Meeting minutes published with the October 12, 2026 meeting documents record: "Flock camera". These terms appear in the minutes, not as items on that agenda. Those minutes are dated September 28, 2026. The document stays here as a permanent public record.

WhenMonday, October 12, 2026
Check the agenda document for the meeting time.
WhereFarmington Hills, Michigan
BodyMinutes
On the record“Flock camera”

The agenda, word for word

Government public record — the full text of the published document, archived October 28, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗

20 pages · scroll to read
Page 1 of 20

APPROVED 10/26/2026
MINUTES
CITY OF FARMINGTON HILLS
CITY COUNCIL MEETING
CITY HALL – COUNCIL CHAMBER
OCTOBER 12, 2026 – 7:30 PM
The regular session of the Farmington Hills City Council was called to order by Mayor Rich at 7:30PM.
Councilmembers Present:

Aldred, Boleware, Bridges, Dwyer, Knol, Rich and Starkman

Councilmembers Absent:

None

Others Present:

Acting City Manager Mondora, City Clerk Lindahl, Directors Aranowski,
Davis, Kettler-Schmult, Rushlow and Skrobola and City Attorney Joppich

PLEDGE OF ALLEGIANCE
The pledge of allegiance was led by Farmington Hills resident Rachel Potter.
APPROVAL OF REGULAR SESSION MEETING AGENDA
MOTION by Knol, support by Bridges, that the City Council of Farmington Hills hereby approves
the regular session agenda as published.
MOTION CARRIED 7-0.
ANNOUNCEMENTS/PRESENTATIONS FROM CITY BOARDS, COMMISSIONS AND PUBLIC OFFICIALS
UPDATE FROM DTE ENERGY REPRESENTATIVES
DTE Energy Director of Policy and Regional Affairs Daniel Mahoney provided an update on delivering
reliable energy for the City. DTE had previously presented to Council during a study session.
Mr. Mahoney said that 2026 had been a challenging year for DTE and DTE customers, with five declared
storms including tornadoes, and some of the most significant weather damage that DTE has ever seen,
challenging the infrastructure, DTE processes, and restoration teams. Data from 2023-2025 showed that
restoration times can be improved, but sustaining restoration time improvements year after year
remains a challenge.
DTE is focused on improving the restoration process, and completed action reviews after each storm to
improve the process. One fundamental change in the restoration process has been to increase
command and control decisions in the field, and accelerating the restoration process by staging
restoration crews and equipment before storms hit. Restoration crews usually have days’ or weeks’
notice before a storm, although the July 3rd storm was an anomaly with only hours of notice.
Two of the six substations that serve Farmington and Farmington Hills did not meet performance
expectations, specifically during the July 3rd storm. DTE will invest $53 million over the next five years in
the Farmington and Farmington Hills electric infrastructure, including 16 new automation devices in
2026 to allow power to be rerouted from a command center in Detroit, in order to shrink the size and
scale of outages. DTE will also invest in pole-top maintenance on 12 circuits in Farmington Hills, in order
to replace cross arms and in some cases entire poles; as well as tree trimming 130 miles of line in
Farmington and Farmington Hills in 2027.

Page 2 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 2 of 20

APPROVED 10/26/2026

Information about reliability data and infrastructure improvements, including for specific addresses, can
found on the Power Improvements Map on the DTE website.
Councilmember comments
• In response to a question from Councilmember Starkman, Mr. Mahoney said that reasons why
Farmington Hills was so vulnerable to outages and why there were disparities in vulnerability in
certain areas of Farmington Hills included weather patterns, area-specific infrastructure needs, and
tree density. Large trees located outside DTE’s utility right-of-way can damage electrical
infrastructure during storms, particularly in heavily wooded neighborhoods where DTE may not
have authority to trim trees.
•

In response to questions from Councilmember Aldred, Mr. Mahoney said DTE’s goal was to
completely automate the entire service territory by the end of the decade. Automation devices can
isolate outages and reduce the number of affected customers, potentially reducing an outage
affecting 1,000 customers to approximately 100. 37% of circuits in the Farmington Hills area are
currently automated, with additional installations planned. Each device represents an investment of
hundreds of thousands of dollars.
Councilmember Aldred emphasized the importance of establishing measurable reliability
improvements associated with the planned infrastructure investments. He requested baseline
performance statistics, projected improvements through 2028, and a method for tracking whether
the investments deliver the expected benefits.

•

Councilmember Knol expressed concern regarding frequent power interruptions occurring during
normal weather conditions, including repeated short outages over several days. She asked what
causes these interruptions and whether the planned infrastructure and technology upgrades would
address them.
Mr. Mahoney said reasons for outages when there is no storm include intentional outages, tree
branches on power lines, failed infrastructure, vehicle collisions with utility poles, animal damage,
and other causes. Trees remain the leading cause of outages, both during storms and when there is
no storm. He further explained that underground electrical infrastructure can be beneficial in
certain circumstances but may require longer repair times because problems are more difficult to
locate and access.

•

In response to a question from Councilmember Bridges, Mr. Mahoney said that the March 2026
$242 million rate increase was for distribution system investments.
Councilmember Bridges expressed concern that DTE has a natural monopoly, but has not lived up to
its responsibility in terms of reliability and affordability. He observed that DTE was an outlier in the
Midwest with a higher than average cost per KWH, while being below standards relative to
reliability. He emphasized the effects of electricity costs and unreliable service on older residents,
businesses and economic development, and asked how DTE would address energy costs and
reliability compared to other areas of the region.

Page 3 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 3 of 20

APPROVED 10/26/2026

Mr. Mahoney responded that DTE evaluates affordability primarily through customers’ monthly bills
rather than electricity rates alone. He reported that the average residential electric bill over the
preceding 12 months was approximately $132, below the Great Lakes regional and national
averages. Average residential bill growth since 2021 was 9.9%, which was among the lowest
increases nationally. He attributed this performance partly to energy efficiency programs and cost
controls.
Mr. Mahoney also pointed out that an aging, non-growing population in Michigan and an economy
that is not diversifying or growing put a strain on customers, with a utility system that was built for a
different economy. Additionally, DTE was investing large amounts of capital to improve reliability
and meet the aggressive clean energy goals set by the State. These factors drive rates, and also
affect bills. He noted that electricity usage patterns can produce higher rates but lower average bills
in Michigan, compared with states having greater electricity consumption.
Mr. Mahoney stated that additional electricity sales to data centers could help offset the cost of
infrastructure improvements. He reported that DTE anticipated the possibility of foregoing rate
increases for two years, as the Saline Township data center begins operating. DTE had approved
agreements involving Oracle and Google. New large customers could provide long-term economic
and affordability benefits.
Councilmember Bridges noted that DTE ranked in the bottom 25% of investor-owned utilities for
power restoration. He emphasized that vegetation management and capital investment should be
continuing priorities, stating that tree trimming should not fall behind when it is known to be a
major cause of outages and extended interruptions.
•

Mayor Pro-Tem Boleware questioned whether DTE's planned $53 million investment over five years
in the Farmington and Farmington Hills area, averaging approximately $10.5 million annually, would
be sufficient to meet residents' electrical needs and improve reliability.
Mr. Mahoney said he could not definitively state whether the proposed funding was sufficient. He
explained that DTE annually evaluates its worst-performing circuits and prioritizes investments in
tree trimming, automation, pole-top maintenance and circuit reconstruction to achieve the greatest
improvements for customers. The Michigan Public Service Commission oversees the company's
investments and performance.
Mayor Pro-Tem Boleware expressed concerns regarding DTE's rate increases, citing a $242 million
increase earlier in 2026, an additional $474 million rate increase since then, and another pending
request. She referenced concerns raised by the Michigan Attorney General regarding the adequacy
of information provided to evaluate proposed increases. She also questioned the balance between
rising customer costs and shareholder returns, noting that shareholder dividends had increased by
approximately $61 million over the previous year, while rate payers saw their bills go up. She
emphasized the financial burden this placed on residents, particularly older adults, and questioned
whether previous infrastructure investments and tree trimming commitments had produced
meaningful improvements. She requested assurances that the planned investments would reduce
outages and improve reliability.

Page 4 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 4 of 20

APPROVED 10/26/2026

Mr. Mahoney pointed out that DTE's reliability data demonstrated improvements from 2023
through 2025. Severe weather had adversely affected performance in 2026. He committed to
continued infrastructure investments intended to reduce outages, improve affordability and
distribute costs equitably.
Mayor Pro-Tem Boleware questioned whether the electrical infrastructure could accommodate
planned data centers, and who would bear the costs of any necessary improvements for the
centers. Mr. Mahoney explained that large data centers connect to a high-voltage transmission
system rather than the local distribution system serving homes and small businesses. Michigan law
requires data centers to pay the costs associated with connecting to the grid and providing the
additional power generation necessary to serve their operations. He maintained that these
arrangements could provide affordability benefits to existing customers and support additional
reliability investments.
Mayor Pro-Tem Boleware asked whether DTE's future infrastructure planning accounted for
changing weather patterns and the possibility of increasingly frequent or severe storms. Mr.
Mahoney confirmed that severe weather considerations are incorporated into DTE's planning. The
company began modifying its vegetation management practices around 2017 in response to
stronger winds, and subsequently improved its storm response procedures following major storms
in 2021 and 2023. These improvements included transferring more operational decision-making
authority to local personnel. He emphasized that infrastructure modernization requires incremental,
cumulative investments. DTE's objective is sustained long-term improvement in reliability, despite
continuing severe weather challenges.
•

Mayor Rich expressed concern regarding the burden placed on the City's Fire Department when
electrical lines are downed during storms. 38 lines went down during the July 3 2026 storm,
requiring City firefighters to remain at potentially hazardous locations until DTE personnel arrived.
This diverted firefighters from other emergencies, resulted in overtime expenses, and sometimes
required mutual aid from neighboring communities who were experiencing the same difficulties.
She asked if DTE had a plan to reimburse municipalities for these additional costs.
Mr. Mahoney responded that not all reported downed wires are electrical lines, although DTE was
the first to respond to reports because of the potential danger.
Mayor Rich addressed reports that DTE line staff had told residents experiencing extended outages
that restoration was delayed because the City's Department of Public Works had not removed fallen
tree branches. She clarified that DPW employees are not trained or authorized to remove trees or
branches entangled with live electrical lines. This work requires DTE's qualified personnel. She
requested clearer communication with residents and DTE work crews, particularly crews arriving
from outside the area, regarding the respective responsibilities of DTE and the City.
Mayor Rich expressed concern for residents who depend on electricity for medical equipment,
particularly older adults who may be unable to afford generators. She asked what protocols DTE has
to identify and assist medically vulnerable residents during extended outages, including helping
them obtain necessary services or access alternative locations with electricity. Mr. Mahoney
explained that customers who rely on life-sustaining electrical equipment can notify DTE so their
accounts can be flagged for additional outreach during outages. DTE also deploys employees to

Page 5 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 5 of 20

APPROVED 10/26/2026

conduct wellness checks during major storms, and is developing a database of locations with
concentrated senior populations, such as the Costick Center, to receive additional attention during
emergencies.
Mayor Rich requested that the City work with DTE to inform residents about registering medically
necessary electrical equipment. She asked whether information could be included in utility bills. Mr.
Mahoney responded that billing communications are subject to Michigan Public Service Commission
regulations. He agreed to explore available options. Acting City Manager Mondora agreed to
coordinate with DTE representative Liz Vogel regarding communication with residents.
CORRESPONDENCE
Mayor Rich shared correspondence from Todd Lipa, Executive Director of CARES, entitled "Beyond the
Pantry: A Community Conversation on Homelessness." The letter described a growing number of
individuals and families seeking food assistance who are also experiencing homelessness, facing eviction
or living in vehicles, including mothers with school-aged children.
The letter emphasized that homelessness requires a coordinated response among municipalities,
nonprofit organizations, school districts, faith communities and service providers. CARES requested
Mayor Rich's leadership in convening a community conversation to identify available resources in order
to address gaps in services and opportunities for collaboration. Particular concerns included access to
emergency shelter, housing assistance, domestic violence services, transportation, and mental health
support. The goal would be to strengthen coordination among existing organizations rather than create
additional agencies or duplicate services.
CONSENT AGENDA
After Mayor Pro-Tem Boleware read the Consent Agenda, Mayor Rich recognized Angana Jhah, who had
submitted a request to speak on Consent Agenda #10.
Ms. Jhah, Berkley, spoke regarding the data center that was approved in Southfield at Eleven Mile and
Inkster Roads, on the border of Farmington Hills. She said that this data center would affect Farmington
Hills more than it would affect Southfield residents. Effects from the data center will include a
temperature rise within four miles of the center, and air pollution. Ms. Jhah asked Farmington Hills to
oppose the data center, which she believed could still be stopped.
City Attorney Joppich explained that Consent Agenda #10 contained a resolution which temporarily
defers any decision on any data center application while the City reviews how such uses will be
regulated. The postponement will extend to March 2027. The resolution only applied to applications for
data centers within Farmington Hills.
MOTION by Aldred, support by Starkman, that the City Council of Farmington Hills hereby
approves consent agenda items 8 through 15 as published.
Roll Call Vote:
Yeas:
Nays:
Absent:
Abstentions:

ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
NONE
NONE
NONE

Page 6 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 6 of 20

APPROVED 10/26/2026

MOTION CARRIED 7-0.
MOTION by Knol, support by Bridges, that the City Council of Farmington Hills hereby approves
consent agenda items 16 and 17 as published.
Roll Call Vote:

Yeas:
ALDRED, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
Nays:
NONE
Absent:
NONE
Abstentions: BOLEWARE

MOTION CARRIED 6-0-0-1.
City Clerk Lindahl noted that Mayor Pro-Tem Boleware was incorrectly marked as absent in the September
28, 2026 meeting minutes; Mayor Pro-Tem Boleware was present at both the study session and regular
meetings on that date.
MOTION by Bridges, support by Knol, that the City Council of Farmington Hills hereby
reconsiders the previous motion to approve consent agenda items 16 and 17 as published.
Roll Call Vote:
Yeas:
Nays:
Absent:
Abstentions:

ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
NONE
NONE
NONE

MOTION CARRIED 7-0.
MOTION by Bridges, support by Knol, that the City Council of Farmington Hills hereby approves
consent agenda items 16 and 17 as published.
Roll Call Vote:
Yeas:
Nays:
Absent:
Abstentions:

ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
NONE
NONE
NONE

MOTION CARRIED 7-0.
CONSENT AGENDA ITEMS FOR DISCUSSION
None.
COUNCILMEMBERS’ COMMENTS AND ANNOUNCEMENTS
Councilmember Bridges addressed the public comments regarding the approved data center in
Southfield. The City had reviewed the matter with the City Attorney and City administration to
determine what actions were available regarding the proposed development. City Attorney Joppich

Page 7 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 7 of 20

APPROVED 10/26/2026

clarified that the City's zoning authority is limited to properties within its municipal boundaries.
Farmington Hills has no jurisdiction over another city’s zoning decisions.
Mayor Rich:
• Thanked City staff for their work on the Citywide Open House and residents for attending, noting
great attendance at this event.
• Mayor’s Youth Council has begun for the year and will be designing a new playground that will be
built at Heritage Park.
• A free winter clothing distribution event will be held at the Church of Jesus Christ of Latter-day
Saints.
• The Farmington Public Schools District will hold their annual senior breakfast on October 15.
• The annual CARES of Farmington Hills fundraiser will be held on October 15
CITY MANAGER UPDATE
Acting City Manager Mondora:
• The Great Lakes Water Authority was scheduled to begin construction work for water main
improvements along 14 Mile Road in the next 30-60 days. A project open house was scheduled for
October 15. Project information and updates will be posted at glwater.org.
• The Hawk Experience with the Michigan Maker’s Market will be held on Saturday, October 17th
from 10:00am-4:00pm. The Fan Jam at The Hawk Experience will be 12:00pm-4:00pm.
• Bagels & Business will be held October 29th in the Black Box Theater at The Hawk.
• About 35 people attended the developer roundtable hosted by the City at Fire Headquarters earlier
today. City staff, the Planning Consultant, and the development community met for a robust
conversation regarding opportunities to modernize and optimize the planning process.
NEW BUSINESS
CONSIDERATION OF APPROVAL OF APPOINTMENT TO THE PARKS AND RECREATION COMMISSION.
MOTION by Starkman, support by Boleware, that the City Council of Farmington Hills hereby
confirms the Mayor’s recommendation to appoint the following individual to the Parks and
Recreation Commission:
Parks and Recreation Commission
Jata Hibbler

Length of Term:
Unexpired Term

Term ending:
February 1, 2028

Jata Hibbler will replace the vacant seat left by Stacey Diefenbach who resigned May 2026.
MOTION CARRIED 7-0.
CONSIDERATION OF APPROVAL OF THE OAKLAND LIVINGSTON HUMAN SERVICE AGENCY
CONCESSION AGREEMENT WITH THE CITY OF FARMINGTON HILLS DEPARTMENT OF SPECIAL
SERVICES. CMR 10-26-128
Director of Special Services Davis explained that the proposed Concession Agreement between the City
of Farmington Hills and the Oakland Livingston Human Service Agency would provide three classrooms
and two office spaces on the third floor of The Hawk for Head Start and Pre-Head Start programs. Head
Start would serve children ages 3 to 5, while Pre-Head Start would serve children from birth to age 3.

Page 8 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 8 of 20

APPROVED 10/26/2026

The agreement would have an initial one-year term, with three additional one-year renewal options, at
an annual lease rate of $70,090. The agreement would also provide $30,000 toward a playground at The
Hawk, should the City elect to install one.
MOTION by Bridges, support by Knol, that the City Council of Farmington Hills hereby authorizes
the Acting City Manager to approve the Concession Agreement with Oakland Livingston Human
Service Agency.
MOTION CARRIED 7-0.
CONSIDERATION OF APPEAL OF A FREEDOM OF INFORMATION ACT REQUEST DATED AUGUST 3, 2026.
Mr. Morgan addressed Council regarding his Freedom of Information Act (FOIA) appeal, Appeal No.
1049-4-26, concerning police case No. CR250021342, involving an assault of Mr. Morgan at Corewell
Health Hospital on June 10, 2025.
Mr. Morgan stated that records initially provided by the City contained approximately 101 redactions
across the police report, computer-aided dispatch records, body camera footage, 911 recording and
video evidence. He questioned whether the redactions were adequately justified under Michigan law
and expressed concern that the records did not accurately identify the individual involved in the
incident.
Mr. Morgan acknowledged that subsequent discussions with City Attorney Young resulted in revisions to
certain records, including resolution of concerns involving the 911 recording and some video redactions.
He identified three outstanding issues:
1. He requested an officially corrected police report, supplemental report or signed document from
the Records Division reflecting the correct spelling of the individual’s last name, which had been
confirmed through email correspondence but remained incorrect or replaced with a placeholder in
the report.
2. He requested reimbursement of the $31.16 FOIA processing fee, contending that the City had not
provided the written justification for labor charges that he believed was required under Michigan
law.
3. He requested a written explanation of the reasons for extending the deadline associated with his fee
appeal, citing statutory notification requirements.
Mr. Morgan emphasized that accurate records were necessary for him to pursue potential civil remedies
or professional licensing complaints related to the incident.
Mr. Morgan also discussed his citizen’s complaint filed August 28, 2026, regarding the Police
Department’s handling of the original assault investigation. The Police Chief’s correspondence dated
October 7, 2026, indicated that the detective had acted appropriately following supervisory review. Mr.
Morgan expressed concern that the Police Department's response did not adequately explain the
investigation or the basis for its findings. He questioned whether relevant evidence and witness
statements had been reviewed and whether the case had received appropriate follow-up. He was
concerned that errors and omissions involving the suspect’s name, numerous redactions and disputed
processing fees hindered his ability obtain accurate records and pursue legal remedies. As civil assault
claims have a 2 year limit, he emphasized the importance of timely access to information. Victims should
be able to rely on police reports, but the records process made it harder to understand the crime

Page 9 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 9 of 20

APPROVED 10/26/2026

instead of easier. He objected to the unexplained redactions, the broken name field and a fee charged
without the legal finding to charge it.
Mr. Morgan asked City Council to consider establishing a process for residents to request an
independent review of police complaint outcomes. He provided a written copy of his comments to the
City Clerk, and requested a response within 14 days.
Mayor Rich clarified that the matter before Council was Mr. Morgan's request for reimbursement of the
$31.16 FOIA processing fee.
City Attorney Joppich explained that the remaining concerns regarding redactions had largely been
resolved through discussions with City Attorney Young, who was working with the Police Department to
provide accurate information regarding the suspect's name. He confirmed that the fee appeal was the
only matter requiring Council action. He noted that the case record had been provided to Mr. Morgan,
and that Mr. Morgan was asking for additional information to be provided. City Attorney Joppich said
that based on exchanges between Mr. Morgan and City Attorney Young, Mr. Morgan was satisfied with
the redaction correction process, but objected to the fee for the FOIA response. City Council was being
asked to make a decision about the fee for the FOIA response.
Councilmember Bridges expressed concern regarding Mr. Morgan's additional allegations about the
Police Department's complaint review process and requested that those matters be examined
separately. City Attorney Joppich agreed to follow up with the Acting City Manager and City Attorney
Young.
MOTION by Bridges, support by Dwyer, that the City Council of Farmington Hills hereby upholds
the Police Department’s costs set forth in its Itemized Fee Schedule, and relating to Mr.
Morgan’s August 3, 2026, FOIA request for the following reasons:
1. The cost complies with the City's publicly available procedures and guidelines and section 4
of the Freedom of Information Act;
2. FOIA Section 4 (1)(a) permits the City to seek the costs associated with preparing and
responding to a FOIA Request;
3. FOIA Section 4 (3) permits the City to seeks reimbursement for FOIA responses that would
pose “unreasonably high costs” to the City.
4. FOIA Section 4 (2)(a) does not apply as the requestor has not provided the necessary
documentation required for a cost reduction of $20.00;
5. The fee waiver request under FOIA Section 4(2) is permissive, no basis has been provided
supporting approval of a waiver in this instance, and the decision on a fee waiver request is
not listed under FOIA Section 10a as being subject to appeal or challenge; and
6. FOIA Section 13, including but not limited to 1 (a), and (l) allows the City to redact
information that would infringe upon an individual’s privacy rights, including medical
information.
Mayor Pro Tem Boleware requested clarification and confirmation that the outstanding concerns would
receive further attention. City Attorney Joppich clarified that the additional information being provided
by City Attorney Young was the full name of the suspect, spelled correctly, and not redacted
information.

Page 10 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 10 of 20

APPROVED 10/26/2026

Mr. Morgan confirmed that he had paid the FOIA fee. He reiterated his request for reimbursement and a
written explanation of the charges. Mayor Rich asked City Attorney Joppich to meet with Mr. Morgan
after the motion, and provide Mr. Morgan with an explanation about FOIA fees. She also asked City
Attorney Joppich to coordinate with City Attorney Young to address the remaining concerns.
MOTION CARRIED 7-0.
CONSIDERATION OF APPROVAL OF A RESOLUTION SUPPORTING THE TRANSPORTATION ALTERNATIVE
PROGRAM GRANT APPLICATION SUBMISSION FOR THE “9 LINE” NON-MOTORIZED PATH ALONG 9
MILE ROAD FROM I-275 TO FARMINGTON ROAD. CMR 10-26-129
Director of Public Services Rushlow explained that the resolution would support the Transportation
Alternative Program (TAP) grant for a 10-foot wide non-motorized shared pathway along Nine Mile Road
between the I-275 Metro Trail and Farmington Road. The proposed pathway will fill an important three
mile gap along a 30-mile regional network connecting ten South Oakland County communities from
South Lyon to Hazel Park, known as the “9 Line”. The preliminary project estimate is $4.5 million. TAP
grant funding would cover about 70% of the costs with $3.2 million of federal grant money and a $1.3
million City share. Letters of support have been received from MDOT Oakland Transportation Service
Center and from the cities of Farmington, Novi, and Southfield.
MOTION by Knol, support by Dwyer, that the City Council of Farmington Hills hereby adopts the
below resolution for the application of a TAP Grant for the section of the “9 Line” from I-275 to
Farmington Road and authorize the Director of Public Services as the designated representative
of the City to apply and carry out all duties to administer the grant, if awarded.
In response to a question from Mayor Pro-Tem Boleware, Acting City Manager Mondora confirmed that
a trailhead on Halsted Road with a connection to the I-275 Metro Trail would be connected to the new
pathway, and noted that the trailhead was a condition of a PUD previously approved by City Council.
Mayor Rich noted that the pathway was expected to be completed in 2029.

Page 11 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 11 of 20

APPROVED 10/26/2026

MOTION CARRIED 7-0.
CONSIDERATION OF APPROVAL OF THE AGREEMENT WITH THE MICHIGAN DEPARTMENT OF
TRANSPORTATION FOR THE CONGESTION MITIGATION AND AIR QUALITY GRANT PROGRAM. CMR 1026-130
City Traffic Engineer Nicita explained that this request was for a cost share agreement with the Michigan
Department of Transportation (MDOT) for a Congestion, Mitigation, and Air Quality (CMAQ) grant. The

Page 12 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 12 of 20

APPROVED 10/26/2026

City was awarded a CMAQ grant to optimize signal timings north of 11 Mile Road in 2021. The funds
were scheduled to be released in fiscal year 2024, but the City applied for an extension due to concerns
that detours and traffic patterns caused by the I-696 closure would compromise the data. I-696 is in the
process of being reopened, and the project can start.
Signal optimization is the retiming of signals to reduce unnecessary waiting periods and help vehicles
move through green lights, reducing idling of vehicles, which will result in a reduction of carbon
emissions, the focus of the grant. The total project cost estimate is just under $350,000 with nearly
$280,000 funded by the grant and $70,000 funded by the City.
OHM Advisors and Connected Traffic Intelligence will be providing engineering services. OHM and CTI
will use connected vehicle trajectory data to determine speeds, locations, and travel paths to help
optimize the signal network. The City has support from the Road Commission of Oakland County on
roads within their jurisdiction, such as 12 Mile, Haggerty, Orchard Lake, and Middlebelt Roads.
MDOT requires a certified resolution indicating that federal funds and the cost share agreement amount
are acceptable. MDOT will then draft a cost share agreement for all authorized officials to sign, which is
included in the meeting packet. The project was expected to start in early 2027.
MOTION by Dwyer, support by Aldred, that the City Council of Farmington Hills hereby
authorizes the Acting City Manager and City Clerk to develop a certified resolution and sign and
enter into the Cost Participation Agreement (26-5317) with MDOT as part of the CMAQ Grant
Program.
MOTION CARRIED 7-0.
CONSENT AGENDA
ACKNOWLEDGMENT OF FOURTH QUARTER FINANCIAL SUMMARY AND QUARTERLY INVESTMENT
REPORTS. CMR 10- 26-131 AND CMR 10-26-132.
MOTION by Aldred, support by Starkman, that the City Council of Farmington Hills hereby
acknowledges the fourth quarter financial summary and quarterly investment reports.
Roll Call Vote:
Yeas: ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
Nays: NONE
Absent: NONE
Abstentions: NONE
MOTION CARRIED 7-0.
ACKNOWLEDGMENT OF FIRST QUARTER FINANCIAL SUMMARY AND QUARTERLY INVESTMENT
REPORTS. CMR 10-26-133 AND CMR 10-26-134.
MOTION by Aldred, support by Starkman, that the City Council of Farmington Hills hereby
acknowledges the first quarter financial summary and quarterly investment reports.
Roll Call Vote:
Yeas:

ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN

Page 13 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 13 of 20

APPROVED 10/26/2026

Nays: NONE
Absent: NONE
Abstentions: NONE
MOTION CARRIED 7-0.
RECOMMENDED ADOPTION OF A RESOLUTION REGARDING THE STUDY AND POSSIBLE CONSIDERATION
OF ZONING ORDINANCE AMENDMENTS AND THE TEMPORARY DEFERRAL AND POSTPONEMENT OF
DECISIONS REGARDING DATACENTER USES.
MOTION by Aldred, support by Starkman, that the City Council of Farmington Hills hereby
approves the following resolution:
STATE OF MICHIGAN
COUNTY OF OAKLAND
CITY OF FARMINGTON HILLS
RESOLUTION REGARDING THE STUDY AND POSSIBLE CONSIDERATION OF ZONING
ORDINANCE AMENDMENTS AND THE TEMPORARY DEFERRAL AND POSTPONEMENT
OF DECISIONS REGARDING DATACENTER USES
RESOLUTION NO. R-210-26
At a regular meeting of the City Council of the City of Farmington Hills, County of Oakland, State
of Michigan, held on October 12, 2026, at 7:30 p.m., Eastern Daylight Savings Time, with those present
and absent being,
PRESENT: ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND
STARKMAN
ABSENT: NONE
the following preamble and resolution were offered by Councilperson Aldred and supported by
Councilperson Starkman:
WHEREAS, for many years, the Farmington Hills Zoning Ordinance has had regulations that allow
for computer processing centers or data centers (referred to in this Resolution as “data centers”) in the B-3,
General Business District, and LI-1, Light Industrial District, as principal permitted uses with some
conditions that include Planning Commission review; and
WHEREAS, over the time period since the adoption of those Zoning Ordinance regulations, the
use and construction of datacenters throughout the country and within Michigan has evolved in a manner
that now sees different, multi-scale types of datacenter facilities that were not contemplated by the City’s
current ordinance regulations, and which in turn have become a topic of interest and concern for residents
of the City and the City Council and its Planning Commission, particularly the impact such datacenters may
have on the environment, public health and safety, community character and aesthetics, and other land uses;
and
WHEREAS, depending on where and how they are constructed and operated, datacenters may have
a large ecological footprint and cost once they are constructed and operating, including but not limited to

Page 14 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 14 of 20

APPROVED 10/26/2026

the potential need for a large amount of space, either vertically or horizontally, the consumption of water
for cooling, electricity usage, and the use of noise-producing generators and other equipment; and
WHEREAS, the City’s zoning and other ordinances currently do not contemplate or adequately
address these advancements and changes in the industry related to this type of land use, nor do they
adequately address the impacts on the character and types of other land uses within and surrounding the
districts in which such datacenters may be permitted under current ordinances; and
WHEREAS, accordingly, the City Council, with the assistance and recommendations of the City
Planning Commission and City staff, desires to ascertain the most appropriate path for the City to address
issues and concerns in its ordinances relative to datacenter land uses in order to protect the public health,
safety, and welfare, and the character, aesthetics, appearance, and property values of the surrounding areas
and Farmington Hills as a whole; and
WHEREAS, multiple news and information sources have demonstrated a significant increase,
growth, and expansion by the datacenter industry of constructing multi-scale datacenter developments in
Michigan, the Great Lakes region, and other states; and
WHEREAS, it is further believed that the City’s Master Plan, adopted pursuant to the Michigan
Planning Enabling Act, Act 33 of 2008, has not fully contemplated or evaluated the development of
properties for datacenters in the City; and
WHEREAS, in connection with the foregoing, and considering the complexity of the subject matter
and the emerging nature of the datacenter industry, the City Council determines that it is necessary and
appropriate that any action taken by a City entity, body, official, and/or agent regarding rezoning, special
land use, site plan, change of use and other similar proposals and submissions pertaining to datacenter uses
must be temporarily postponed or deferred for the following reasons:

a.

It is of major importance, for the future overall development or redevelopment of
Farmington Hills, to ensure that reasonable land uses are authorized and that compatible
development is required in connection with land uses in the City;

b.

If permitted, datacenter land uses in the City are likely to have a significant impact on the
character of the areas of the City in which they are located, as well as an impact on property
values and quality of life, and on the general public health, safety and welfare of the
communities in the City and its residents, businesses, and property owners;

c.

To promote development or redevelopment of the City, and communities within the City,
over the long term in a manner that would complement the rest of those communities and
the City as a whole, not undermine the overall character and planning of the City and its
communities, and remain consistent with the purpose, goals and objectives of the Master
Plan that is implemented by the Zoning Ordinance, including any updates or amendments
to the Master Plan that are under consideration;

d.

To ensure consistent, cohesive and sensible development and land uses in Farmington
Hills;

e.

To clear-up any uncertainty in the City’s zoning and other ordinances regarding the types
of datacenter land uses that are prevalent today and ascertain the most appropriate and

Page 15 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 15 of 20

APPROVED 10/26/2026

safest path for the City to address them in order to protect the public health, safety, and
welfare;
f

The consideration of deciding requests or applications for rezoning, special land use, site
plan, change of use, or other similar submissions and proposals relating to datacenter land
uses during the process of considering whether and how to amend the City’s ordinances to
address such uses in the community would be counter-productive and undermine the City’s
efforts to accomplish the above community-wide planning and zoning objectives and to
provide for the health, safety and welfare of the City and its residents, businesses, and
property owners; and

g.

Under the current circumstances described above, it is within the rights of the City to
establish the rules and procedures regarding postponements and deferrals for decisions to
be made relative to datacenter land uses in order to protect the public health, safety, and
welfare, and other legitimate and lawful land use and zoning considerations.

WHEREAS, the City’s Planning Commission will be studying and reviewing potential ways to
amend the City ordinances to address the types of datacenter land uses that are prevalent today; and
WHEREAS, it is anticipated that, over the course of the next several months, the Planning
Commission will complete its study and review of this subject and will have draft ordinance amendments
forwarded to the City Council for review and consideration, with a report and recommendation from the
Planning Commission; and
WHEREAS, it is the intention of the City Council to complete its review and consideration of the
Planning Commission's recommendation regarding ordinance amendments within 30-60 days of its receipt;
and
NOW, THEREFORE, IT IS HEREBY RESOLVED that, for the reasons and based on the findings
set forth above, the Farmington Hills City Council review and decision on whether to adopt amendments
to the Code of Ordinances to address the issue of datacenter land uses should precede any development,
zoning, planning or other decisions in the City pertaining to applications and submissions relating to such
land uses; and, accordingly, the City Council hereby directs that any decision taken by a Farmington Hills
entity, body, official, and/or agent regarding any proposal or submission for rezoning, special land use, site
plan, planned unit development, change of use, and other types of proposals and submissions that include
the establishment of datacenter land uses, shall be temporarily postponed and deferred, until March 31,
2027.
IT IS FURTHER RESOLVED that the City Council also recognizes that the postponement or
deferral of such actions and decisions could result in inconvenience for some landowners and others
desiring to engage in datacenter land uses in the City, and that such persons might claim an interference
with legitimate rights, and on this basis, the City Council has determined that it is necessary to expedite the
actions contemplated and necessary for completion of the review and adoption of amendments, if any, to
the Code of Ordinances to address the issues relating to datacenter land uses (without compromising the
quality and integrity of the results of such actions), and that it is also necessary to provide a mechanism
allowing a written petition to be submitted to the City Council for relief from the postponement or deferral.
Accordingly:

(1)
The City officials and Planning Commission engaged in the process of reviewing
and forwarding recommended amendments, if any, of the Code of Ordinances to the City

Page 16 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 16 of 20

APPROVED 10/26/2026

Council in connection with this matter are directed to proceed with such efforts as a top
priority and without delay.

(2)
Any property owner who shall feel aggrieved by the temporary postponement or
deferral of decision-making may submit a written request for relief to the City Council, and
upon such submission shall be entitled to a hearing for the purpose of providing an
opportunity to be heard and to demonstrate to the City Council that the temporary
postponement will result in the unreasonable preclusion of viable economic use of property
or otherwise violate applicable provisions of State or Federal constitution or law. Such
hearing shall be conducted within thirty (30) days of the City’s receipt of such written
request. After the conclusion of the hearing, the City Council shall make findings and
conclusions. If it is demonstrated and found that the postponement or deferment has the
effect of unreasonably precluding viable economic use of property, or that it violates a law
or constitutional provision, the City Council will grant relief from the postponement or
deferment to the degree necessary to cure the contravention.
BE IT FURTHER RESOLVED that all resolutions and parts of resolutions insofar as they conflict with the
provisions of this resolution be and the same hereby are rescinded.
AYES: ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
NAYS: NONE
ABSENT: NONE
RESOLUTION DECLARED ADOPTED.
STATE OF MICHIGAN
COUNTY OF OAKLAND

)
) ss.
)

I, the undersigned, the duly qualified and acting City Clerk of Farmington Hills, State of Michigan, do
hereby certify that the foregoing is a true and complete copy of a Resolution adopted by the City Council
of the City of Farmington Hills at a regular meeting held on October 12, 2026, the original of which
resolution is on file in my office.
IN WITNESS WHEREOF, I have hereunto set my official signature, this 13th day of October, 2026.
______________________________________
CARLY LINDAHL, Clerk
City of Farmington Hills
RECOMMENDED APPROVAL OF A SPECIAL EVENT PERMIT FOR THE UNIVERSALIST UNITARIAN CHURCH
OF FARMINGTON’S TREATS ON THE TRAIL EVENT TO BE HELD ON SUNDAY, OCTOBER 25, 2026.
MOTION by Aldred, support by Starkman, that the City Council of Farmington Hills hereby
approves a Special Event Permit for Universalist Unitarian Church of Farmington to hold the Treats
on the Trail event on Sunday, October 25, 2026, from 10:30am to 1:00pm at Universalist Unitarian
Church of Farmington, located at 25301 Halsted Road, subject to the following terms and
conditions:

Page 17 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 17 of 20

▪
▪
▪
▪
▪
▪
▪
▪
▪

APPROVED 10/26/2026

A trick or treat event open to the general public with available parking on property
The event is anticipating 200 people
No police assistance requested for this event
Egress shall be maintained throughout the building
Fires lanes shall not be blocked or restricted
Open flame candles shall be prohibited. Only battery powered candles or glow sticks shall
be utilized
All applicable permits shall be applied for through the Building Department
The proponent must contact Fire Prevention to schedule an inspection prior to beginning
the event
The event shall comply with minimum Fire Prevention Code requirements

Roll Call Vote:
Yeas: ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
Nays: NONE
Absent: NONE
Abstentions: NONE
MOTION CARRIED 7-0.
RECOMMENDED APPROVAL OF THE PUBLIC ART REQUIREMENT GUIDELINES AND PROCEDURES. CMR
10-26-135
MOTION by Aldred, support by Starkman, that the City Council of Farmington Hills hereby
approves Public Art Requirement Guidelines and Procedures.
Roll Call Vote:
Yeas: ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
Nays: NONE
Absent: NONE
Abstentions: NONE
MOTION CARRIED 7-0.
RECOMMENDED APPROVAL OF PURCHASE OF NEW RAIN BIRD IRRIGATION SATELLITES AND CIRRUS
PRO CENTRAL CONTROL STATION FOR THE GOLF COURSE TO SITEONE LANDSCAPE SUPPLY IN THE
AMOUNT OF $126,059.79. CMR 10-26-136
MOTION by Aldred, support by Starkman, that the City Council of Farmington Hills hereby
authorizes the Acting City Manager to issue a purchase order in the amount of $126,059.79 for
these Rain Bird PAR+ES Satellites (15) and Cirrus Pro Central Control, to SiteOne Landscape Supply
as the exclusive distributor in the state of Michigan.
Roll Call Vote:
Yeas: ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
Nays: NONE
Absent: NONE
Abstentions: NONE

Page 18 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 18 of 20

APPROVED 10/26/2026

MOTION CARRIED 7-0.
RECOMMENDED APPROVAL OF AWARD OF BID FOR T-SHIRT IMPRINTING AND GARMENT EMBROIDERY
TO SP DESIGNS AND MFG., INC. FOR THE NEXT THREE YEARS AT AN ESTIMATED ANNUAL AMOUNT OF
$70,000 PER YEAR WITH EXTENSIONS. CMR 10-26-137
MOTION by Aldred, support by Starkman, that the City Council of Farmington Hills hereby
authorizes the Acting City Manager to issue a budgeted purchase order to SP Designs and Mfg.,
Inc. for the next three (3) years at an estimated annual amount of $70,000 per year and for an
additional three (3) one (1) year extensions upon mutual consent of the City and SP Designs and
Mfg., Inc.
Roll Call Vote:
Yeas: ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
Nays: NONE
Absent: NONE
Abstentions: NONE
MOTION CARRIED 7-0.
RECOMMENDED APPROVAL OF CITY COUNCIL SPECIAL MEETING MINUTES OF SEPTEMBER 26, 2026.
MOTION by Aldred, support by Starkman, that the City Council of Farmington Hills hereby
approves the City Council special meeting minutes of September 26, 2026.
Roll Call Vote:
Yeas: ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
Nays: NONE
Absent: NONE
Abstentions: NONE
MOTION CARRIED 7-0.
RECOMMENDED APPROVAL OF CITY COUNCIL STUDY SESSION MINUTES OF SEPTEMBER 28, 2026.
MOTION by Bridges, support by Knol, that the City Council of Farmington Hills hereby approves
the City Council study session minutes of September 28, 2026.
Roll Call Vote:
Yeas: ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
Nays: NONE
Absent: NONE
Abstentions: NONE
MOTION CARRIED 7-0.
RECOMMENDED APPROVAL OF CITY COUNCIL REGULAR SESSION MINUTES OF SEPTEMBER 28, 2026.
MOTION by Bridges, support by Knol, that the City Council of Farmington Hills hereby approves
the City Council regular session minutes of September 28, 2026.

Page 19 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 19 of 20

APPROVED 10/26/2026

Roll Call Vote:
Yeas: ALDRED, BOLEWARE, BRIDGES, DWYER, KNOL, RICH, AND STARKMAN
Nays: NONE
Absent: NONE
Abstentions: NONE
MOTION CARRIED 7-0.
ADDITIONS TO AGENDA
There were no additions to the agenda.
PUBLIC COMMENTS
Rachel Potter, Farmington Hills resident, said that her nine-year-old child was struck by an e-bike shortly
after exiting her school bus on September 30, 2026. She urged the City to review its ordinances and
consider restrictions on speed and operation in pedestrian areas, particularly near schools and bus
stops. She also requested clearer age and safety requirements, stronger enforcement, public education,
improved signage, and police training to ensure appropriate enforcement of applicable laws.
Ray Ingles, Farmington Hills resident, reminded City Council that he had attended the February 23rd City
Council meeting and requested all Farmington Hills Police Department policies regarding the use of
Flock cameras, but the Farmington Hills Police Department did not have a Flock camera use policy, and
still did not have a policy presently. He urged Council to consult with the City Attorney regarding
potential misuse and legal liability. He recommended either establishing clear policies for camera access
and auditing, or discontinuing the system and redirecting the funds to other City priorities.
Mayor Rich noted that the Police Chief attended the City Council meeting following the February
meeting and walked City Council through City policies and practices. Additionally, the issue was
discussed during Council’s recent goal-setting session, and further review would continue before the
current contract expires in mid-2027.
Frank Levanauski, Woodbrook Homeowners Association president, spoke regarding increased traffic and
unsafe turning movements near the Henry Ford Hospital access road at 14 Mile Road and Berry Hill
Street. He noted that the access road, intended for emergency use, has experienced increased traffic
associated with the behavioral health center. He suggested restricting access to right turns only and
requested a City contact to help coordinate potential solutions with Henry Ford Hospital and West
Bloomfield Township, given the jurisdictional and private property considerations.
Acting City Manager Mondora said she would meet with Mr. Levanauski after the meeting.
Julie Spirtus, West Bloomfield resident, addressed similar concerns regarding traffic conditions on 14
Mile Road near Finnegan Street and Orchard Lake Road. She described a near collision on September 29
while attempting to exit her subdivision, and expressed concern about the roadway configuration
following construction of the roundabout at 14 Mile and Orchard Lake Roads. She requested installation
of a traffic signal at 14 Mile and Finnegan Street, and asked for assistance coordinating with the
appropriate agencies.

Page 20 of 20

City of Farmington Hills-City Council Regular Session
October 12, 2026
Page 20 of 20

APPROVED 10/26/2026

Mayor Rich asked Acting City Manager Mondora to meet with Ms. Spirtus after the meeting.
CITY ATTORNEY REPORT
None.
ADJOURNMENT
The regular session of City Council meeting adjourned at 9:47pm.
Respectfully submitted,
Carly Lindahl, City Clerk

Outcome

Not yet recorded. The record stays open — outcomes are added as minutes and vote results are published.

Provenance

Where this record came from. Every source is listed, permanently.

  • Agenda Watch · Oct 28, 2026

Permanent ID DKT-2026-002377 — this record is never deleted.

Record history

Every change to this record, logged as it happened.

  • Oct 28, 2026 Filed on the Docket
  • Oct 28, 2026 Full document archived — public record

← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.