
Device Location to Nearest MDF/IDF. This includes Conduit, Coring, Boring,
Connectors, Pull String, Penetrations and Junction Boxes as Required. Conduit
Must be Installed Prior to DataVox Installation

$0.00

Equipment:

$0.00

Labor:

$1,147.52

Security Cabling:

$1,147.52

Verkada Licenses - 5 Year
33

Verkada
LIC-CAM-5Y-CAP, 5-Year Camera License, Capacity Increase

$29,013.60

3

Verkada
LIC-CAM-MLT2-5Y-CAP, 5-Year Two-Camera Multisensor License, Capacity
Increase

$4,797.60

6

Verkada
LIC-CAM-MLT4-5Y-CAP, 5-Year Four-Camera Multisensor License, Capacity
Increase

$15,595.20

Equipment:

$49,406.40

Labor:

$0.00

Verkada Licenses - 5 Year:

$49,406.40

DataVox Management Services
1

DataVox
Solution Architect Design and Engineering Services

$425.00

1

DataVox
Project Management Services - Planning, Scheduling, Order Processing,
Construction Meetings and Close Out
Design and Engineering Services - CAD/ Visio As-Built Drawings, Product Detail
Information, and Configuration Documentation
Commissioning Services - Testing, Tuning, and End User Training

$4,250.00

1

DataVox
Security Shipping and Handling Charges

$1,411.76

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 10 of 21

10/20/2026

Page 60 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

Equipment:

$1,411.76

Labor:

$4,675.00

DataVox Management Services:

$6,086.76

Access Control

Installed Price

Access Control Software Programming
1

DataVox
Security Programming Labor

$6,162.50

Equipment:

$0.00

Labor:

$6,162.50

Access Control Software Programming:

$6,162.50

Access Control Hardware
27

DataVox
Demolition of Existing Door Controller

$2,582.01

1

DataVox
Access Control Door Rough In

27

DataVox
Access Control Door Field Device Testing

$4,480.38

1

DataVox
Miscellaneous Hardware For Mounting Components

$3,294.12

1

OFE
Owner Furnished Conduit Rough In for Access Control Door Locations based on
Provided Door Typicals

$0.00

27

OFE
Owner Furnished Existing Power Supplies for Electrified Hardware

$0.00

28

OFE
Owner Furnished Network Switch Port with IEEE 802.3at (PoE+) Power,
Minimum 30W Per Port, for Each Network Device. Includes the Switch’s Total
Poe Power Budget, Port Configuration And Active Network Connectivity at Each
Device Location. PoE Injectors are not included.

$0.00

1

OFE
Read Out Door Locations by Code Can Not Restrict Egress. Readers are Only to
be used for Event Monitoring. Employees Responsible for Badging Prior to Exit
but Free Exit Available at All Times. If Delayed Egress or Badge Out Required for
Exit, Electrified or Mechanical Hardware will Require CO.

$0.00

$303.74

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 11 of 21

10/20/2026

Page 61 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

27

OFE
Owner Furnished and Installed Existing Access Control Door Hardware to be ReUsed such as Door Contacts, REX Motion Sensors, Push Buttons, Door Release
Buttons, and Panic Buttons

$0.00

1

OFE
Owner Furnished Compatible Access Badges/Key Fob User Credentials

$0.00

1

Securitron
DPS for Metal Doors - Black

$122.87

1

Securitron
XMS2 Exit Motion Sensor - The XMS2 passive infrared (PIR) motion sensor
request to exit (REX) device reliably detects motion near a door and releases its
lock.

$251.29

28

Verkada
AC12-HW, 1-Door Cloud Access Controller, PoE

$36,202.60

24

Verkada
AD34 Multi-format Card Reader with Bluetooth Unlock

$11,290.80

5

Verkada
AD64 Multi-format Keypad Card Reader

$3,830.40

Equipment:

$33,431.41

Labor:

$28,926.80

Access Control Hardware:

$62,358.21

Electrified Door Hardware
1

DataVox
Miscellaneous Cables, Connectors, and Hardware

$172.81

1

Hes
4500C Flush Mount Electric Strike for Cylindrical and Mortise Lockset,
12/24VDC, Stainless Steel

27

OFE
Existing Electrified Hardware including Mag Locks, Electrified Panic/Exit
Hardware, Electrified Strikes, Electrified Mortise/Cylindrical Locks, Automatic
Operators, Powered Hinges, Transfer Cables, Power Supplies, and Installed
Power Transfer Cables at Rim Enclosure above Door assumed to be Re-Used

$1,152.63

$0.00

Equipment:

$703.88

Labor:

$621.56

Electrified Door Hardware:

$1,325.44

Network Equipment

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 12 of 21

10/20/2026

Page 62 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

2

OFE
GC/Owner Furnished NC Fire Relay Connection for Electrified Hardware to Fire
System

$0.00

2

OFE
Owner Furnished Network Connectivity and Internet Services between Sites and
Buildings

$0.00

2

OFE
Owner Furnished Patch Panels, Rack Equipment, Mounting Hardware, and Cable
Tray

$0.00

2

OFE
Owner Furnished POE Network Switches for Security Devices in MDF/IDF
Locations

$0.00

Equipment:

$0.00

Labor:

$0.00

Network Equipment:

$0.00

28

OFE
Owner Furnished 18AWG Access Control Cabling from Door Controller or Lock
Power Supply to Access Control Devices such as Card Reader, REX, DPS, and
Electrified Hardware

$0.00

28

OFE
Owner Furnished/Existing Cat5e/6/6A Cabling for Door Controller Locations in
Nearest Accessible Ceiling to Access Control Door Location including Patch
Cords, Termination, Labeling, and Testing

$0.00

28

OFE
Owner Furnished Dedicated Low Voltage Conduit Cable Pathway from Security
Device Location to Nearest MDF/IDF. This includes Conduit, Coring, Boring,
Connectors, Pull String, Penetrations and Junction Boxes as Required. Conduit
Must be Installed Prior to DataVox Installation

$0.00

1000

Windy City Wire
18 AWG 6 Conductor Bare Copper, Non-Shielded Plenum Cable

Security Cabling

$1,265.00

Equipment:

$500.00

Labor:

$765.00

Security Cabling:

$1,265.00

Verkada Licenses - 5 Year
28

Verkada
LIC-AC-5Y-CAP, 5-Year Door License, Capacity Increase

$22,377.60

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 13 of 21

10/20/2026

Page 63 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

Equipment:

$22,377.60

Labor:

$0.00

Verkada Licenses - 5 Year:

$22,377.60

DataVox Management Services
1

DataVox
Solution Architect Design and Engineering Services

$850.00

1

DataVox
Project Management Services - Planning, Scheduling, Order Processing,
Construction Meetings and Close Out
Design and Engineering Services - CAD/ Visio As-Built Drawings, Product Detail
Information, and Configuration Documentation
Commissioning Services - Testing, Tuning, and End User Training

1

DataVox
Security Shipping and Handling Charges

$5,100.00

$941.18

Equipment:

$941.18

Labor:

$5,950.00

DataVox Management Services:

$6,891.18

5 Year Pricing Discount - Valid Until October 31

Installed Price

One-Time Discount for 5 Year Licenses
1

DataVox
Customer Discount for October 2026 5-Year License Purchase

($10,836.60)

Equipment:

($10,836.60)

Labor:

$0.00

One-Time Discount for 5 Year Licenses:

($10,836.60)

Project Equipment Subtotal:

$175,596.95

Project Labor Subtotal:

$71,001.82

Project Subtotal:

$246,598.77

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 14 of 21

10/20/2026

Page 64 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

ASSUMPTIONS AND CONDITIONS
This section lists DataVox’s standard assumptions and exclusions for this Physical Security proposal.

ACCESS CONTROL PERMITTING (IF APPLICABLE)
Texas Security License: DataVox is a Class B licensed (B16503) and certified private security company by the Texas Department of Public
Safety. DataVox is required to abide by Texas Administrative Code and Texas Occupations Code, Chapter 1702 for access control and alarm
related services.
Access Control Permitting: Access control will require a standalone access control permit (separate from Certificate of Occupancy permit).
Access control permitting and code requirements vary slightly between the AHJ of the project location. Once the project is approved by
Customer, DataVox will gather the required documentation and submit for lock permitting with the AHJ based on specific code requirements.
Timeline for permitting approval is subject to AHJ resources and typically takes 4-8 weeks. Once plans are submitted to the AHJ, any changes
will require re-submission and additional costs.
Access Control Inspection & Other Trades: The AHJ may require an onsite lock inspection for electronic access control devices prior to
system being allowed into service. During this phase, the Fire Marshall will review lock permit drawings, ensure correct lock installation, verify
locks integration into Fire Alarm System and review general traffic flow through exit routes. Upon passing inspection, Fire Marshal will provide
approval notice and authorize system activation. DataVox is not responsible for failed inspections due to other trades or general building
issues such as missing fire alarm equipment, incorrect door hardware based on occupancy loads, or similar issues. All inspections are assumed
to be performed during standard business hours or additional costs will apply.
Required Documents and Costs: Customer will be required to provide Certificate of Occupancy number (if applicable) and CAD (.dwg
format) lighting plans with locations of fire pull stations, STI stoppers, exit signs, and sprinklers prior to permit submission. If unable to provide
correct drawings, additional design fees will be billed back to Customer. Costs per AHJ may vary, therefore, access control permit cost is
not included in this scope of work and all fees and labor will be billed back to Customer at cost.

NETWORK
Conditioned IT Environment: Customer is responsible for providing a conditioned IT environment suitable for housing network and security
equipment. This includes equipment racks, cabinets, wire management, cable trays, patch panels, and dedicated power at all IDF/MDF
locations. For wall mounted security panels, Customer to provide wall space in IDF with fire-rated plywood backboard, 120VAC power,
normally closed fire relay, and network connectivity for security panel enclosures to Customer’s local area network.
Backbone and Riser Cabling: Unless specifically included in this Scope of Work, all backbone cabling (e.g. fiber optic, coaxial, or copper riser
cabling) required to connect network closets, IDFs, MDFs, or head-end equipment shall be furnished and installed by others. This includes all
necessary conduit, supports, and terminations.
Active Network Equipment: Unless otherwise specified in the Scope of Work, all active network components (e.g. UPS/battery backup,
workstations, monitors, KVMs, PC speakers/headsets) shall be furnished, installed, and maintained by the customer or their IT provider.
Surge Protection Requirements: Unless otherwise specified in the Scope of Work, customer is responsible for providing adequate surge
protection for all security system components, including access control panels, intrusion devices, cameras, and network equipment. Surge
protection must be installed at all power sources and network entry points to protect against electrical transients and ensure system reliability.
Active Directory / SSO Integration: If integration with Active Directory or Single Sign-On (SSO) is required, the customer must provide
access credentials, configuration details, and IT coordination. DataVox will support integration as defined in the Scope of Work. Additional
licenses may be required for AD/SSO integration.

PATHWAY AND SPECIALTY CABLING
Cable Color: DataVox uses standard YELLOW plenum security cabling for interior devices. If DataVox is providing security cabling and specific
cable color is required, Customer must provide requirements prior to equipment order. Custom colors will require additional costs.
Specialty and Vertical Pathway Cabling: Any specialty cabling required for vertical or mobile infrastructure (e.g. elevator traveling cables or
cabling through shafts and risers) shall be provided and installed by others. DataVox assumes all such pathways are in place and compliant
with applicable codes and building standards.
Hard Lid Ceilings and Pathway Access: DataVox assumes that all cable pathways are accessible and free of obstructions. Any work requiring
core drilling, conduit installation, lift equipment, or access through hard lid ceilings, fire-rated assemblies, or inaccessible spaces is excluded
unless specifically included in the Scope of Work. Coordination with building management and trades for access or pathway preparation is the
responsibility of the customer.

STANDARD OUT OF SCOPE ITEMS
Electrical and Conduit: Unless specifically included in this Scope of Work or subcontracted by DataVox, all related electrical infrastructure is
the responsibility of others. This includes, but is not limited to, providing 110/120 VAC power circuits, conduit runs, core drilling, boring, floor
boxes, back boxes, and door rough-in conduit. Additional requirements such as door cable enclosures, outdoor-rated enclosures, bollards,
This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 15 of 21

10/20/2026

Page 65 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

boxes, back boxes, and door rough-in conduit. Additional requirements such as door cable enclosures, outdoor-rated enclosures, bollards,
light poles, and gate hardware must also be furnished and installed by others. All electrical work must comply with local codes and be
completed prior to DataVox’s installation to ensure proper system integration.
Demolition or Relocation: Unless specifically stated in this scope of work, demolition, relocation, adjusting, or troubleshooting of existing
security hardware is not included.
Equipment Disposal: DataVox is not responsible for transportation, storage, packaging, or disposal of decommissioned equipment.
Integrations and 3rd Party Systems: DataVox is not responsible for configuring third party systems for custom integrations
Patch and Repair: Any required patching, painting, or repairs resulting from cable pathway access in hard deck ceilings, modifications or
replacements of ceiling tiles or T-bar grids, and sealing of penetrations or sheetrock restoration are the responsibility of others.
Miscellaneous & Unforeseen Items: Additional items may be required during project execution that were not anticipated by either party
(e.g., copper or fiber patch cables, power cords, optics). If miscellaneous items beyond those included in the bill of materials are required,
these items will be provided by the customer or may be procured through DataVox via the standard Change Order process.

WARRANTY AND RETURNS
Standard Warranty: DataVox includes a 90-day labor warranty from the date of project completion, covering the replacement or correction
of defective devices and installation-related issues. All hardware will follow the manufacturer’s warranty policy. Additional extended support
options and managed service options are available for additional cost.
Returns/Exchanges: Return or exchange requests must abide by manufacturer guidelines and must be submitted within required return
window (typically 30 days). Restocking fee of 25% on all returnable items will apply. Special order items and licenses are non-refundable.

PAYMENT AND BILLING POLICIES
Payment Terms : Customer is responsible for reviewing and adhering to payment terms listed in this proposal. If deposit is required, DataVox
will hold project scheduling and material orders under payment is received. If pricing changes occur due to deposit delays, change order will
be required.
Stored Materials: DataVox shall bill Customer for one hundred percent (100%) of all materials and equipment not incorporated into the work
but delivered and suitably stored on-or offsite, and if applicable, a reasonable storage fee. Payment for such materials and equipment shall be
made in accordance with the payment terms described herein. If requested, DataVox will provide:
·
Bill of Sale identifying the materials and equipment as the property of Customer
·
Evidence that all materials and equipment are insured for loss of any kind either at the stored location
·
Certificate of insurance; and
·
Photographic evidence of the stored materials and equipment.
Pricing Disclaimer: All pricing in this proposal is based on current distributor and manufacturer pricing as of the date of this proposal and is
subject to change without notice. DataVox sources equipment from third-party distributors and manufacturers whose pricing may fluctuate
due to supply chain conditions, tariffs, or distributor and/or manufacturer price adjustments. If the cost of any item in this proposal increases
before order fulfillment, DataVox reserves the right to adjust pricing accordingly or to notify Customer and provide an updated proposal. This
proposal does not constitute a binding price commitment until a purchase order is accepted by DataVox in writing at confirmed final pricing.

SITE CONDITIONS AND PROJECT STANDARDS
Regulatory Compliance & Standards: All work shall be performed in accordance with manufacturer specifications, applicable national and
local building codes, and all Authority Having Jurisdiction (AHJ) requirements. All DataVox field personnel will wear branded uniforms and
required Personal Protective Equipment (PPE) and will conduct themselves in a professional, courteous, and respectful manner on-site at all
times. DataVox will maintain a clean and organized work environment throughout the project, taking reasonable precautions to protect
customer-furnished equipment, surfaces, and finishes from damage or staining.
ADA Compliance: All equipment shall be installed in accordance with Americans with Disabilities Act (ADA) guidelines, ensuring appropriate
provisions for operator safety and accessibility.
Coordination Meetings: DataVox recommends weekly coordination meetings with the customer and all relevant trades to review project
status, upcoming milestones, and any foreseeable constraints that may affect the overall schedule. Any identified issues outside DataVox's
control with potential schedule impact will be communicated to the customer in a timely manner.
Safe Work Environment: Customer shall provide DataVox staff, subcontractors, and all other on-site personnel with a safe working
environment consistent with OSHA rules and regulations. DataVox reserves the right to refuse to perform work or install equipment in any
area where, at DataVox's sole discretion, the safety of those involved is of concern.
Site Access: All work is assumed to take place between the hours of 7:00 AM and 5:00 PM, Monday through Friday, excluding public holidays,
unless otherwise specified in this proposal. Work performed outside of standard business hours will be billed at published overtime (OT) labor
rates. Work areas shall be free and clear of obstructions during the installation period.
Secure On-Site Storage: Customer shall provide a secure, climate-controlled area on-site for storage of materials and equipment during the
installation period. Responsibility for equipment transfers to the customer immediately upon delivery to the on-site storage location or upon
installation. Any loss due to vandalism, theft, fire, water damage, or other causes outside DataVox's direct control shall be replaced at the
customer's expense.
Third-Party Vendor Coordination: Coordination with third-party vendors or other trades required for system integration (e.g., elevator
This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 16 of 21

10/20/2026

Page 66 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

vendors, licensed electricians, door hardware installers, fire alarm contractors) is the responsibility of the customer unless otherwise specified
in this Scope of Work.
Uninterrupted Workflow: Customer shall ensure continuous, uninterrupted access to all areas where physical security systems are being
installed. Delays caused by interference from other trades, inability to access the workspace during stated hours, lack of available power, or
other customer-controlled conditions will be charged at published Change Order labor rates. If a DataVox crew arrives on-site at the
scheduled time and work cannot proceed due to conditions within the customer's reasonable control, a minimum half-day charge for the crew
may apply.

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 17 of 21

10/20/2026

Page 67 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

PROJECT PRICING SUMMARY
Project Subtotal:

$246,598.77

Sales Tax (Excluded):

$0.00

Grand Total:

$246,598.77

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 18 of 21

10/20/2026

Page 68 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

PURCHASE OPTIONS
Cash Purchase Terms of Payment:
\cp1\
Billing Milestones

Amount Due

PO Required: Progress Payments (Multiple Invoices Upon Receipt of
Goods/Work Completed) - Net 30

$246,598.77

100.00 %

$246,598.77

Total Payments (Excluding Sales Tax):
Support Options (Select One):
Description ( For details see Terms & Conditions Support Agreement Obligations):
\sas1\

Annual Charge

Standard Support Agreement (90 days)

Included

(90 day warranty on workmanship, manufacture warranties still apply, all other labor billable after 90 days)

\sas2\

\sas3\

Acknowledged and Accepted

\poi1\
Initial

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 19 of 21

10/20/2026

Page 69 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

ACCEPTANCE OF PROPOSAL
When (but only when) signed by buyer and an authorized representative of DataVox this shall be a binding, legal contract.
The prices, specifications, and conditions in this proposal are satisfactory, and are hereby accepted in their entirety. Buyer hereby agrees to
purchase the Equipment and authorizes DataVox to do the work, and provide the materials specified, and payment will be made as outlined
above. The price quoted in this Physical Security Proposal is based upon the Equipment included in this Physical Security Proposal. Any
changes in the Equipment or installation may result in a change in the price. Any such change must be in writing, signed by all parties.
THIS AGREEMENT, WHEN SIGNED BY BOTH PARTIES (BELOW), SHALL BE GOVERNED BY THE TERMS AND CONDITIONS IN THIS PHYSICAL
SECURITY PROPOSAL. THERE ARE NO OTHER AGREEMENTS, OR WARRANTIES, ORAL OR WRITTEN, EXCEPT AS EXPRESSLY STATED IN THIS
PHYSICAL SECURITY PROPOSAL. THIS AGREEMENT CANNOT BE MODIFIED EXCEPT IN WRITING SIGNED BY BOTH PARTIES.
Buyer acknowledges having read and understood all of the terms and conditions printed in this Physical Security Proposal and acknowledges
receipt of a complete executed copy of this Agreement. Buyer understands and agrees that this Physical Security Proposal and all of the terms
and conditions hereof shall be a binding, enforceable contract when signed by Buyer and by an authorized representative of DataVox.

Approval Signatures
IN WITNESS WHEREOF, the duly authorized representatives of the parties hereto have caused this Proposal to be
duly executed.

DataVox, Inc.
By:

City of Shenandoah
By:

\s2\

\s1\

(Signature)

(Signature)

Name: \n2\

Name: \n1\

Title:

\t2\

Title:

\t1\

Date:

\d2\

Date:

\d1\

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 20 of 21

10/20/2026

Page 70 of 100

DVXB-25073 Rev 3

City of Shenandoah
City Hall and Public Works Takeover - Verkada - TIPS

TERMS AND CONDITIONS
In addition to the DataVox Standard Terms and Conditions found at https://www.datavox.net/terms-and-conditions/, the
applicable TIPS terms and conditions found at https://www.datavox.net/state-purchasing-cooperatives/tips/ apply to this
Agreement. In the event of any conflict between the terms of the DataVox Standard Terms and Conditions and the TIPS terms
and conditions, the TIPS terms and conditions shall prevail.

This document is confidential and the property of DataVox. Any copy or reuse of this document, its contents, recommendations and/or solutions
in whole or part is strictly prohibited without prior written consent of DataVox.

© 2026 DataVox, Inc. All rights reserved
Page 21 of 21

10/20/2026

Page 71 of 100

SEPTEMBER 2026
The Administration department handles multiple functions, including many that overlap with other
departments. The primary responsibilities that Administration handles are oversight of City
operations by the City Administrator, preparation for public meetings, records management,
information technology, election management, and general communications.

The City held two City Council meetings, one MDD meeting, and one Planning and Zoning
Commission meeting in September.

The city produced and emailed four newsletters via Constant Contact in
September. These newsletters recapped City Council meetings and included
information regarding upcoming events, city projects, and resources for
residents. Residents can sign up for all future Constant Contact emails by
scanning the QR code.

The City received and completed 21 record requests during the month of September as shown below.
Date Entered
9/1/2026
9/1/2026
9/2/2026
9/7/2026
9/7/2026
9/9/2026
9/10/2026
9/10/2026
9/13/2026
9/16/2026
9/16/2026
9/17/2026
9/18/2026
9/18/2026

Requestor
Patricia Montalvo
Christine B. Ostrowski
Carole Bartholomew
Brian Costley
Suma Sureshchandra
Kristen Hoffman
Jean Teague
Theresa Chen
Brandon Wunder
Mark Zurada Esq
Mark Zurada Esq.
Mark Zurada Esq.
Mark Zurada Esq.
Daniel Schidlowski

Description
Building Permit Report
Building Permit Report
Building Permit Report
Building Permit Report
Building Permit Report
Building Permit Report
Council Presentation Slides
Building Plans
Code Violation Report
Bid Tabulation Report
Bid Tabulation Report
Bid Tabulation Report
Bid Tabulation Report
Billboard Information

Status
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete

Page 72 of 100

SEPTEMBER 2026
9/21/2026
9/21/2026
9/22/2026
9/24/2026
9/24/2026
9/24/2026
9/26/2026

Raphael Martin Ortega
Gerald Lang
Joe Cox
Mark Zurada Esq.
Mark Zurada Esq.
Mark Zurada Esq.
Matt Bowyer

Residential Roofing Permit
Fire Plans
Development Agreement
Bid Tabulation Report
Bid Tabulation Report
Bid Tabulation Report
Wetland Credits

Complete
Complete
Complete
Complete
Complete
Complete
Complete

Page 73 of 100

Monthly Financial Report
City of Shenandoah - Period Ending September 30, 2026
FUND 100 : GENERAL FUND
Budget

CY Actual

Budget
% Remaining
Remaining

General Fund Revenues - Fiscal Year 2026 - YTD

Revenues
Property Tax

1,411,961

1,423,997

(12,036)

0.00%

Sales Tax

8,903,273

8,892,543

10,730

0.12%

Drink Tax

375,000

327,090

47,910

12.78%

Franchise Fees

430,000

92,344

337,656

78.52%

License & Permits

312,000

646,279

(334,279)

0.00%

Charges for Services

14,700

5,311

9,389

63.87%

Fines & Forfeitures

7,500

4,783

2,717

36.22%

Interest Income

60,000

482,872

(422,872)

0.00%

Other Revenues

274,894

653,433

(378,539)

0.00%

Transfers In

970,157

614,059

356,098

36.71%

Total Revenues

12,759,485

13,142,711

(383,226)

-3.00%

Other Revenues Transfers In
5%
5%

Interest Income
4%
Charges for
Services…

Property Tax
11%

Fines & Forfeitures
0%
License & Permits
5%
Franchise Fees
1%
Drink Tax
2%
Sales Tax
67%

Expenditures
Administration

973,086

965,698

7,388

0.76%

Finance

502,956

494,082

8,874

1.76%

Community Outreach

93,900

85,979

7,921

8.44%

Non-Department

364,599

266,161

98,438

27.00%

Fire Services

2,316,901

2,317,673

(772)

0.00%

Police

5,243,114

4,904,124

338,990

6.47%

5,115

2,579

2,536

49.59%

Public Works

1,276,390

1,269,161

7,229

0.57%

Municipal Pool

126,262

142,249

(15,987)

0.00%

Parks

167,754

155,293

12,461

7.43%

Community Development

706,051

741,517

(35,466)

0.00%

Technology

910,364

871,710

38,654

4.25%

12,686,492

12,216,225

470,267

3.71%

1,852,195

822,879

1,029,316

55.57%

Municipal Court

Total Operating Expenditures
Capital Outlay Transfers
Equipment Replacement Transfers
(Police/Public Works/Community Development)
Total Expenditures

419,863

484,454

(64,591)

-15.38%

14,958,550

13,523,558

1,434,992

90.41%

Net Change

(380,847)

Beginning Fund Balance

10,165,342

Ending Fund Balance

9,784,495

ENDING FUND BALANCE BREAKOUT

9,784,495

Committed Fund Balance - 180 Day Reserve
Restricted - Liabilities

General Fund Expenses - Fiscal Year 2026 - YTD
Community Technology
7%
Development
6%
Parks

Administration
8%
Finance Community
4%
Outreach
1%

1%
Municipal Pool
1%

Non-Department
2%

Public Works
11%

Fire Services
19%
Municipal Court
0%

Police
40%

2,629,833

Committed Fund Balance - 180
Day Reserve
Restricted - Liabilities

5,980,140
145,206

Assigned - Capital Contributions

1,029,316

Unassigned - 'Available Cash'

2,629,833

Assigned - Capital Contributions

1,029,316
145,206

5,980,140

Unassigned - 'Available Cash'

YEAR-END ADJUSTMENTS AND AUDIT ARE IN PROGRESS. THIS REPORTS SERVES AS AN UNAUDITED FINANCIAL STATEMENT.

Page 74 of 100

Monthly Financial Report
City of Shenandoah - Period Ending September 30, 2026
FUND 200 : CVB FUND (HOTEL/MOTEL)
Budget

Budget
% Remaining
Remaining

CY Actual

CVB Fund Revenues - Fiscal Year 2026 - YTD

Revenues
Hotel & Motel Occupancy Tax

Undesignated
0%

2,111,970

2,204,857

(92,887)

0.00%

15,000

235,940

(220,940)

0.00%

-

8,372

(8,372)

0.00%

2,126,970

2,449,169

(322,199)

-15.15%

Tourism

1,890,900

2,204,857

(313,957)

-16.60%

Total Operating Expenditures

1,890,900
(313,957)
-16.60% THIS REPORTS SERVES AS AN UNAUDITED FINANCIAL STATEMENT.
YEAR-END 2,204,857
ADJUSTMENTS AND
AUDIT ARE IN PROGRESS.

Interest
Undesignated
Total Revenues

Interest
10%

Expenditures

Capital Outlay Transfers
Total Expenditures
Net Change

299,735

324,036

(24,301)

-8.11%

2,190,635

2,528,894

(338,259)

-15.44%

Hotel & Motel
Occupancy Tax
90%

(79,724)

Beginning Fund Balance

6,683,653

Ending Fund Balance

6,603,929

(24,301)
Committed Fund Balance

ENDING FUND BALANCE BREAKOUT
Committed Fund Balance

6,603,929

Restricted - Liabilities

-

Assigned - Capital Contributions

Restricted - Liabilities

21,188

Assigned - Capital Contributions

Unassigned - 'Available Cash'

(24,301)

Unassigned - 'Available Cash'

6,607,042

6,607,042

YEAR-END ADJUSTMENTS AND AUDIT ARE IN PROGRESS. THIS REPORTS SERVES AS AN UNAUDITED FINANCIAL STATEMENT.

Page 75 of 100

Monthly Financial Report
City of Shenandoah - Period Ending September 30, 2026
FUND 600 : WATER & SEWER FUND
Budget

Water & Sewer Fund Revenues - Fiscal Year 2026 - YTD

Budget
% Remaining
Remaining

CY Actual

Revenues

Interest
2%

LSGCD
1%

Leases
0%

Water

2,074,100

2,382,384

(308,284)

0.00%

Sewer

1,613,973

1,874,782

(260,809)

0.00%

Penalty

15,000

20,286

(5,286)

0.00%

Tap Fees

2,000

32,169

(30,169)

0.00%

Temporary Water Meters

4,000

2,605

1,395

34.88%

Groundwater Reduction Plan Fees

207,135

216,037

(8,902)

0.00%

Lonestar Groundwater Conservation District

39,003

43,631

(4,628)

0.00%

Interest

35,000

74,330

(39,330)

0.00%

Leases

YEAR-END ADJUSTMENTS
AND AUDIT
25,000
22,917
2,083 ARE IN PROGRESS.
8.33% THIS REPORTS SERVES AS AN UNAUDITED FINANCIAL STATEMENT.

Undesignated

139,374

(139,374)

0.00%

4,015,211

4,808,515

(793,304)

-19.76%

Water & Sewer

3,309,306

2,864,963

444,343

13.43%

Utility Billing

153,773

164,601

(10,828)

-7.04%

Total Operating Expenditures

3,463,079

3,029,564

433,515

12.52%

Capital Outlay Transfers

2,437,970

1,607,345

830,625

34.07%

5,901,049

4,636,909

1,264,140

21.42%

Total Revenues

-

GRP Fees
4%

Undesignated
3%

Penalty
0%
Tap Fees

Water
50%

Temporary Water
Meters
0%

Sewer
39%

Expenditures

Total Expenditures
Net Change

171,606

Beginning Fund Balance

1,523,418

Ending Fund Balance

1,695,024

ENDING FUND BALANCE BREAKOUT

1,695,024

Committed Fund Balance

Committed Fund Balance

675,859

-

Restricted - Liabilities

188,539

Assigned - Capital Contributions

830,625

Unassigned - 'Available Cash'

675,859

Restricted - Liabilities

Assigned - Capital
Contributions

830,625

Unassigned - 'Available Cash'

YEAR-END ADJUSTMENTS AND AUDIT ARE IN PROGRESS. THIS REPORTS SERVES AS AN UNAUDITED FINANCIAL STATEMENT.

Page 76 of 100

Monthly Financial Report
City of Shenandoah - Period Ending September 30, 2026
OTHER FUNDS:
Fund 101:
Tree
Fund

Fund 102:
Park
Beautification
Fund

Fund 110:
Land
Trust

Fund 120:
Fund 130:
Equipment
Building
Replace Fund Permits Tech
Fund

Fund 140:
Trash
Fund

Fund 300:
Fund 400:
Fund 500:
Debt Service
Capital
Court
Fund
Project Fund
Fund

Fund 822: Fund 900: Fund 910:
Grants
LEOSE
Asset
Fund
Fund
Forfeiture
Fund

Revenues
Developer's Agreements

-

-

-

-

-

-

-

-

-

-

-

-

Rental Reservations

-

15,040

-

-

-

-

-

-

-

-

-

-

User Fees

-

-

-

-

3,935

99,507

-

-

149

-

-

-

Property Tax

-

-

-

-

-

-

-

-

-

-

-

State/Federal Funding

-

-

-

-

-

-

-

-

-

-

4,024

35,453

Contributions

-

-

-

451,393

-

-

-

-

-

-

-

-

Sale of Capital Assets

-

-

-

129,838

-

-

-

-

-

-

-

-

Transfers In

-

-

-

-

-

261,668

91,277

2,091,141

-

-

-

-

Total Revenues

-

15,040

-

581,231

3,935

361,175

1,980,044

2,091,141

149

-

4,024

35,453

Operating Services & Supplies

-

3,197

-

-

9,600

-

1,550

-

-

-

-

-

Operating Equipment

-

-

-

549,629

-

-

-

-

-

-

-

165,872

Contractual Services

-

-

-

-

-

324,833

-

-

-

-

-

Project

-

-

-

-

-

-

-

-

-

-

Bond Payments

-

-

-

-

-

-

1,904,225

-

-

-

Total Expenditures

-

3,197

-

549,629

9,600

324,833

1,905,775

2,760,200

-

-

-

165,872

Net Change

-

11,843

-

31,603

(5,665)

36,342

74,269

(669,060)

149

-

4,024

(130,419)

1,888,767

Expenditures

2,760,200
-

Beginning Fund Balance

2,029

33,260

3,494

1,261,565

65,529

2,144,864

2,790

11,316

430,466

Ending Fund Balance

2,029

45,103

3,494

1,293,167

59,864

36,342

74,269

1,475,804

2,939

-

15,340

300,047

ENDING FUND BALANCE BREAKOUT

2,029

45,103

36,342

74,269

1,475,804

2,939

-

15,340

300,047

3,494

1,293,167

59,864

Committed Fund Balance

-

-

3,494

1,293,167

59,864

-

74,269

-

2,939

-

-

-

Restricted

-

-

-

-

-

-

-

-

-

-

15,340

300,047

-

-

-

-

-

-

-

-

Assigned - Capital Contributions

-

-

-

-

-

-

-

Unassigned - 'Available Cash'

2,029

45,103

-

-

-

36,342

-

1,475,804
-

ENDING BANK BALANCES:

Stellar Bank

Texpool

Woodforest

Pooled Cash

22,516,758.57

General Fund

247,900.65

MDD

6,325,153.71

Hotel/Motel

262,346.01

Metro PID
Tamina ARPA
Tamina Utilities

113.10

Debt Service

2,988.81

922,448.27

Water/Sewer

41,693.00

25,416.23

MDD

29,789,889.88

Land Trust

3,493.75

1,395,057.61
1,949,986.08

3,493.75

YEAR-END ADJUSTMENTS AND AUDIT ARE IN PROGRESS. THIS REPORTS SERVES AS AN UNAUDITED FINANCIAL STATEMENT.

Page 77 of 100

Monthly Financial Statistics
City of Shenandoah - Period Ending September 30, 2026

GENERAL FUND REVENUE SNAPSHOT
SALES TAX
Month

Sales Tax Revenue
Fiscal Years 2022 - 2026
1,200,000
1,000,000
800,000

FY2022

FY2023

FY2024

FY2025

FY2026

Oct

562,987

610,665

644,594

667,794

705,475

Nov

584,390

679,645

684,785

680,886

707,762

Dec

714,852

797,727

791,772

881,495

898,805

Jan

542,288

576,764

568,452

612,569

705,779

Feb

508,194

590,468

582,617

609,088

1,036,072

Mar

680,058

741,876

750,155

787,947

861,106

600,000

Apr

638,356

646,007

655,379

703,909

773,161

400,000

May

632,842

697,124

670,172

696,713

833,879

Sales Tax Collections by
Industry Segment
Other
19%
Entertainment
5%
Retail
Trade
52%

Jun
701,063
714,297
756,174
786,840
850,236
YEAR-END ADJUSTMENTS AND AUDIT ARE IN PROGRESS. THIS REPORTS SERVES AS AN UNAUDITED FINANCIAL STATEMENT.
Jul
527,912
686,764
656,960
688,031
763,584

200,000
Oct

Nov

FY 2021-2022

Dec

Jan

FY 2022-2023

Feb

Mar

FY 2023-2024

Apr

May

Jun

FY 2024-2025

Jul

Aug

Sep

FY 2025-2026

Aug

619,934

626,973

664,073

663,251

756,683

Sep

682,609

699,784

798,955

743,265

-

Total

7,395,485

8,068,095

8,224,086

8,521,788

PROPERTY TAX

8,892,542

Lodging/
Food
Services
25%

DRINK TAX

Drink Tax Revenue
Fiscal Years 2022 - 2026

2025 Property Tax Levy
40,000

890,752.89 ,
27%

30,000
Residential
Commercial

Drink Tax Receipts by
Type

20,000
10,000
Oct

2,357,960.76 ,
73%

Dec

FY2022
Month

Outstanding Property Tax Receivables by
Tax Year
2005-2014

2015-2024

2025
-

Nov

5,000

10,000

15,000

20,000

25,000

30,000

FY2022

Jan

Feb

FY2023

Mar

Apr

May

FY2024

FY2023

Jun

Jul

FY2025

FY2024

Aug

Beer
25%

Sep

FY2026

FY2025

FY2026

Oct

26,811

29,156

28,014

28,981

26,582

Nov

30,025

28,445

26,926

27,842

26,420

Dec

26,843

27,918

26,508

28,964

27,110

Jan

31,824

34,715

33,038

33,473

31,363

Feb

27,181

28,761

27,420

26,571

26,296

Mar

29,011

23,814

28,347

27,546

29,467

Apr

30,203

30,627

30,946

28,190

29,778

May

28,909

28,348

27,342

26,017

29,033

Jun

30,177

29,187

33,601

33,038

35,211

Jul

31,728

29,351

31,680

28,452

31,428

Aug

30,460

29,902

28,676

27,083

34,399

Sep

28,867

28,776

32,625

28,051

-

Total

352,040

349,002

355,122

344,209

327,090

Wine
8%

Liquor
67%

YEAR-END ADJUSTMENTS AND AUDIT ARE IN PROGRESS. THIS REPORTS SERVES AS AN UNAUDITED FINANCIAL STATEMENT.

Page 78 of 100

COUNCIL QUARTERLY
INVESTMENT REPORT
QUARTER ENDING SEPTEMBER 30, 2026

SCHEDULE OF BEGINNING AND ENDING MARKET VALUE AND INTEREST EARNED

Portfolio
Pooled Cash Fund
Municipal Development District
MetroPark Square PID
Tamina ARPA Fund
Total Stellar Portfolio

Portfolio
General Fund
Hotel/Motel Fund
Debt Service Fund
Water & Sewer Fund
Municipal Development District
Total TexPool Portfolio
Total City Portfolio

Summary of Funds held at Stellar Bank
Quarter Beginning Quarter Ending Interest Income Interest Income
Market Value
Market Value
Earned Quarter
Earned YTD
$25,358,164.02
$22,516,758.57
$196,789.72
$772,833.75
$5,578,796.68
$6,325,153.71
$49,149.56
$166,488.66
$112.18
$113.10
$0.92
$1,786.75
$1,037,309.69
$922,448.27
$4,435.77
$19,915.33
$31,974,382.57 $29,764,473.65
$250,375.97
$961,024.49
Summary of Funds held at TexPool
Quarter Beginning Quarter Ending Interest Income Interest Income
Market Value
Market Value
Earned Quarter
Earned YTD
$245,605.39
$247,900.65
$2,295.26
$9,121.71
$259,917.84
$262,346.01
$2,428.17
$9,651.27
$2,320.13
$2,988.81
$668.68
$773.68
$41,306.50
$41,693.00
$386.50
$1,535.18
$1,382,147.65
$1,395,057.61
$12,909.96
$51,312.37
$1,931,297.51
$1,949,986.08
$18,688.57
$72,394.21
$33,905,680.08

$31,714,459.73

$269,064.54

$1,033,418.70

Page | 1
Investment Report

Page 79 of 100

This report is in compliance with the investment strategy as established in the City’s Investment Policy and the Public
Funds Investment Act, Chapter 2256, Texas Government Code.
Per the 2025 adopted Investment Policy:
AUTHORIZED INVESTMENTS
All investments on behalf of the City shall comply with the Investment Act for investment of public funds. It is the policy
of the City to limit its investments to:
1. Money market accounts in the City’s main depository bank;
2. U.S Treasury and Agency issues, including any investment insured by the FDIC or backed by the U.S
Government;
3. Certificates of deposits from Council-approved public depositories that are domiciled in the State of
Texas;
4. Local Government Investment pools as allowed by the Investment Act such as TexPool and TexPool
Prime.

Prepared on: October 13, 2026

Prepared By:
Lisa A. Wasner
Finance Director
Page | 2
Investment Report

Page 80 of 100

SEPTEMBER 2026

During the month, Public Works staff responded to requests for service submitted through the City’s
GoGov system.
The chart below shows the number of requests public works received and breaks down how many
were generated by citizens and city staff.

2026 GOGOV REQUESTS
50
45
40
35
30
25
20
15
10
5
0

31

20
11
12

1

23

12

16

14

15
14

9
2

22

3

12

4

9
5
2026 CITIZENS

8

9

10

6
6

7

8

9

10

11

12

2026 CITY STAFF

The city performs weekly street sweeping to reduce the amount of organic and inorganic debris
entering the city’s stormwater system and downstream waterbodies.
Ambassador Services performs weekly, bi-weekly, monthly, and quarterly cuts to irrigated and nonirrigated areas throughout the city. Their staff also checks these areas and picks up any litter found.
As a member of Texas811, the city receives numerous requests from contractors to locate and mark
our water and sewer lines before they dig. This helps protect the city’s water, sewer, and storm lines
from damage by contractors.
Each year, the city removes dead trees from public areas, prunes vegetation in the parks and ROW,
and plants additional trees to maintain our status as a Tree City. The city is currently in its 18 th year
as a Tree City.

Page 81 of 100

Water and sewer data are reported in monthly reports as calendar months, except for average
residential water use and water loss data, which are reported for the billing month because these
data points are based on use data, which is only available on a billing-month cycle.
The next chart shows the average residential water use for each month compared to previous
months.

GALLONS PUMPED (1,000)

AVERAGE RESIDENTIAL WATER USE
16,000
14,000
12,000
10,000
8,000
6,000
4,000
2,000
0
JANUARY

MARCH

MAY

JULY

SEPTEMBER

NOVEMBER

MONTH
2022

2023

2024

2025

2026

The next chart compares annual pumpage with previous years.
ANNUAL WATER PUMPAGE YEAR-TO-DATE TOTALS
GALLONS PUMPED (1000)

500,000
450,000
400,000

453612

481594

448369

446186

350,000
332015

300,000

368592

250,000
200,000
150,000
100,000
50,000

0
2022

2023

2024

2025

1/1/2025 - 9/30/2025

2026

Page 82 of 100

GALLONS PUMPED (1000)

The next chart compares monthly pumpage totals to previous years.

MONTHLY PUMPAGE TOTALS

70,000,000
65,000,000
60,000,000
55,000,000
50,000,000
45,000,000
40,000,000
35,000,000
30,000,000
25,000,000
20,000,000
15,000,000
10,000,000
5,000,000
0

January

March

May

July

September

November

2025

2026

SEPTEMBER

NOVEMBER

MONTH
2022

2023

2024

The next chart compares the loss rate to previous years.

GALLONS PUMPED

WATER LOSS YEAR TO DATE
20%
18%
16%
14%
12%
10%
8%
6%
4%
2%
0%
JANUARY
2022

MARCH

MAY
2023

MONTH
2024

JULY

2025

2026

Page 83 of 100

The city’s wastewater treatment plant flowed 50.5 million gallons this month for an average of
846,200 gallons per day. Throughout the year, the city has treated 225.3 million gallons of
wastewater.

1,200

16

14

1,000

12

800

10

600

8
6

400

4
200

2

0

0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
DAY OF MONTH
24 Hour Flow

Rain (inches)

The next chart compares the monthly flows at the wastewater treatment plant with those of
previous years.

GALLONS OF WATER TREATED (1000)

WATER TREATED COMPARISON MONTH TO MONTH
30,000
25,000
20,000
15,000
10,000

5,000
0

January

March

May

July

September

November

2024

2025

2026

MONTH
2022

2023

RAIN (INCHES)

GALLONS DAILY FLOW (1000)

WWTP DAILY FLOW SEPTEMBER 2026

Page 84 of 100

The next chart compares the monthly percent recovery to previous years.

% OF PUMPED WATER TREATED AT WWTP

% PUMPED WATER TREATED AT WWTP COMPARISON MONTH TO MONTH
100%
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%

January

March

2022

May

2023

MONTH

July

September

2024

2025

November

2026

The next chart compares rainfall from previous years with the current year.
YEARLY RAIN TOTALS

RAIN AMOUNT (INCHES)

80.00

75.28

70.00
60.00
50.00

49.72

46.59

40.00

42.77

41.95

35.29

30.00
20.00

10.00
0.00
2022

2023

2024

2025

1/1/2025 - 9/30/2025

1/1/2026 - 9/30/2026

Our water system has been reviewed by TCEQ and rated as a Superior water system.
SUBMITTED BY: Rual Porras

Page 85 of 100

toni

City of Shenandoah Engineer’s Report
SEPTEMBER 2026
*Items in bold are updates

Projects Under Construction
I-45 Intersection Improvements -12402/ 12403
Project Description

Update

Bleyl was authorized on 1/23/19 to prepare a
detailed design and submittal to TXDOT of a plan to
modify the Research Forest and Tamina Road
intersection. (Adding one lane each direction).

•
•
•

The design includes a SB acceleration lane from
Research Drive along I-45 feeder. Phase 2
The revised design includes an extended east bound
left turn lane starting at the Savannah intersection.
City:
King Fuel R.O.W. Acquisition -Complete
Home Depot R.O.W. Aquisition - Complete
Entergy power line relocation- Complete
Center Point gas line reloction - Complete

Conroe

Bryan

•
•
•
•
•
•
•
•

Commissioner Wheeler is the sponsor with
TXDOT for the project.
Commissioners Court approved the project for
TXDOT funding on 9/12/23.
Advanced Funding Agreement approved by
TXDOT ($5,000,000.00). August 2024
TXDOT will bid and manage the construction.
TXDOT Plan Approval- May 2025
TXDOT Construction – Unknown
Design of the fiber cabinet is complete.
Design Concept Conference @ TXDOT-6/12/26
Teams meeting with TXDOT-7/10/26
Update meeting with Pct. 3
8/17/26 @ 10:00 a.m.
TxDOT Meeting – 9/24/26

bleylengineering.com

Austin

Ad va nc i ng s t ro ng e r, s a f e r c om mu ni t i es ac r o ss Te x as si nc e 199 7 .
Texas Reg. No. F-678

Houston

Page 86 of 100

David Memorial Extension Phase II and III – 12473/33587
Project Description

Update

Design - Complete
Wetlands Permits – Complete
Construction – Phase II - Complete
Phase III – Pending

•
•
•

Funding Update:
Entity
Shenandoah
(MDD)
Montgomery
County
Conroe

Costs
$2,000,000

Funded
$2,000,000

$5,400,000

$7,500,000

$0

$ 501,000 *
$10,501,000
(Revised)

•
•
•
•
•
•
•
•

*Woodlands Township Funds delivered from Conroe to
Montgomery County.

•

County Bond Issue May 3, 2025 - Approved
Interlocal Agreement (Montgomery County
and Conroe)- Approved April 23,2026
Interlocal Agreement with Methodist and
Montgomery County (Draft Complete).
Traffic Impact Analysis for SH 242 intersection
(pending TXDOT approval)
Methodist Meeting 6/2/26 to review plans.
R.O.W. acquisition is critical path.
Construction Unknown
Methodist Meeting – 7/14/26
Methodist Meeting – 7/28/26
Methodist Meeting – 8/19/26
Plans approved by Conroe and Montgomery
County.
Commissioners Court Agenda – 9/17/26

Projects Under Design
David Memorial Drainage Improvements for PID
Bleyl Project No. 13057
Project Description

Update

This project is 95% complete (design).
A. Storm sewer along Metropark to regional detention.
B. Driveway Connections to David Memorial (2).

•
•
•
•
•

Hydrology & Hydraulics models Complete
Construction Plans
August 2026
City/County approvals
September 2026
Bidding
October 2026
Construction Time
240 days

Kimley-Horne Engineering – transferred to Bleyl
Engineering to complete the plans.
Funded by the P.I.D.

Conroe

Bryan

bleylengineering.com

Austin

Ad va nc i ng s t ro ng e r, s a f e r c om mu ni t i es ac r o ss Te x as si nc e 199 7 .
2 of 5

Houston

Page 87 of 100

North Pond Improvements for PID- (Moon PID if annexed)
Bleyl Project No. 13104
Project Description

Update
•
•
•
•

Design offsite detention to reclaim a portion of Lot 9
– Metropark

Hydrology and Hydraulic Models
Detention Pond Design
Bidding
Construction

Moon has approved the project.

Shenandoah East Park Drainage - 13439
(North Tamina/CISD Regional Drainage)
Project Description

Update

Convey storm water from Tamina Road/CISD property
to future Shenandoah East Park.
Amend Existing COE Wetlands Permit.
Design conveyance and detention system.
Reclaim acreage for commercial use.
Create City park space/water feature

•
•
•
•
•
•

Preliminary Cost Estimate - $7,000,000
Wetlands permit amendment – October 2026
Meeting with Corps of Engineers – October 2026
Latest CISD Meeting 10/2/25
Wetlands Alternatives Analysis – Complete
Draft Wetlands Permit Application –2026

Tamina Road Widening (Pending)
Project Description
Meeting with Commissioner Gray – 7/26/23
Update Meeting with Gray – January 2024
4 Lanes of Concrete Paving to Johnson Road
Storm Sewer Drainage (no open ditch)
Sidewalk on one side.
Meeting with Commissioner Gray – 12/3/24 &
4/22/26

Conroe

Bryan

Update
•
•
•
•
•

Interlocal Agreement with Montgomery County
for funding (Pending)
Surveying & Engineering (pending)
Estimated Construction Costs -$3,000,000
Construction (Pending)
Detention Pond Expansion (Pending)

bleylengineering.com

Austin

Ad va nc i ng s t ro ng e r, s a f e r c om mu ni t i es ac r o ss Te x as si nc e 199 7 .
3 of 5

Houston

Page 88 of 100

2025-2026 Capital Improvement Projects
Vision Park 16-Inch Waterline Replacement -13701
Project Description

Update
•

Re-route existing water main line

•
•
•
•
•
•

Surveying and Engineering approved by the
City. (Moon Surveying)
Surveying complete
New route option accepted.
Avanti easement pending.
Final Design 90% complete.
Pre-bid – 9/17/26
Bid Opening – 10/1/26

Shenandoah Park Drive Replacement – 13702
Project Description

Update
•

Replace asphalt with concrete.
Drainage Improvement.

•
•
•
•

*Additional drainage improvements being
studied.
*TXDOT Detention Improvement

Surveying and Engineering approved by the
City. (Moon Surveying)
Surveying complete.
Design Complete
Review Meeting – 7/19/26
Bidding - September 2026

2026 Wastewater Treatment Plant Master Plan Update – Pending approval
Project Description

Update

Update 2020 Master Plan for future expansion.

Conroe

Bryan

•

Proposal complete. Pending council approval .

bleylengineering.com

Austin

Ad va nc i ng s t ro ng e r, s a f e r c om mu ni t i es ac r o ss Te x as si nc e 199 7 .
4 of 5

Houston

Page 89 of 100

Project Budgeting – Pending Approval
Project Description

Update

Oak Haven Detention Expansion

•

PER – Cost Estimate Hold DD 6
Meeting Pending

MUD 95 Stormwater Conveyance

•
•

MOU From City to MUD – 7/13/26
Special Board Meeting – Pending

•

H & H Model Status – UpdateRevisions by MUD 95

Sanitary Lift Station Upgrades Proposal
(Metro Park)
Water Plant No. 3 Expansion Proposal
(Vision Park)

•

Submitted

•

Pending

I-45 Redundant Sewer Line - 13075
Project Description

Update
•
•
•

Conroe

Bryan

Bidding and Construction – 2026-27
Design 90%- Complete
Survey update - Pending

bleylengineering.com

Austin

Ad va nc i ng s t ro ng e r, s a f e r c om mu ni t i es ac r o ss Te x as si nc e 199 7 .
5 of 5

Houston

Page 90 of 100

SEPTEMBER 2026

Shenandoah PD’s largest function and operation is patrol in terms of staffing, time utilization, and
response. The patrol division spends a great deal of time responding to calls for service and making
proactive contacts and arrests. The tables below provide indicators of patrol activity for the month
of August.

CALLS FOR SERVICE & OFFICER-INITIATED CONTACTS
CALL NATURE

August

Alarm

53

Assault

2

Assault Family Violence

2

Theft -Auto

4

Burglary of a Vehicle

5

Burglary of a Building

0

Burglary of a Habitation

0

Criminal Mischief

0

Death Investigation

1

Disturbance

12

DWI Arrests

0

Fraud

9

Motor Vehicle Accident – No Injury

61

Motor Vehicle Accident with Injury

2

Missing Person

1

Page 91 of 100

Narcotics Arrests

2

Public Intoxication

0

Recovered Stolen Vehicle

1

Robbery

0

Shots Fired

0

Suspicious Person

31

Suspicious Vehicle

28

Theft (Felony - $2,500+ Value)

7

Theft (Misdemeanor – under $2,500 Value)

8

Traffic Hazard

27

Welfare Concern

65

PROACTIVE CONTACTS/ARRESTS
Arrest Felony

6

Arrest Misdemeanor

7

Total Arrests

13

PROBLEM-SOLVING EFFORTS
Commercial and crime prevention focus

Page 92 of 100

SEPTEMBER
2026

AUGUST
2026

JULY
2026

Commercial Areas

382

348

293

Residential Areas

83

96

91

Interstate 45 / Service Roads

115

171

148

Totals

580

615

532

TRAFFIC ENFORCEMENT AREA

There were 49 reports of criminal activity in September 2026, with complaints requiring a criminal
offense or incident report.
There are currently 32 open cases assigned to the criminal investigations section. 21 cases have
been submitted to the D.A.’s office for review, and 14 active arrest warrant is pending service.

Submitted by

Page 93 of 100

September 2026
The information presented in this report provides a comprehensive breakdown of Community
Development Department activities and performance metrics from 2023 through the current
reporting year, highlighting trends, accomplishments, and ongoing efforts to serve the City of
Shenandoah.

Our Permit Administration Division reviews and issues development permits, conducts inspections
of new construction and renovation projects, and verifies compliance with adopted building, safety,
and development standards.
During the month the City issued 31 residential and commercial project permits along with no
additional plumbing permits for the Tamina Community and completed 169 inspections. Year-todate inspection activity is 5% lower than the same period in 2025. The accompanying charts provide
a summary of permitting and inspection activity and illustrate trends in development and
construction activity throughout the city.

NUMBER OF PERMITS ISSUED

RESIDENTIAL AND COMMERICAL PERMIT HISTORY
140
120
100
80
60
40
20
0

2026 Total

2023 Total

2024 Total

2025 Total

INSPECTIONS PREFORMED

FOUR YEAR INSPECTION HISTORY
900
800
700
600
500
400
300
200
100
0

2026 Total

2023 Total

2024 Total

2025 Total

Page 94 of 100

MONTHLY AMOUNT
COLLECTED

The city collected $280.00 in digital plan review fees during the month. The digital plan review fee
fund maintains a current balance of $41,353.51 and is dedicated to supporting the monthly
operational costs of the City's online permitting, planning, and zoning application software platform.

DIGITAL PLAN REVIEW FEE
$2,000.00
$1,500.00
$1,000.00
$500.00
$0.00

2026 Total

2023 Total

2024 Total

2025 Total

Digital Plan Review History
FY 2022-2023

FY 2023-2024

FY 2024-2025

FY 2025-2065

Total Revenue

$7,915.00

$3,975.00

$4,815.00

$3,655.00

Total Expenses

$0.00

$2,739.99

$9,600.00

$9,600.00

Total

$7,915.00

$1,235.01

-$4,785.00

-$5,945.00

Balance

$41,353.51

The city collected $31,418.00 in building permit fees. Year-to-date permit fee revenue is 52% lower
than the same period in 2025. Included in this total are fire plan review and inspection fees that are
collected and remitted to the Montgomery County Fire Marshal's Office pursuant to the City's
interlocal agreement.

BUILDING PERMIT FEES
PERMIT FEES

$400,000.00
$300,000.00
$200,000.00
$100,000.00
$0.00

2026 Total

2023 Total

2024 Total

2025 Total

Page 95 of 100

The table below provides a summary of new commercial development projects and the
corresponding permit issuance dates. A second table highlights commercial remodels and tenant
build-outs, along with the date each permit was issued.

New Commercial Projects
Address

Description

Date permit issued

201 David Vetter Blvd.

Woodlofts Parking Garage

June 16, 2025

201 David Vetter Blvd.

Woodlofts Multifamily

June 16, 2025

19377 David Memorial Drive

Commercial Building

January 7, 2026

8933 Tamina Road

Commercial Building

February 18, 2025

18450 Residence Drive

Metropark Multifamily

April 23, 2026

18450 Residence Drive

Metropark Parking Garage

April 23, 2026

Commercial Remodel/Buildout Projects
Address

Description

Date permit issued

1699 Research Forest Drive, Suite 150

Houston Eye Associates

August 12, 2025

8850 Six Pines Drive, Suite 140

Well Infused The Woodlands

September 5, 2025

8980 Metropark Drive, Suite 200

Kids Dentistry of The Woodlands

March 4, 2026

9250 Pinecroft Drive

Memorial Hermann

March 6, 2026

9303 Pinecroft Drive, Suite 100

The Woodlands Dermatology Associates

March 23, 2026

19671 IH 45 S

Mavis Tire LLC

May 15, 2026

8821 Metropark Drive, Suite 1200

Zio Al's Pizza and Pasta

June 10 2026

19075 N IH 45, Suite 105

PGA Superstore

July 7, 2026

29801 IH 45 S

Demo Commercial Building

July 27, 2026

8845 Six Pines Drive, Suite 130

Lucent Smiles Dentistry

August 13, 0206

101 Vision Park Blvd.

Woodlands Cosmetic & Hand Surgical

August 21, 2026

129 Vision Park Blvd., Suite 306

Healing Heart Clinic

August 31, 2026

285 Ed English Drive, Suite 300

Shelby Bay, LLC

September 28, 2026

19053 IH 45, Suite H

Super Yummy

September 30, 2026

19221 IH 45, Suite 300

Vacant Space

September 30, 2026

9200 Pinecroft Drive

1st Floor CT Room

September 30, 2026

9200 Pinecroft Drive

1st Floor CT Room

September 30, 2026

Page 96 of 100

Planning and Development staff provide guidance throughout the development process and assist
applicants in navigating City requirements and procedures. A breakdown of approved development
applications is provided below.

DEVELOPMENT
APPLICATIONS
ADDRESS/PARCEL
IDENTIFICATION
PROJECT/APPLICANT

APPROVAL/ISSUED
DATE

Variance to allow encroachment of a
residential structure into a side setback line

28818 Holly Hill Drive

December 10, 2025

Variance to the minimum vegetation buffer
along the east and west property line

Thind Hotel Properties

Special Use Permit for Mixed Beverage
Permit without Late Hours

1400 Research Forest Drive,
Suite 180

Sin Yolanda

March 11, 2026

Special Use Permit for Wine and Malt
Beverage Permit

29813 IH 45 N

Homewood Suites

March 25, 2026

Variance to allow encroachment of a pool
and equipment into building setback line.

148 McKinley Landing Lane

Cox residence

March 26, 2025

Special Use Permit for Mixed Beverage
Permit without Late Hours

1500 Research Forest Drive,
Suite 100

Tasty Eatery and Catering

Void

Special Use Permit for a Medical Services:
Restricted

29801 IH 45

Blue Fish Pediatric

May 27, 2026

Special Use Permit for Mixed Beverage
Permit without Late Hours

1500 Research Forest Drive,
Suite 100

Tasty Eatery and Catering

July 22, 2026

Special Use Permit for Tourist
Accomodations: Restricted

9030 Tamina Road

Staybridge Suite and Atwell

Minor Replat

Daylight District

KS Thind Property
Management and SS Thind
Hotels, LLC

Variance to the side building setback line

251 Green Blvd.

Chase residence

September 23, 2026

Sign Exception

1476 Wellman Road

Quest Collegiate Academy

September 15, 2026

APPLICATION

Matocha residence

February25, 2026

Page 97 of 100

Code Enforcement works to protect the health, safety, and quality of life of Shenandoah residents
through education, communication, and enforcement efforts. The information below includes both
public service requests and cases initiated by the Code Enforcement Officer, organized by violation
type.

Code Enforcement Request
Animal Control Concerns
Animal Traps
Fences
Graffiti
Junk Cars
Other Code Enforcement Requests
Overgrown Grass & Weeds
Sign Violation
Total - Code Enforcement Request
Code Enforcement Cases
Code Violations/Nuisance
License and Permits
Overgrown Grass & Weeds
Sign Ordinance
Vehicle Ordinance
Total - Code Enforcement Cases (opened)
Total Code Enforcement Cases Closed
Enforcement Action
Property Liens Recorded
Yards force Mowed

0
0
0
0
0
3
0
0
3
23
0
2
2
14
41
27
0
0

Page 98 of 100

The Court is also responsible for managing outstanding Code Enforcement cases, including hearings,
case processing, and related legal proceedings. The monthly breakdown of outstanding cases and
associated values is provided below.
Value of outstanding cases decreased by $605.00
•

Cases Paid in Full – 2 ($605.00)

Status of Outstanding Cases

OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEPT

Cases 2007 to
Present

Dollar Value

1,753
1,753
1,753
1,753
1,752
1,752
1,751
1,749
1,746
1,741
1,741
1,741

484,651.86
484,651.86
484,651.86
484,651.86
484,462.86
484,462.86
484,214.86
483,526.86
481,552.56
481,552.56
481,552.56
481,552.56

Submitted by Jackie Thompson

Cases
Prior to
2007
3,624
3,624
3,624
3,624
3,624
3,621
3,615
3,613
3,606
3,600
3,600
3,598

Dollar Value

Total Cases

907,446.88
907,446.88
907,446.88
907,446.88
907,446.88
906,488.88
904,655.88
904,167.88
903,326.88
902,804.88
902,804.88
902,199.88

5,377
5,377
5,377
5,377
5,376
5,373
5,366
5,362
5,352
5,341
5,341
5,339

Case
Total Dollar
Total Dollar
Count
Value
Value Change
Change
4 $ 1,392,098.74
1,166.00
0 $ 1,392,098.74
0.00
0 $ 1,392,098.74
0.00
0 $ 1,392,098.74
0.00
1 $ 1,391,909.74
189.00
3 $ 1,390,951.74
958.00
7 $ 1,388,870.74
2,081.00
4 $ 1,387,694.74
1,176.00
10 $ 1,384,879.44
2,815.30
11 $ 1,384,357.44
522.00
0 $ 1,384,357.44
0.00
2 $ 1,383,752.44
605.00

Page 99 of 100

FY 2021-22
Annual Report

CVB September 2026 Monthly Report
Highlighting August Hotel Performance &
HOT Collections

Page 100 of 100

Other Items of Note:
- This month’s report shows the tenth consecutive month that we’ve seen an increase in our HOT collections – up 13.3%
YOY (for the same month in the previous year, or Aug. ‘26 vs. Aug. ’25), and are up 3.3% YOY for our entire FY with one month
of reporting remaining prior to the end of our FY. Additionally, as you can see from our Tourism Economics Momentum Index
chart on the previous page, we continue to outperform our peers across categories.
As we receive this monthly report, we will begin pulling together this past year’s data, do our analysis, and work on producing
our annual report.

- Another item of note is that initial indications show that all our efforts and work on our new website build, marketing and social
media campaigns continue to see strong results. As you can see in Slides 5 and 6 of this report, and in the Executive
Summary, our website sessions are up significantly (70.2% YOY for Aug.) alongside an increased engagement rate, and our
time on site (session duration), more than doubled YOY.
Additionally, our marketing campaigns appear to be working very well.
- In August, Billy and I both attended conferences: Billy attended our annual Texas Travel Alliance (TTA) Travel Summit
Conference in Fort Worth, and we had a 4th Tourism Advisory Board meeting on October 8th, and an Around Houston meeting
on October 15th. John also participated in a DI Marketing Committee meeting in October 8th as well.
- John and Billy have also been hard at work, working with Lisa and her team, to close out FY 2025-26, and have numerous
vendor calls to finalize new contracts and insertion orders, and get them input into our accounting system for FY 2026-27.

Provenance

Where this record came from. Every source is listed, permanently.

  • Agenda Watch · Oct 23, 2026
  • DeFlock research desk · Oct 23, 2026

Permanent ID DKT-2026-002321 — this record is never deleted.

Record history

Every change to this record, logged as it happened.

  • Oct 23, 2026 Filed on the Docket
  • Oct 23, 2026 Full document archived — public record
  • Oct 23, 2026 Corroborated by another source DeFlock research desk
  • Oct 23, 2026 Record updated

← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.