On the agenda: Beacon Falls meeting — License Plate Reader (Jul 13)
Past ⚠ Agenda Watch Beacon Falls, Connecticut · Monday, July 13, 2026 — 3 months ago
About this record
The published agenda for the July 13, 2026 meeting contains: "License Plate Reader". The meeting has passed. The agenda stays here as a permanent public record.
Check the agenda document for the meeting time.
The agenda, word for word
Government public record — the full text of the published document, archived October 5, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗
Town of Beacon Falls
Board of Selectmen
Regular Monthly Meeting Agenda
C/O Town Clerk
10 Maple Avenue Beacon Falls, CT 06403
07/10/2026 1:58 PM
Dear Ms. Hendricks,
Please be advised that the Town of Beacon Falls Board of Selectmen has scheduled a Regular Meeting for Monday, July 13, 2026. The meeting will
begin at 7:00 p.m. in the Beacon Falls Town Hall, located at 10 Maple Avenue, Beacon Falls, CT 06403.
AGENDA
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Call to Order/Pledge to the Flag
Read and Approve Minutes from Previous Meetings
Budget Transfers – Discussion & Action
Comments from the Public
Resident Trooper/Police Report
Wastewater Treatment Plant Report
Public Works Report
Fire Department Report
Fire Marshal Report
Finance Manager Report
Town Clerk Report
Tax Collector Report
Town Treasurer Report
Library Report
Custodial Report
Other Departmental Reports
a. Economic Development Commission Report
b. Animal Control Officer Report
c. Board of Education Report
Reading of Correspondence & Payment of Bills
Old Business
a. Haynes Project Development
b. Traffic Authority – Discussion & Action
c. Rehabilitation of Church St.
d. Rimmon Schoolhouse – Discussion & Action
e. 250th Committee - Discussion & Action
New Business
a. SFY25 and SFY26 EMPG Resolutions
b. ITB 26-2 Maple, Century, and Division Rehabilitation Award
c. Tax Refunds – Discussion & Action
Adjournment
Respectfully submitted,
Lauren A. Fennell
Clerk, Board of Selectmen
*The proposed materials are on file and available for public inspection in the Town Clerk’s Office and will also be accessible electronically within this
agenda packet.*
Regular Meeting Agenda – Board of Selectmen
Clerked by Lauren A. Fennell
Meeting Date: 07/13/2026
1|P a g e
Supporting Documents
TOWN OF BEACON FALLS
FY2026
TRANSFERS FOR 7/13/26 BOS and 7/14/26 BOF
FY2025-2026 BUDGET
Wages will close out on 7/16/2026, but the majority of wage transfers are below. Adjustments have been made to cover 6/29 and 6/30/26 pay.
REGULAR TRANSFERS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
TRANSFER FROM:
Amount
$
(300.00)
10.90.03.1090
Description
Office Supplies
$
(1,257.87)
10.90.03.1121
$
(15,000.00)
10.90.33.1270
$
(2,071.82)
$
$
Line
TRANSFER TO:
Line
10.90.03.1080
Description
Postage
Amount
$
Electricity Solar Generation
10.90.03.1120
Town Hall Electricity
$
Attorneys
10.90.33.1290
Engineering & Consultants
$
10.90.03.1121
Electricity Solar Generation
10.90.44.1121
Fire - Electricity
$
(961.02)
(877.15)
10.90.83.1170
10.90.44.1030
Contingency
Fire Telephone
10.90.44.1435
10.90.44.1436
$
$
$
(142.45)
10.90.44.1030
Fire Telephone
10.90.44.1471
$
$
$
$
$
$
$
$
$
$
$
(215.52)
(40.00)
(1,645.00)
(460.00)
(3,642.12)
(19.78)
(4,163.19)
(1,320.79)
(1,624.63)
(9,882.11)
(2,432.64)
10.90.44.1030
10.90.45.1527
10.90.53.1505
10.90.53.1707
10.90.83.1170
10.90.83.1170
10.90.83.1170
10.90.83.1170
10.90.83.1170
10.90.03.1121
10.90.83.1170
Fire Telephone
Fire Marshal Expenses
Police Training
License Plate Readers
Contingency
Contingency
Contingency
Contingency
Contingency
Electricity Solar Generation
Contingency
10.90.44.1472
10.90.45.1495
10.90.53.1060
10.90.53.1706
10.90.57.1650
10.90.59.1550
10.90.59.1700
10.90.59.1791
10.90.59.1793
10.90.67.1121
10.90.67.1130
Fire - Building Maintenance
Fire - Building Equipment
Fire - Mandatory Vehicle &
Equipment Inspection
Fire Vehicle Repairs
Fire Marshal Training
Police Computer Support
Traffic Cameras
Street Lighting and Charging Station
Highway & Parks Equipment
Public Works Vehicle Fuel
PW Propane
Town Garage Building Maintenance
WWTP - Electricity
WWTP - Equipment Replacement
$
(27,000.00)
10.90.83.1170
Contingency
10.90.67.1770
Sludge Processing
$
$
(1,789.95)
10.90.03.1121
Electricity Solar Generation
10.90.71.1121
Parks Electricity Water & Fuel
$
$
(74,846.04)
$
$
$
$
$
$
$
$
$
$
$
$
$
Explanation
300.00 Slight overage
Solar panels were down for 3 months; electricity
1,257.87
higher
15,000.00 To cover June Engineering Bill
Solar panels were down for 3 months; electricity
2,071.82
higher
961.02 Slight overage
877.15 Slight overage
142.45 Slight overage
215.52
40.00
1,645.00
460.00
3,642.12
19.78
4,163.19
1,320.79
1,624.63
9,882.11
2,432.64
Slight overage
Slight overage
Unforeseen software change-overs
Payroll hours needed to review tickets
New EV station
Slight overage
Storms/Additional Maintainer
Garage requires additional heat
Increased Internet speed
Checking Public Benefit costs
A handful of WWTP equipment failures/breaks
Underbudgeted, due to mid-year increases in
27,000.00
costs. MOVE TO TOWN MEETING.
Solar panels were down for 3 months; parks utility
1,789.95
bills higher
74,846.04
YEAR-END SALARY TRANSFERS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
TRANSFER FROM:
Amount
$
(19,525.00)
$
(0.24)
$
(225.00)
$
(175.00)
$
(2,040.00)
Line
Description
Wage Salary Adjustments
Wage Salary Adjustments
Wage Salary Adjustments
Wage Salary Adjustments
Wage Salary Adjustments
TRANSFER TO:
Line
Wage Salary Adjustments
Revaluation
Finance OT
Wage Salary Adjustments
Land Use Intern
PT Patrol Wages
PT Patrol Wages
PT Patrol Wages
PT Patrol Wages
PT Patrol Wages
Wages - Highway Maintainers
Wages - Highway Maintainers
Wages - Highway Maintainers
10.90.01.1020
10.90.07.1010
10.90.07.1020
10.90.11.1020
10.90.11.1024
10.90.15.1041
10.90.15.1044
10.90.20.1044
10.90.20.1046
10.90.20.1061
10.90.53.1010
10.90.53.1020
10.90.53.1040
10.90.53.1052
10.90.53.1054
10.90.59.1010
10.90.59.1011
10.90.59.1012
Description
First Selectman's Secretary Wages
Wages - Tax Collector
Wages - Asst Tax Collector
Wages - Building Inspector
Wages - WEO
Amount
$
19,525.00
$
0.24
$
225.00
$
175.00
$
2,040.00
Explanation
Coverage when away
Slight overage
Payout
Slight overage
Wetlands Enforcement Officer worked addtnl hrs
Wages - Certified Assessor
Wages - Assessor Overtime
Wages - Finance Admin
Wages - Finance Manager
Wages - Intern
Resident State Trooper
Wages FT Patrol
Wages - Police Clerk
FT Patrol Overtime
Shft Differential
Wages - Foreman
Wages - Asst Foreman
Wages - Crew Leader
$
$
$
$
$
$
$
$
$
$
$
$
$
1,350.00
1,328.70
552.00
2,003.00
521.00
4,080.48
11,575.00
380.00
11,060.00
350.00
10,577.72
11,344.40
4,949.90
OT
OT
Payout
OT
Addnl. hours needed for capital asset software
OT & Increase
Leave payouts
Slight overage
Corporal working additional shifts
Slight overage
Leave payouts
Leave payouts
Leave payouts
In addition to $19,999 from winter, so this will
MOVE TO TOWN MEETING
Payouts
Payouts
Payouts
Heavy Winter
Payouts
Additional Hours due to leave of FT
June hours worked by Director to prep for camp
Payout and additional hours for sub driver
$
(380.00)
$
$
$
$
$
(11,060.00)
(350.00)
(10,577.72)
(11,344.40)
(4,949.90)
10.90.13.1245
10.90.13.1245
10.90.13.1245
10.90.13.1235
10.90.13.1235
10.90.13.1235
45.90.15.1000
10.90.20.1047
10.90.20.1047
10.90.11.1061
10.90.53.1041
10.90.53.1041
10.90.53.1041
10.90.53.1041
10.90.53.1041
10.90.59.1013
10.90.59.1013
10.90.59.1013
$
(16,960.29)
10.90.59.1013
Wages - Highway Maintainers
10.90.59.1049
Public Works Overtime
$
16,960.29
$
$
$
$
$
$
$
$
(9,175.00)
(7,066.13)
(2,268.55)
(8,011.35)
(725.00)
(3,775.00)
(1,300.00)
(3,165.00)
10.90.83.1170
10.90.67.1776
10.90.67.1776
10.90.67.1776
10.90.83.1170
10.90.83.1170
40.90.71.1245
10.90.77.1470
Plant Operations
Nitrogen Credits
Nitrogen Credits
Nitrogen Credits
Contingency
Wage Salary Adjustments
Summer Camp
Mini Bus Gas and Maintenance
10.90.67.1010
10.90.67.1011
10.90.67.1042
10.90.67.1049
10.90.69.1010
10.90.69.1019
10.90.71.1019
10.90.77.1041
Wages - WWTP Supervisor
Wages - Asst Supervisor
Wages - WWTP Maintainer
Wages - Overtime
Wages - Full Time Library
Part Time Librarians
Wages - Seasonal
Wages - Mini Bus Driver
$
$
$
$
$
$
$
$
9,175.00
7,066.13
2,268.55
8,011.35
725.00
3,775.00
1,300.00
3,165.00
$
(134,483.76)
$
$
$
$
$
$
$
(1,350.00)
(1,328.70)
(552.00)
(2,003.00)
(521.00)
(4,080.48)
(11,575.00)
$134,483.76
Current Balance
Total of 2 Batches of (47 total) Transfers $
(209,329.80)
10.90.13.1245
10.90.83.1170
10.90.53.1041
10.90.67.1776
10.90.59.1013
10.90.03.1121
10.90.33.1270
10.90.67.1170
Various
Various for Wages
Balance After
Before Transfers
Transfers
Total of Significant Lines Used for Transfers
$ (29,093.24) Wage Salary Adjustments Used
$
29,404.77 $
311.53
$ (41,889.17) Contingency Used
$
42,584.82 $
695.65
$ (27,445.48) PT Patrol Used
$
54,495.73 $
27,050.25
$ (17,346.03) Nitrogen Credits Used
$
17,987.00 $
640.97
$ (43,832.31) Highway Maintainer Line Used
$
70,330.93 $
26,498.62
$ (15,001.75) Solar Generation - Electricity Used
$
27,932.25 $
12,930.50
$ (15,000.00) Attorneys
$
25,532.36 $
10,532.36
$
(9,175.00) Plant Operations
$
10,153.64 $
978.64
Office Supplies/Fire Telephone/Police
$
(3,680.12) Training/License Plate Readers
Reval/Finance OT/Land Use Intern/Mini
$
(6,866.70) Bus Gas/Camp
$ (209,329.80)
TOWN OF BEACON FALLS
FY2027
TRANSFERS FOR July BOS & BOF Meetings
FY2026-2027 BUDGET
TRANSFER FROM:
#
Amount
TRANSFER TO:
Line
Description
Line
Description
Amount
Explanation
Excel Formula Error on Budget: did not pick
1
$
(10,000.00) 10.90.83.1170
Contingency
10.90.53.1708
Community Policing - New Line
$
10,000.00 up this new line
2
$
(5,000.00) 10.90.83.1170
Contingency
10.90.77.1475
Trips/Mini Bus Events - New Line
$
5,000.00 up this new line
$
(15,000.00)
Excel Formula Error on Budget: did not pick
$15,000.00
LINES TO MONITOR
Line
Description
Nothing yet!
ATESD PROGRAM
SAFTEY ANALYSIS &
PROPOSED SITE EXPANSION
Town of Beacon Falls, CT
Published May 8th 2026
SAFTEY ANALYSIS
The Town of Beacon Falls implemented a bi-directional ATESD Speed Camera site at
201 S Main St. The system became operational on December 25th, 2025, with live
citations e ective on January 24th, 2026.
The goal of this analysis is to identify the impacts of the program, notably the reduction
in dangerous vehicle speeds which contribute to crash activity and injuries.
Key Findings:
Compliance improved from less than 10% to over 75%
85th percentile speeds reduced nearly 20% from 53 mph to 43 mph
Reckless speeding events were reduced by over 97% (20+ mph over limit)
Compliance to Posted Limit (40 Mph)
201 S Main St - Beacon Falls, CT
100.0%
90.0%
80.0%
70.0%
60.0%
50.0%
40.0%
30.0%
20.0%
10.0%
0.0%
Nov-25
Dec-25
Jan-26
Non-Speeders
Pre-Program
Feb-26
Mar-26
Apr-26
Speeders
Citation Period
Warning Period
Avg Monthly Traffic Count by Mph Over Speed Limit
Nov-25
Nov-25
Apr-26
Apr-26
NB 40
SB 40
NB 40
SB 40
Limit
Date
Heading
-
85th %
52
54
40
45
ASE
Citable
Events
35,840
58,410
620
1,574
0
1 - 10
11 - 15
16 - 20
21+
Monthly
Total
17,940
11,480
121,076
102,995
107,240
87,880
16,640
42,040
25,620
40,010
511
1,283
7,720
14,020
76
197
2,500
4,380
33
94
161,020
157,770
138,336
146,609
Page | 1
PROPOSED SITE EXPANSION – SPEED STUDY
STUDY GOAL
The Town of Beacon Falls identified two sites where speeding poses a significant risk to
public safety. These locations were identified based on citizen feedback, crash data,
and enforcement data. The goal of this study is to support the Town in making an
informed decision regarding appropriate countermeasures that improve safety.
SITE OVERVIEW
Existing ATESD
Proposed ATESD
SPEED STUDY SUMMARY
Page | 2
BEACON VALLEY RD W.O. BEACON HILL COMMON- EB
Average Traffic
Daily
Monthly
Speed (Mph)
46+
41 - 45
36 - 40
26 - 35
0 - 25
Total
189.0
468.3
5,670.0
1,376
719.0
591.0
52.3
2,020
591
52
14,050.0
% of All Traffic
9.4%
41,290
23.2%
21,570.0
35.6%
17,730
1,570.0
1,570
60,590
29.3%
17,730.0
29.3%
2.6%
2.6%
100%
Data Source: Traffic Data Bank (03/23/26 - 03/25/26)
Page | 3
68.1%
BEACON VALLEY RD E.O. BEACON HILL COMMON- WB
Average Traffic
Daily
Monthly
Speed (Mph)
46+
41 - 45
36 - 40
26 - 35
0 - 25
Total
114.3
323.0
3,430.0
1,018
580.3
627.0
48.0
1,693
627
48
9,690.0
% of All Traffic
6.8%
30,530
19.1%
17,410.0
34.3%
18,810
1,440.0
1,440
50,780
37.0%
18,810.0
37.0%
2.8%
2.8%
100%
Data Source: Traffic Data Bank (03/23/26 - 03/25/26)
Page | 4
60.1%
MUNSON RD S.O. PAMANATA MEADOWS- NB
Average Traffic
Daily
Monthly
Speed (Mph)
51+
46 - 50
41 - 45
31 - 40
0 - 30
Total
13.0
390.0
367
70.3
283.7
768.3
117.0
1,252
768
117
2,110.0
% of All Traffic
1.0%
11,010
5.6%
8,510.0
22.7%
23,050
3,510.0
3,510
37,570
61.4%
23,050.0
61.4%
9.3%
9.3%
100%
Data Source: Traffic Data Bank (03/23/26 - 03/25/26)
Page | 5
29.3%
MUNSON RD S.O. PAMANATA MEADOWS- SB
Speed (Mph)
51+
46 - 50
41 - 45
31 - 40
0 - 30
Total
Average Traffic
Daily
Monthly
55.7
214.7
1,670.0
709
439.0
525.7
104.3
1,339
526
104
6,440.0
% of All Traffic
4.2%
21,280
16.0%
13,170.0
32.8%
15,770
3,130.0
3,130
40,180
39.2%
15,770.0
39.2%
7.8%
7.8%
100%
Data Source: Traffic Data Bank (03/23/26 - 03/25/26)
Page | 6
53.0%
APPENDIX
SPEED STUDY CONDITIONS
Weather: Weather conditions were favorable for most of the study period. The only
adverse activity was approximately 1” of rainfall late night into early morning on the 23rd
Special Events: No special events were observed during the study period.
Page | 7
Speed Enforcer Monthly Program Report
04/01/2026 through 04/30/2026
Town of Beacon Falls, CT
Location(s): All
Speed Enforcer Stats
2026-04
Total
Average
Highest Speed Observed that Month
80
80
# of Speeding Events 20+ MPH Over
132
132
132
# of Speeding Events 15-20 MPH Over
451
451
451
# of Speeding Events 10-15 MPH Over
1,648
1,648
1,648
Total # of Speeding Events 10+ MPH Over
2,231
2,231
2,231
Repeat Violator Analysis
2026-04
Total
Average
% of First Offense Violators
44.6%
# of First Offense Violators
995
44.6%
995
995
Repeat Violator Analysis
2026-04
% of 2nd Offense Violators
3%
# of 2nd Offense Violators
67
Total
Average
3%
67
67
% of Habitual Violators - 3 Violations or More
52.4%
52.4%
# of Habitual Violators - 3 Violations or More
1,169
1,169
1,169
Event Processing & Citation Summary
2026-04
Total
Average
Step 1 Events Reviewed By Processors
2,231
2,231
2,231
Step 1 Events Rejected By Processors
175
175
175
Step 2 Events Reviewed By Municipality
2,048
2,048
2,048
Step 2 Events Rejected By Municipality
166
166
166
Step 3 Citations Issued/Mailed to Violators
1,874
1,874
1,874
Step 3 Citations Now Paid
1,210
1,210
1,210
Step 3 Citations Now Paid - Payment Rate
64.57%
Contest/Appeal Summary
2026-04
Total
Average
Citation Contests/Appeals Requested
135
135
135
Citation Contests/Appeals Found Liable
104
104
104
Contest/Appeal Summary
2026-04
Total
Average
8
8
8
Monthly Program Revenue Summary
2026-04
Total
Average
# Citation Payments Made This Month
1,662
1,662
1,662
$111,965.00
$111,965.00
$111,965.00
Citation Contests/Appeals Found Not Liable
$ Citations Payments Collected This Month
Speed Enforcer Monthly
Program Report
06/01/2026 through 06/30/2026
Town of Beacon Falls, CT
Location(s): All
Export to Excel
Speed Enforcer Stats
Export to CSV
2026-06
Print Table
Total
Average
Highest Speed Observed that Month
83
83
# of Speeding Events 20+ MPH Over
96
96
96
# of Speeding Events 15-20 MPH Over
290
290
290
# of Speeding Events 10-15 MPH Over
1,076
1,076
1,076
Total # of Speeding Events 10+ MPH Over
1,462
1,462
1,462
Repeat Violator Analysis
2026-06
Total
Average
% of First Offense Violators
81.3%
# of First Offense Violators
1,189
% of 2nd Offense Violators
7.3%
# of 2nd Offense Violators
107
% of Habitual Violators - 3 Violations or More
11.4%
# of Habitual Violators - 3 Violations or More
166
81.33%
1,189
1,189
7.32%
107
107
11.35%
166
166
Event Processing & Citation Summary
2026-06
Total
Average
Step 1 Events Reviewed By Processors
1,397
1,397
1,397
Step 1 Events Rejected By Processors
149
149
149
Step 2 Events Reviewed By Municipality
1,247
1,247
1,247
Step 2 Events Rejected By Municipality
72
72
72
Step 3 Citations Issued/Mailed to Violators
1,169
1,169
1,169
Step 3 Citations Now Paid
350
350
350
Step 3 Citations Now Paid - Payment Rate
29.94%
Contest/Appeal Summary
2026-06
Total
Average
Citation Contests/Appeals Requested
46
46
46
Citation Contests/Appeals Found Liable
32
32
32
Citation Contests/Appeals Found Not Liable
10
10
10
Monthly Program Revenue Summary
2026-06
Total
Average
# Citation Payments Made This Month
880
880
880
$59,210.00
$59,210.00
$59,210.00
$ Citations Payments Collected This Month
Speed Enforcer Monthly Program Report
05/01/2026 through 05/31/2026
Town of Beacon Falls, CT
Location(s): All
Speed Enforcer Stats
2026-05
Total
Average
Highest Speed Observed that Month
86
86
# of Speeding Events 20+ MPH Over
134
134
134
# of Speeding Events 15-20 MPH Over
336
336
336
# of Speeding Events 10-15 MPH Over
1,292
1,292
1,292
Total # of Speeding Events 10+ MPH Over
1,762
1,762
1,762
Repeat Violator Analysis
2026-05
Total
Average
% of First Offense Violators
83%
# of First Offense Violators
1,462
82.97%
1,462
1,462
Repeat Violator Analysis
2026-05
Total
Average
% of 2nd Offense Violators
7.4%
# of 2nd Offense Violators
131
% of Habitual Violators - 3 Violations or More
9.6%
# of Habitual Violators - 3 Violations or More
169
169
169
Event Processing & Citation Summary
2026-05
Total
Average
Step 1 Events Reviewed By Processors
1,757
1,757
1,757
Step 1 Events Rejected By Processors
177
177
177
Step 2 Events Reviewed By Municipality
1,574
1,574
1,574
Step 2 Events Rejected By Municipality
130
130
130
Step 3 Citations Issued/Mailed to Violators
1,437
1,437
1,437
Step 3 Citations Now Paid
513
513
513
Step 3 Citations Now Paid - Payment Rate
35.7%
Contest/Appeal Summary
2026-05
Total
Average
Citation Contests/Appeals Requested
67
67
67
Citation Contests/Appeals Found Liable
51
51
51
7.43%
131
131
9.59%
Contest/Appeal Summary
2026-05
Total
Average
11
11
11
Monthly Program Revenue Summary
2026-05
Total
Average
# Citation Payments Made This Month
1,355
1,355
1,355
$92,760.00
$92,760.00
$92,760.00
Citation Contests/Appeals Found Not Liable
$ Citations Payments Collected This Month
WPCF
Monthly Report
June 2026 Meeting
Total Flow (RAW SEWAGE) :
Total Septage Received :
Total Sludge Removed :
Beacon Heights Leachate :
Total Phosphorous Discharged :
Total Nitrogen Discharged :
May 2026 Data
9,392,300 gals.
21,350 gals.
115,900 gals.
558,157 gals.
1.78 lbs./day
19 lbs./day
EMERGENCY CALLS & ALARMS :
5-1 Called out to a sewer back-up on Division St, sewage was coming up out of manhole #926. American Rooter responded to
our call and cleared the line, repairs are needed and have been scheduled.
Repair or Replacement :
Our Tsurumi grinder pump for Pines bridge pump station has been rebuilt, currently all of the stations have a new or
rebuilt pump ready for service.
Sewer repair : 10 Beacon St. had a root ball in their lateral, the repair was done on 5/30 by Green Construction Management
CCTV Sewer inspection: Main street has been completed , work had to be preformed during our low flow period over night
for two consecutive evenings. SLR should have the report soon with their findings.
Maintenance:
5-27 All three of our blowers annual service and inspections were preformed, the report was good . We will be keeping a
close eye on # 1 blower motor, the bearing is showing sings of wear.
Ongoing :
5-28 Asset tags have been put on most of our assets at this time ,this project is ongoing.
Landscaping ,mowing, weed whacking ,shrub and tree trimming are in full swing along with along keeping the plant running
as well as it possibly can.
Meetings / Classes :
5-15 Facilities tour at the Meriden and Cheshire WPCF sites
Thank you,
For letting me serve.
Thomas A. Carey
WPCF Superintendent
WPCF
Monthly Report
July 2026 Meeting
Total Flow (RAW SEWAGE) :
Total Septage Received :
Total Sludge Removed :
Beacon Heights Leachate :
Total Phosphorous Discharged :
Total Nitrogen Discharged :
June 2026 Data
7,934,000 gals.
10,750 gals.
140,300 gals.
514,153 gals.
2.15 lbs./day
16 lbs./day
EMERGENCY CALLS & ALARMS :
6-4 Call-back: Fire at O&G lot Eversource needed access to easement at WPCF, so they could disconnect power.
6-8 Sewer back up on Maple Ave. manhole #901, this section from #925 to # 901 should be added to the Maple ,Division and
Century sewer upgrade.
Repair or Replacement :
6-4 Spectrum reseeded in areas where the new grass didn't grow
6-18 A sewer repair was made by Bob Merek & Sons on Division St
9/19 Bollard covers installed at the WPCF by Spectrum, this is the last of their punch list items
Testing :
Quarterly ATMR (Acute Toxicity Monitoring Repot) and sludge testing scheduled for 7-13
Misc.:
Arcadis has been invoiced $10,154.09 for the second quarter leachate flow from the Beacon Heights landfill site.
Cost of Nitrogen credits were $27,013 for calendar year 2025
New cell phones were issued at the WPCF
Ongoing :
Weekly yard maintenance at all WPCF sites
Working on permit application for sludge disposal at Passaic Valley New Jersey in the event Connecticut facilities are down
Meetings / Classes :
SLR check-in Teams meeting :
Monthly safety assignments CIRMA/Vector Solutions
Thank you,
For letting me serve.
Thomas A. Carey
WPCF Superintendent
Town
of BEACON
FALLS
e-onnecticut
00
NECTIC
Public Works Department
June 30, 2026
Monthly Report
Bulky Waste Event 6/27/26- 1 metal, I mattress, 1 electronics container, 8 bulky
waste dumpsters. Hauled leaves and brush from garage to Breault debris site.
Natures Harvest was hired to haul away loads of brush and logs from the site for
cleanup.
Roadside mowing with brush tractor for sight lines. Mowed and weed wacked
around guard rails Beacon Valley, Andrasko, Blackberry, Skokorat, Rice La,
Main St., Burton, Cook, Lancaster, Rimmon, Lopus, and Old Pines Bridge.
Patch potholes on streets -Main St., Lopus, Pent, Old Pines Bridge, Rimmon Hill,
Pent, and West Rd. Began removing broken curbing and installing new curbing
on roads, backfill, topsoil and seed.
Shaw Vac LLC began cleaning CBs throughout town. 408 total on the list.
Tri State sweeping
was hired to sweep the Main St area for the parade.
Sealing
Crack
Northeast
was hired to crack seal town roads.
Replace CB on Wolfe Ave which the sidewall fell in creating sink hole. Replaced
with a new precast structure.
Mowed and maintained Town Properties. Cleanup the center median on Main St.
and clean commuter parking lot up. Patch potholes at the firehouse and prepare
for carnival.
C.Y.B.D. mark outs. Video inspection of North and South Main storm sewer.
Clear drainage structure on Blackberry hill
Worked with Town Engineers on closing out road projects- Church and West Rd.
Ordered fuel and prepared fuel reports.
Cut and clean up a tree that fell on Pent Rd.
Met with Aquarion Water to go over sewer locations on Main St for the water
main replacement project.
Road Foreman
Rob Pruzinsky
CC: Gerard Smith
Mike Krenesky
Pete Betkoski
BEACON HOSE
COMPANY NO. 1
35 NORTH MAIN STREET, BEACON FALLS, CT 06403
P: 203-729-1470 • F: 203-723-2209 • BEACONHOSE.COM
June 25, 2026
Gerard Smith, 1st Selectman
Town of Beacon Falls
10 Maple Avenue
Beacon Falls, CT 06403
Re: Monthly Activity Report for May 2026
Dear 1st Selectman Smith,
During the month of May 2026, Beacon Hose Company No. 1 responded to the following calls:
EMS
Fire
Calls: 70
Transports: 51
Stand by: 5
Refusals: 5
No Contact: 0
Cancelled: 9
Mutual Aid Given: 8 (3 Naugatuck, 4 Seymour, 1 Waterbury)
Training: Splinting
Calls: 22
Co alarm:1
Chimney Fire:1
Citizen/assist/service call:1
Electrical hazard/short circuit:1
Electrical power line down/ arching / malfunction: 2
Fire/ Smoke Alarm: 3
Intentional false alarm:1
Motor Vehicle Collision 5
Other False Call:1
Standy by:2
Vehicle fire- passenger:1
Mutual Aid Given: 1 Naugatuck
Trainings: Fire Police Training, Pump Operations Training, Truck Checks.
Activities: Memorial Day Ceremony, Naugatuck Memorial Day parade.
Document — PAGE 1
BEACON HOSE
COMPANY NO. 1
35 NORTH MAIN STREET, BEACON FALLS, CT 06403
P: 203-729-1470 • F: 203-723-2209 • BEACONHOSE.COM
Respectfully submitted by,
Brian DeGeorge, Fire Chief
cc: Michael Krensky, 2nd Selectman
Peter Betkoski, 3rd Selectman
Document — PAGE 2
BEACON HOSE
COMPANY NO. 1
35 NORTH MAIN STREET, BEACON FALLS, CT 06403
P: 203-729-1470 • F: 203-723-2209 • BEACONHOSE.COM
July 6, 2026
Gerard Smith, 1st Selectman
Town of Beacon Falls
10 Maple Avenue
Beacon Falls, CT 06403
Re: Monthly Activity Report for June 2026
Dear 1st Selectman Smith,
During the month of June 2026, Beacon Hose Company No. 1 responded to the following calls:
EMS
Calls: 72
Transports: 45
Stand by: 5
Refusals: 14
No Contact: 0
Cancelled: 6
Assist: 2
Mutual Aid Given: 11 (3 Ansonia, 4 Seymour, 1 Waterbury, 3 Naugatuck )
Training: none
Fire
Calls: 40
Accidental alarm:1
CO alarm:1
Citizen assist/service call:11
Electrical powerline down / arching / malfunction:1
Fire / smoke alarm:1
Malfunctioning alarm:4
Motor Vehicle Collision: 6
No incident found upon arrival:1
Other outside fire:1
Stand by:1
Structural involvement mutual aid:1
Mutual Aid Given: 2 Bethany
Trainings: Stokes Basket packaging
Document — PAGE 1
BEACON HOSE
COMPANY NO. 1
35 NORTH MAIN STREET, BEACON FALLS, CT 06403
P: 203-729-1470 • F: 203-723-2209 • BEACONHOSE.COM
Activities: BHC Carnival!
Respectfully submitted by,
Brian DeGeorge, Fire Chief
cc: Michael Krensky, 2 nd Selectman
Peter Betkoski, 3rd Selectman
Document — PAGE 2
Town Only
Cash
Check
Credit Card
Terminal
0.00
0.00
0.00
0
0
0
Run on:
Batch
Percent Collection as of 06/30/2026
Uncollected - 0.57%
Collected - 99.43%
Uncollected - 0.24%
Collected - 99.76%
Uncollected - 4.79%
Collected - 95.21%
Total Due = $91,801.14
Total Due = $2,629.80
Total Due = $95,242.52
Total Paid = $15,962,486.74
Total Paid = $1,109,637.26
Total Paid = $1,892,290.61
Type
Total Billed
Total Paid
Total Due
Percent Collected
REAL ESTATE
16,054,287.88
15,962,486.74
91,801.14
99.43
PERSONAL PRO
1,112,267.06
1,109,637.26
2,629.80
99.76
MOTOR VEHICL
1,987,533.13
1,892,290.61
95,242.52
95.21
MOTOR SUPPLE
265,317.48
227,913.75
37,403.73
85.90
SEWER ASSESS
44,986.42
52,263.80
-7,277.38
116.18
WATER
8,630.85
15,484.57
-6,853.72
179.41
TOTALS:
$19,473,022.82
$19,260,076.73
$212,946.09
Original Beginning Balance Totals
Type Count Gross Assessment
REAL ESTATE 2,499
REAL ESTATE C
85
First Installment
Second Installment
Total Tax
502,774,410
Exemptions Net Assessment
3,530,850
499,243,560
7,524,424.92
7,524,009.50
15,048,434.42
11,412,530
301,830
11,110,700
125,568.87
125,492.63
251,061.50
REAL ESTATE X
89
44,488,160
44,488,160
0
0.00
0.00
0.00
PERSONAL
PROPERTY
279
47,868,235
11,338,451
36,529,784
558,944.39
553,753.60
1,112,697.99
MOTOR 6,134
VEHICLE
66,657,737
213,510
66,444,227
2,013,081.97
0.00
2,013,081.97
MOTOR 1,219
SUPPLEMENTAL
19,164,320
7,557
19,156,763
266,557.85
0.00
266,557.85
0
0
40,974.93
0.00
40,974.93
SEWER
ASSESSMENT
249
0
WATER
179
0
0
0
10,568.66
0.00
10,568.66
MELBOURNE
TRUST N
1
0
0
0
0.00
0.00
0.00
TOTALS: 10,734
692,365,392
59,880,358
632,485,034
10,540,121.59
8,203,255.73
18,743,377.32
Exemptions Net Assessment
Total Tax
Waived Amount
0.00
0.00
Waived Bills
Type Count Gross Assessment
TOTALS:
0
0
0
0
Summary of Cash Collections - Year to Date
Type
Taxes
Bond Int
Interest
Lien
Fees
Total
REAL ESTATE
15,962,486.74
0.00
28,723.90
72.00
112.00
15,991,394.64
PERSONAL PROPERTY
1,109,637.26
0.00
2,331.16
0.00
0.00
1,111,968.42
MOTOR VEHICLE
1,892,290.61
0.00
26,146.78
0.00
80.00
1,918,517.39
MOTOR SUPPLEMENTAL
227,913.75
0.00
2,678.14
0.00
0.00
230,591.89
SEWER ASSESSMENT
1,204.57
504.74
230.28
0.00
0.00
1,939.59
WATER
1,604.66
109.66
32.30
24.00
0.00
1,770.62
MELBOURNE TRUST
1,056.97
0.00
0.00
0.00
0.00
1,056.97
TOTALS:
19,196,194.56
614.40
60,142.56
96.00
192.00
19,257,239.52
Summary of Cash Collections - Monthly for June 2026
Type
Taxes
Bond Int
Interest
Lien
Fees
Total
REAL ESTATE
12,131.71
0.00
1,802.81
72.00
6.00
14,012.52
MOTOR VEHICLE
14,337.61
0.00
2,518.63
0.00
0.00
16,856.24
MOTOR SUPPLEMENTAL
2,804.19
0.00
253.73
0.00
0.00
3,057.92
TOTALS:
29,273.51
0.00
4,575.17
72.00
6.00
33,926.68
Town Only
Cash
Check
Credit Card
Terminal
0.00
0.00
0.00
0
0
0
Run on:
Batch
Percent Collection as of 06/30/2026
Uncollected - 0.57%
Collected - 99.43%
Uncollected - 0.24%
Collected - 99.76%
Uncollected - 4.79%
Collected - 95.21%
Total Due = $91,801.14
Total Due = $2,629.80
Total Due = $95,242.52
Total Paid = $15,962,486.74
Total Paid = $1,109,637.26
Total Paid = $1,892,290.61
Type
Total Billed
Total Paid
Total Due
Percent Collected
REAL ESTATE
16,054,287.88
15,962,486.74
91,801.14
99.43
PERSONAL PRO
1,112,267.06
1,109,637.26
2,629.80
99.76
MOTOR VEHICL
1,987,533.13
1,892,290.61
95,242.52
95.21
MOTOR SUPPLE
265,317.48
227,913.75
37,403.73
85.90
SEWER ASSESS
44,986.42
52,263.80
-7,277.38
116.18
WATER
8,630.85
15,484.57
-6,853.72
179.41
TOTALS:
$19,473,022.82
$19,260,076.73
$212,946.09
Original Beginning Balance Totals
Type Count Gross Assessment
REAL ESTATE 2,499
REAL ESTATE C
85
First Installment
Second Installment
Total Tax
502,774,410
Exemptions Net Assessment
3,530,850
499,243,560
7,524,424.92
7,524,009.50
15,048,434.42
11,412,530
301,830
11,110,700
125,568.87
125,492.63
251,061.50
REAL ESTATE X
89
44,488,160
44,488,160
0
0.00
0.00
0.00
PERSONAL
PROPERTY
279
47,868,235
11,338,451
36,529,784
558,944.39
553,753.60
1,112,697.99
MOTOR 6,134
VEHICLE
66,657,737
213,510
66,444,227
2,013,081.97
0.00
2,013,081.97
MOTOR 1,219
SUPPLEMENTAL
19,164,320
7,557
19,156,763
266,557.85
0.00
266,557.85
0
0
40,974.93
0.00
40,974.93
SEWER
ASSESSMENT
249
0
WATER
179
0
0
0
10,568.66
0.00
10,568.66
MELBOURNE
TRUST N
1
0
0
0
0.00
0.00
0.00
TOTALS: 10,734
692,365,392
59,880,358
632,485,034
10,540,121.59
8,203,255.73
18,743,377.32
Exemptions Net Assessment
Total Tax
Waived Amount
0.00
0.00
Waived Bills
Type Count Gross Assessment
TOTALS:
0
0
0
0
Summary of Cash Collections - Year to Date
Type
Taxes
Bond Int
Interest
Lien
Fees
Total
REAL ESTATE
15,962,486.74
0.00
28,723.90
72.00
112.00
15,991,394.64
PERSONAL PROPERTY
1,109,637.26
0.00
2,331.16
0.00
0.00
1,111,968.42
MOTOR VEHICLE
1,892,290.61
0.00
26,146.78
0.00
80.00
1,918,517.39
MOTOR SUPPLEMENTAL
227,913.75
0.00
2,678.14
0.00
0.00
230,591.89
SEWER ASSESSMENT
1,204.57
504.74
230.28
0.00
0.00
1,939.59
WATER
1,604.66
109.66
32.30
24.00
0.00
1,770.62
MELBOURNE TRUST
1,056.97
0.00
0.00
0.00
0.00
1,056.97
TOTALS:
19,196,194.56
614.40
60,142.56
96.00
192.00
19,257,239.52
Summary of Cash Collections - Monthly for June 2026
Type
Taxes
Bond Int
Interest
Lien
Fees
Total
REAL ESTATE
12,131.71
0.00
1,802.81
72.00
6.00
14,012.52
MOTOR VEHICLE
14,337.61
0.00
2,518.63
0.00
0.00
16,856.24
MOTOR SUPPLEMENTAL
2,804.19
0.00
253.73
0.00
0.00
3,057.92
TOTALS:
29,273.51
0.00
4,575.17
72.00
6.00
33,926.68
END OF MONTH BALANCING
June 2026
Last Months Uncollected Tax on GRBBS-
$
576,685.47
Subtract TAX collected on CASH REPORT for Month
$
46,915.80
Subtotal
Add in Bounced Checks (Tax Column only)
$
529,769.67
$ 0
Subtotal-
$
529,769.67
$
+2,618.14
$
532,387.67
Adjustments-Add if net is increase
$
-2,403.69
-Subtract if net is Decrease
$
Reversed Refunds (Tax Column only)
Subtotal-
SubtotalTransfers-Add if tax amount is negative
-Subtract if positive
Subtotal-
Suspense
$
529,984.12
$
+85.08
$ 530,069.20
$
SubtotalCurrent Uncollected Month Tax on GRBBS-
$ 516,821.63
$
Difference
-13,247.57
($0)
516,821.63
Town of Beacon Falls
Economic Development Commission
Date 03/23/26
10 Maple Avenue
Beacon Falls, CT 06403
C/O Town Clerk
(Subject to Revision)
Members Present: Jack Betkoski (JB), Edward Mulvihill (EM), Josepha McGeever Bruznicki (JMB),
Robert Desrochers (RD), Edward Korzon (EK), Dennis Phipps (DP) and Victor Lembo (VL).
Others Present: Michael Krenesky (MK).
1. Call to Order /Pledge of Allegiance: The meeting was called to order at 6:30 p.m. by JB preceded by
the Pledge of Allegiance.
2. Approval of Minutes EK made a motion to approve the minutes, seconded by EM. Approved, all ayes.
3. Correspondence-None.
4. Old Business
JMB spoke about the update on the Rimmon School House with Phase One of the rehabilitation of the
exterior structure including the outside and the roof, to stabilize and keep the building safe. Phase Two will
be the interior. Phase One has moved through the Selectman’s office, Board of Finance, with additional
funds from Parks and Rec. DiGiorgi will be doing the rehabilitation of the schoolhouse. At present there is a
goal for the schoolhouse dedication at 12 p.m. July 11th as part of Family Day and the America 250
Celebration. EK asked about investigation of materials and if there would be a flagpole. JMB mentioned
that it is something to discuss and to be explored prior to final purchase with future goals including a
flagpole with a solar light, and the schoolhouse being surrounded by the town bricks and landscaping.
a. Main Street Update
• New flags on Main Street, prior to Memorial Day for the July 11th
America 250 Celebration.
• JB asked for updates on Train Station-MK as far as he knows Spring.
• MK informed the Board that Aquarion putting in new water lines in the
Spring.
• Plan around June 27th Parade and Carnival.
• Speed Camera’s.
• Flashing lights on businesses on Main Street-compliance.
b. Coordinator Update
JB received a report from Emily Fitzgerald, she was unable to attend the monthly meeting. Report
highlights include, but are not limited to:
•
•
•
Update on business signs and continuing business outreach and interviews.
Sign structure options to be considered.
Next steps are determining the number of businesses participating which will impact overall
pricing and design choice.
Meeting Minutes –Economic Development Commission
Clerked by Erin K. Moffat
Meeting Date: 03/23/26
1|Pag e
Town of Beacon Falls
Economic Development Commission
Date 03/23/26
10 Maple Avenue
Beacon Falls, CT 06403
C/O Town Clerk
(Subject to Revision)
•
•
•
•
Patio Paradise has moved-discussed a new ribbon cutting at new location, potentially next
month.
Completed business features.
Meetings scheduled with website developers to review their pricing.
Main Street Sip and Stroll.
c. Haynes Development-Discussion
•
•
JB will ask a representative from Haynes to attend the next meeting to get an update.
MK relayed that Haynes met with the State regarding the Train Station and neither the Beacon
Falls nor Seymour trains will be moved or decommissioned. However, if they’d like to build a
train station, an extra stop on train routes could be added to accommodate that.
d. Signage
•
•
Discussion around the signage specification for Main Street Businesses and Industrial Park.
JB asked MK about banners, and he stated as of right now the plan is to put one on the Depot
Street Bridge and others TBD.
5. New Business
• Grant News
a. JB mentioned that Beacon Falls was in the CAPA report-JMB stated that the existing
O & G plant was reviewed and was given some publicity in a feature article. MK noted it
was in a Yale report.
b. JB-There was a meeting of the Regional Enterprise Corridor Zone which provides towns
with tax credits toward expansion.
•
Economic Development Commission Plan of Action
a. Remainder of Fiscal Year
b. Fiscal Year July 1, 2026-June 30, 2027
Continued discussion of the goals and objectives of the Beacon Falls-EDC for Fiscal Year 2026-2027.
6. Announcements
• MK mentioned that the town was approached regarding the potential of the future of
Affordable Housing and recommended locations.
• MK-75 Pent Road has been approved by Planning and Zoning, with documentation regarding
egress and ingress off Lancaster Drive.
Meeting Minutes –Economic Development Commission
Clerked by Erin K. Moffat
Meeting Date: 03/23/26
2|Pag e
Town of Beacon Falls
Economic Development Commission
Date 03/23/26
10 Maple Avenue
Beacon Falls, CT 06403
C/O Town Clerk
(Subject to Revision)
7. Adjournment
EK made a motion to adjourn the meeting at 7:10 p.m. seconded by VL. Approved, all ayes.
Respectfully submitted,
Erin K. Moffat
Erin K. Moffat
Clerk, EDC
Meeting Minutes –Economic Development Commission
Clerked by Erin K. Moffat
Meeting Date: 03/23/26
3|Pag e
Town of Beacon Falls
Economic Development Commission
Date 04/27/26
10 Maple Avenue
Beacon Falls, CT 06403
C/O Town Clerk
(Subject to Revision)
Members Present: Jack Betkoski (JB), Josepha McGeever Bruznicki (JMB), Edward Korzon (EK), Robert
Desrochers (RD) and Victor Lembo (VL).
Others Present: Gerard Smith (GS), Michael Krenesky (MK), Emily Fitzgerald (EF) and Molly DeLong
(MD).
Not Present: Edward Mulvihill (EM) and Dennis Phipps (DP).
1. Call to Order /Pledge of Allegiance: The meeting was called to order at 6:30 p.m.by JB preceded by
the Pledge of Allegiance.
2. Approval of Minutes JMB made a motion to approve the minutes, seconded by EK. Approved, all
ayes.
3. Correspondence- JB received an email from Rick Dunne that he will be unable to attend the meeting.
4. Old Business
5. New Business
• Presentation by guest speaker, Rick Dunne, Executive Director of NVCOG CT to be
rescheduled for a later date tbd.
Open Floor Discussion
•
•
•
•
•
•
•
MK informed the board that the town has been notified that they have been awarded a 15
million dollar plus LoCIP grant through the COG, pending approval from the state.
Water company road work, water main and repaving of Main Street after work is complete.
Potential plans for the future of Main Street.
Commerce Park signage and potential landscaping adjustments.
Main Street Sip and Stroll will be Saturday, September 12, 2026, at 2 p.m.
MD-owner of Molly’s Bakery discussed the growth and current operational rhythm of her
business.
JMB update on Schoolhouse for 250 celebration.
▪ July 11th Family Day dedication.
▪ DiGiorgi Contract for rehabilitation of the exterior, with a new roof and shingles.
▪ The interior will include a sub floor.
▪ Phase 2-to preserve interior to replicate the original schoolhouse.
▪ In its current location it is on the Connecticut Historical List.
▪ Funding and fundraising.
Meeting Minutes –Economic Development Commission
Clerked by Erin K. Moffat
Meeting Date: 04/27/26
1|Pag e
Town of Beacon Falls
Economic Development Commission
Date 04/27/26
10 Maple Avenue
Beacon Falls, CT 06403
C/O Town Clerk
(Subject to Revision)
•
•
•
GS discussed pending approval of Main Street/Downtown Grant
▪ Engineering, development and final design.
▪ Business, new buildings and shops.
▪ Roadways.
▪ Diagonal Parking as required by the state.
▪ Extension of streetscape.
▪ Promenade.
▪ Professional planners.
Main Street Camera’s
▪ Down less than 50%.
EF Report
o Expanding Social Media presence.
o Upcoming business spotlight on UDS.
o JMB asked if there would be a spotlight on Catherine Velez, owner of My Way flower truck
after attending a Real Estate Open House on Oakwood Drive.
6. Announcements-None.
7. Adjournment
VL made a motion to adjourn the meeting at 7:20 p.m. seconded by EK. Approved, all ayes.
Respectfully submitted,
Erin K. Moffat
Erin K. Moffat
Clerk, EDC
Meeting Minutes –Economic Development Commission
Clerked by Erin K. Moffat
Meeting Date: 04/27/26
2|Pag e
Town of Beacon Falls
Economic Development Commission
Date 06/22/26
10 Maple Avenue
Beacon Falls, CT 06403
C/O Town Clerk
(Subject to Revision)
Members’ Present: Jack Betkoski (JB), Edward Mulvihill (EM), Josepha McGeever Bruznicki (JMB),
Edward Korzon (EK) and Victor Lembo (VL).
Not Present: Dennis Phipps (DP) and Robert Desrochers (RD).
Others Present: Emily Fitzgerald (EF) and Michael Krenesky (MK).
1. Call to Order /Pledge of Allegiance: The meeting was called to order at 6:37 p.m. by JB preceded by
the Pledge of Allegiance.
2. Approval of Minutes JMB made a motion to approve the minutes, seconded by EK. Approved, all
ayes.
3. Correspondence- None.
4. Old Business
•
•
•
Main Street Update
o Signs on Main Street.
o Enforcement of ordinances for businesses.
o JB will draft a letter to local businesses outlining and clarifying ordinances to confirm
compliance.
Coordinator Update
o Sip and Stroll scheduled for September 12th
▪ EF designed a flyer to distribute.
▪ Seeking local businesses to participate and/or set up booths.
▪ Parking options.
▪ Space for additional vendor booths.
▪ Once there is an official list of businesses, a map will be created, and attendees will
receive a passport, and each individual business will provide a stamp for the passport
when their business is visited.
o Plaques-EF confirmed with the board to order 40 plaques.
Haynes Development-Discussion
o General forecasting of ideas.
o Potential layout, design and location in comparison to Quarry Walk.
o Thoughts regarding upkeep as far as landscaping and available and accessible parking.
o Suggestions for unique and sustainable business options.
Meeting Minutes –Economic Development Commission
Clerked by Erin K. Moffat
Meeting Date: 06/22/26
1|Pag e
Town of Beacon Falls
Economic Development Commission
Date 06/22/26
10 Maple Avenue
Beacon Falls, CT 06403
C/O Town Clerk
(Subject to Revision)
5. New Business
•
Renovations of schoolhouse-Update
o Lead and Asbestos review
▪ They found no asbestos.
▪ Lead content-only specific areas on not extensive.
▪ Wood Floor does not contain lead.
o Greenlight to start the project.
o No official start date.
o Committee designed a logo which was approved.
o JMB donated a sign-sign will be erected as “Rehabilitation Project-Town of Beacon FallsRimmon School House.”
o In lieu of July 11th dedication there will be a “commencing of the project.”
6. Announcements-None.
7. Adjournment
EM made a motion to adjourn the meeting at 7:33 p.m. seconded by EK. Approved, all ayes.
Respectfully submitted,
Erin K. Moffat
Erin K. Moffat
Clerk, EDC
Meeting Minutes –Economic Development Commission
Clerked by Erin K. Moffat
Meeting Date: 06/22/26
2|Pag e
Beacon Falls Police Department
119 North Main Street
Beacon Falls, CT 06403
(203) 729-3313 Fax (203) 723-8768
Beaconfalls-ct.org/police-department
MEMORANDUM
TO: The Board of Selectmen
FROM: Corporal Jason Piccirillo
DATE: June 5, 2026
SUBJECT: ATESD Speed Enforcement Program: S. Main St. Results & Proposed Expansion
1. Purpose
This memorandum reviews the performance of our Automated Traffic Enforcement Safety Device (ATESD)
pilot program at 201 S. Main Street and proposes expanding the system to two additional trouble areas: Beacon
Valley Road and Munson Road. Recent speed studies show that both locations experience chronic, high-risk
speeding that requires structured enforcement to ensure public safety.
2. Pilot Program Performance (201 S. Main St.)
The bi-directional speed camera at 201 S. Main Street became operational with a warning period on December
25, 2025, and began issuing live citations on January 24, 2026. A review of the traffic data from November
2025 (pre-program) to April 2026 demonstrates that the system has successfully changed driver behavior:
• Increased Compliance: Drivers obeying the 40 Mph speed limit rose from under 10.0% to over 75.0%.
• Reduced Average Speeds: The 85th percentile speed decreased by nearly 20%, dropping from 53 Mph
down to 43 Mph.
• Eradication of Reckless Speeding: Drivers traveling at extreme speeds (21 Mph or more over the
limit) fell by over 97%. Northbound extreme violations dropped from 2,500 to 33 per month, while
Southbound violations dropped from 4,380 to 94.
3. Traffic Data Analysis for Proposed Expansion Sites
To address ongoing safety complaints from residents, a three-day speed study was conducted from March 23 to
March 25, 2026. The data confirms that standard enforcement and passive signs are not effectively controlling
speeds in these zones:
A. Beacon Valley Road Corridor (25 Mph Speed Limit)
Traffic was monitored on both sides of Beacon Hill Common, revealing widespread non-compliance:
• Westbound (East of Beacon Hill Common): Out of 50,780 monthly vehicles, 97.2% exceed the speed
limit. The 85th percentile speed is 42 Mph, with over 3,400 vehicles per month traveling at a dangerous
46+ Mph.
• Eastbound (West of Beacon Hill Common): Out of 60,590 monthly vehicles, 97.4% exceed the speed
limit. The 85th percentile speed is 43 Mph. More than 68% of all traffic travels at 36 Mph or faster, and
over 5,600 vehicles exceed 46+ Mph in this residential area
.
B. Munson Road Corridor (30 Mph Speed Limit)
Traffic was monitored south of Pamanata Meadows, showing significant speeding issues, particularly heading
southbound downhill:
• Northbound: Records 37,570 vehicles monthly with an 85th percentile speed of 43 Mph. Over 90% of
drivers exceed the 30 Mph limit , resulting in 11,010 monthly citable events.
Beacon Falls Police Department
119 North Main Street
Beacon Falls, CT 06403
(203) 729-3313 Fax (203) 723-8768
Beaconfalls-ct.org/police-department
•
Southbound: Out of 40,180 monthly vehicles, the 85th percentile speed reaches 46 Mph. Over half of
all traffic (53.0%) travels at 41 Mph or faster, creating 21,280 citable violations per month.
Additionally, nearly 1,700 drivers a month exceed 51+ Mph.
4. Recommendation and Next Steps
The data indicates that the current speed limits on Beacon Valley Road and Munson Road are systematically
ignored, creating an unacceptable safety risk for local neighborhoods.
Based on the proven success of our pilot location, I recommend that the Board of Selectmen approve expanding
the ATESD program to include the following four enforcement sites:
1. Beacon Valley Road (Westbound, east of Beacon Hill Common)
2. Beacon Valley Road (Eastbound, west of Beacon Hill Common)
3. Munson Road (Northbound, south of Pamanata Meadows)
4. Munson Road (Southbound, south of Pamanata Meadows)
Following the blueprint established on S. Main Street, we will implement a mandatory 30-day public notice and
warning period before issuing live citations. This ensures transparency with the community while effectively
improving the safety of our roadways.
Respectfully Submitted,
Corporal Jason Piccirillo
Town of Beacon Falls Police Department
EXTERNAL EMAIL - This email was sent by a person from outside your organization.
From:
Laura DeGeorge
To:
Lauren Fennell
Subject:
Park and Recreation commission
Sent:
6/23/2026 8:59:09 AM
Good morning Lauren,
I am requesting to do another term on the P&R commission.
I would like to continue to work with the other board members, for the town of Beacon Falls.
Thank you, Laura DeGeorge
From:
Gerard F. Smith
To:
Cc:
Lauren Fennell
Subject:
Re: Parks & Recreation Appointment Request
Sent:
6/17/2026 7:06:09 PM
Got it
Gerard F. Smith
First Selectman
Town of Beacon Falls
10 Maple Avenue
Beacon Falls, CT 06403
203-909-0612
[email protected]
On Jun 17, 2026, at 6:19 PM, Peter Monti <[email protected]> wrote:
EXTERNAL EMAIL - This email was sent by a person from outside your organization.
Good evening First Selectman Smith
I am writing to you regarding my current term which expires next month. I would like to continue to serv on
this commission and request consideration for reappointment for another term.
Sincerely,
Peter Monti
Sent from AT&T Yahoo Mail on Android
From:
Gerard F. Smith
To:
walshcara; Michael Krenesky;
Cc:
Woodland Valley; Lauren Fennell; Peter Betkoski; Rob Pruzinsky; [email protected];
Subject:
RE: Town support
Sent:
6/9/2026 1:00:47 PM
Carl,
Thank you for letting us know our team provided the service we all expect.
Victor and the public works team are excellent representatives for the town of Beacon Falls.
I will be sure to share your comments publicly at the next BOS meeting.
Thanks,
Gerry
Gerard F. Smith
First Selectman
Town of Beacon Falls
10 Maple Avenue
Beacon Falls, CT 06403
W. 203-729-4340
C. 203-909-0612
From: walshcara <[email protected]>
Sent: Tuesday, June 9, 2026 6:18 AM
To: Gerard F. Smith <[email protected]>; Michael Krenesky <[email protected]>
Cc: Woodland Valley <[email protected]>
Subject: Town support
EXTERNAL EMAIL - This email was sent by a person from outside your organization.
Good morning,
My name is Cara Fortier, and I wanted to take a moment to recognize and thank Victor Santos of the Parks and
Recreation Board for the outstanding support he provided to the Woodland Valley Softball Recreation teams this season.
At the beginning of the season, we faced some challenges regarding field access and scheduling due to the significant
amount of time being allocated to a travel team (unknown to him at the time). I know I was persistent in voicing our
concerns, and Victor stepped up to help address those issues. His willingness to listen, and find solutions made a
tremendous difference for our league.
On behalf of the entire Woodland Valley Softball board, I want to express our sincere appreciation for his efforts. The
girls had a wonderful season, and we truly could not have done it without his support and dedication.
I would also like to thank the Parks and Recreation staff who worked diligently to prepare the fields and facilities before
each game. Their hard work provided a positive experience for the players and it did not go unnoticed.
Together their dedication, and willingness to work with us under significant pressure helped make this season a success.
We are truly thankful for all they did for our players, families, and league.
Thank you for taking the time to share our appreciation.
Sincerely,
Cara Fortier, Vice President.
AUTHORIZING RESOLUTION OF THE
Beacon Falls Board of Selectmen
CERTIFICATION:
I, Denise Hendricks, the Town Clerk of the Town of Beacon Falls, do hereby certify that
the following is a true and correct copy of a resolution adopted by Beacon Falls Board of
Selectmen at its duly called and held meeting on July 13, 2026, at which a quorum was present
and acting throughout, and that the resolution has not been modified, rescinded, or revoked and
is at present in full force and effect:
RESOLVED, that the Beacon Falls Board of Selectmen may enter into with and deliver
to the State of Connecticut Department of Emergency Services and Public Protection,
Division of Emergency Management and Homeland Security any and all documents
which it deems to be necessary or appropriate in relation to the 2025 EMPG grant; and
FURTHER RESOLVED, that Gerard Smith, as First Selectman of Beacon Falls Board of
Selectmen, is authorized and directed to execute and deliver any and all documents on
behalf of the Beacon Falls Board of Selectmen and to do and perform all acts and things
which he deems to be necessary or appropriate to carry out the terms of such documents,
including, but not limited to, executing and delivering all agreements and documents
contemplated by such documents.
The undersigned further certifies that Gerard Smith now holds the office of First
Selectman and that he has held that office since November 18, 2019.
IN WITNESS WHEREOF: The undersigned has executed this certificate this
2026.
Denise Hendricks, Town Clerk
PLACE
SEAL HERE
(or “L.S.” if
no seal
day of July
AUTHORIZING RESOLUTION OF THE
Beacon Falls Board of Selectmen
CERTIFICATION:
I, Denise Hendricks, the Town Clerk of the Town of Beacon Falls, do hereby certify that
the following is a true and correct copy of a resolution adopted by Beacon Falls Board of
Selectmen at its duly called and held meeting on July 13, 2026, at which a quorum was present
and acting throughout, and that the resolution has not been modified, rescinded, or revoked and
is at present in full force and effect:
RESOLVED, that the Beacon Falls Board of Selectmen may enter into with and deliver
to the State of Connecticut Department of Emergency Services and Public Protection,
Division of Emergency Management and Homeland Security any and all documents
which it deems to be necessary or appropriate in relation to the 2026 EMPG grant; and
FURTHER RESOLVED, that Gerard Smith, as First Selectman of Beacon Falls Board of
Selectmen, is authorized and directed to execute and deliver any and all documents on
behalf of the Beacon Falls Board of Selectmen and to do and perform all acts and things
which he deems to be necessary or appropriate to carry out the terms of such documents,
including, but not limited to, executing and delivering all agreements and documents
contemplated by such documents.
The undersigned further certifies that Gerard Smith now holds the office of First
Selectman and that he has held that office since November 18, 2019.
IN WITNESS WHEREOF: The undersigned has executed this certificate this
2026.
Denise Hendricks, Town Clerk
PLACE
SEAL HERE
(or “L.S.” if
no seal
day of July
TOWN OF BEACON FALLS
ITB 26-2: Rehabilita on of Maple Avenue, Century Avenue, and Division Street
Bid Tabulation - Posted 3:30pm 7/2/26
Disclaimer: This bid tabulation posting is not a guarantee of award. Grading will now commence and award is anticipated for 7/13/26
#
Items
UnitofMeasure
Asphalt Repair
Solutions Inc.
Total Cost
$ 2,040,859.0
Quan tyRequired UnitPrice TotalCost
#0-1
#0-2
#0-3
#0-4
#0-5
#0-6
#0-7
#0-8
#0-9
#0-10
#0-11
#0-12
#0-13
#0-14
#0-15
#0-16
#0-17
#0-18
#0-19
#0-20
#0-21
#0-22
#0-23
#0-24
#0-25
#0-26
#0-27
#0-28
#0-29
#0-30
#0-31
#0-32
#0-33
#0-34
#0-35
#0-36
#0-37
#0-38
#0-39
#0-40
#0-41
#0-42
#0-43
#0-44
#0-45
0201001A: Clearing and Grubbing (+/-2%)
0202000: Earth Excavation
0202529: Cut Bituminous Concrete Pavement
0205004: Rock in Trench Excavation - 0’-10’ Deep
0209001: Formation of Subgrade
0212000: Subbase
02190011A: Sedimentation Control System at Catch Basin
0304002: Processed Aggregate Base
0406005A: Temporary Pavement Repair
0406006A: Permanent Pavement Repair
0406170: HMA S1
0406172: HMA S0.375
0406236: Material For Tack Coat
0406999A - Asphalt Adjustment Cost (PREDETERMINED - enter $2,000)
0409001: Fine Milling of Bituminous Concrete (0” to 4”)
05070988A: Area Drain
0586001.10: Type "C" Catch Basin - 0'-10" Deep
0586500.10: Manhole with Drain Gate (0'-10' Deep)
0586651: Reset Manhole (Storm)
0586790.10: Remove Drainage Structure (0'-10" Deep)
0686000.15: 15” R.C. Pipe (0'-10' Deep)
0686950.10: Remove Existing Pipe - 0'10' Deep
0811001: Concrete Curbing
0921001: Concrete Sidewalk
0921003A: Integral Concrete Sidewalk with Concrete Curbing
0921005: Concrete Sidewalk Ramp
0921048: Detectable Warning Surface
0922501: Bituminous Concrete Driveway
0924006 Concrete Driveway Ramp
0944003: Furnishing and Placing Topsoil
0950019A: Turf Establishment – Lawn
0971001A: Maintenance & Protection of Traffic
0975004: Mobilization and Project Closeout
0980020: Construction Surveying
1208931: Sign Face-Sheet Aluminum (Type IX Retroreflective Sheeting)
1210101: 4" White Epoxy Resin Pavement Markings
1210102: 4" Yellow Epoxy Resin Pavement Markings
1210105: Epoxy Resin Pavement Markings, Symbols, and Legends
1302051A: Reset Valve Box (Water Main)
1400102: 8” Polyvinyl Chloride Laterals (Sanitary Sewer)
1403001A: Sanitary Manhole (0'-10' Deep)
1403002A: Sanitary Manhole (10'-20' Deep)
1403010A: Manhole Frame and Cover (Sanitary Sewer)
1408455A: Temporary Bypass (Sanitary Sewer)
1700001A: Service Connections (Estimated Cost)
Lump Sum (LS)
Cubic Yard (CY)
Linear Feet (LF)
Cubic Yard (CY)
Square Yard (SY)
Cubic Yard (CY)
Each (EA)
CY
SY
SY
Ton (TN)
Ton (TN)
Gallon (GAL)
Predetermined
Square Yard (SY)
Linear Feet (LF)
Each (EA)
Each (EA)
Each (EA)
Each (EA)
Linear Feet (LF)
Linear Feet (LF)
Linear Feet (LF)
Square Yard (SY)
Square Feet (SF)
Square Feet (SF)
Square Feet (SF)
Square Yard (SY)
Square Feet (SF)
Square Yard (SY)
Square Yard (SY)
Lump Sum (LS)
Lump Sum (LS)
Lump Sum (LS)
Square Feet (SF)
Linear Feet (LF)
Linear Feet( LF)
Square Feet (SF)
Each (EA)
Linear Feet (LF)
Each (EA)
Each (EA)
Each (EA)
Lump Sum (LS)
Lump Sum (LS)
1
3220
350
20
3500
1270
14
1210
810
120
600
500
440
1
830
60
11
1
1
3
1060
110
680
680
5500
1860
100
70
390
540
540
1
1
1
150
1520
2140
640
20
1210
4
2
1
1
1
$ 11,000.0
$ 30
$2
$ 250
$ 1.65
$ 55
$ 150
$ 55
$ 30
$ 52
$ 140
$ 145
$ 10
$ 2,000.0
$ 10
$ 324.5
$ 14,520.0
$ 26,015.0
$ 5,390.0
$ 10,450.0
$ 209
$ 286
$ 59
$ 22.5
$ 34.5
$ 36
$ 56
$ 32
$ 31
$ 12
$ 2.25
$ 55,000.0
$ 50,000.0
$ 20,000.0
$ 48
$ 0.65
$ 0.65
$8
$ 160
$ 379.5
$ 8,525.0
$ 17,490.0
$ 5,060.0
$ 60,610.0
$ 10,000.0
$ 11,000.0
$ 96,600.0
$ 700
$ 5,000.0
$ 5,775.0
$ 69,850.0
$ 2,100.0
$ 66,550.0
$ 24,300.0
$ 6,240.0
$ 84,000.0
$ 72,500.0
$ 4,400.0
$ 2,000.0
$ 8,300.0
$ 19,470.0
$ 159,720.0
$ 26,015.0
$ 5,390.0
$ 31,350.0
$ 221,540.0
$ 31,460.0
$ 40,120.0
$ 15,300.0
$ 189,750.0
$ 66,960.0
$ 5,600.0
$ 2,240.0
$ 12,090.0
$ 6,480.0
$ 1,215.0
$ 55,000.0
$ 50,000.0
$ 20,000.0
$ 7,200.0
$ 988.0
$ 1,391.0
$ 5,120.0
$ 3,200.0
$ 459,195.0
$ 34,100.0
$ 34,980.0
$ 5,060.0
$ 60,610.0
$ 10,000.0
B&W Paving &
Landscaping, LLC
$ 1,404,265.5
UnitPrice TotalCost
C.J. Fucci, Inc.
$ 1,775,500.0
UnitPrice
TotalCost
Dayton Construction
Company, Inc.
$ 1,441,460.0
UnitPrice
TotalCost
EARTHWORKS
EXCAVATING AND
LANDSCAPING INC.
$ 1,199,589.0
UnitPrice TotalCost
Grasso Companies
$ 1,347,260.0
UnitPrice TotalCost
Guerrera Construction
Co Inc
$ 1,721,582.0
UnitPrice
TotalCost
J. Iapaluccio Inc.
$ 1,500,774.0
UnitPrice TotalCost
M. Rondano Inc.
$ 1,153,767.5
UnitPrice TotalCost
Richards Corporation
$1,536,180.00
UnitPrice
TotalCost
$ 15,000.0
$ 40
$8
$ 200
$ 1.5
$ 60
$ 125
$ 60
$ 60
$ 91.5
$ 131.6
$ 140
$ 9.25
$ 2,000.0
$ 19.25
$ 125
$ 4,800.0
$ 4,600.0
$ 1,700.0
$ 1,200.0
$ 105
$ 11
$ 40
$ 22
$ 24
$ 28
$ 40
$ 140
$ 28
$ 11
$3
$ 25,000.0
$ 54,000.0
$ 15,000.0
$ 85
$ 0.8
$ 0.8
$3
$ 350
$ 145
$ 6,500.0
$ 9,500.0
$ 2,000.0
$ 75,000.0
$ 10,000.0
$ 35,000.0 $ 35,000.0
$ 35
$ 112,700.0
$5
$ 1,750.0
$ 260
$ 5,200.0
$ 1.5
$ 5,250.0
$ 45
$ 57,150.0
$ 150
$ 2,100.0
$ 50
$ 60,500.0
$ 36
$ 29,160.0
$ 125
$ 15,000.0
$ 132
$ 79,200.0
$ 140
$ 70,000.0
$ 10
$ 4,400.0
$ 2,000.0
$ 2,000.0
$ 19.5
$ 16,185.0
$ 115
$ 6,900.0
$ 8,000.0
$ 88,000.0
$ 8,500.0
$ 8,500.0
$ 1,700.0
$ 1,700.0
$ 585
$ 1,755.0
$ 98
$ 103,880.0
$ 10.5
$ 1,155.0
$ 55
$ 37,400.0
$ 18
$ 12,240.0
$ 22
$ 121,000.0
$ 32
$ 59,520.0
$ 65
$ 6,500.0
$ 126
$ 8,820.0
$ 30
$ 11,700.0
$ 16
$ 8,640.0
$ 3.5
$ 1,890.0
$ 410,000.0 $ 410,000.0
$ 93,895.0 $ 93,895.0
$ 25,000.0 $ 25,000.0
$ 70
$ 10,500.0
$ 0.5
$ 760.0
$ 0.5
$ 1,070.0
$ 5.5
$ 3,520.0
$ 175
$ 3,500.0
$ 111
$ 134,310.0
$ 10,750.0 $ 43,000.0
$ 12,000.0 $ 24,000.0
$ 750
$ 750
$ 40,000.0 $ 40,000.0
$ 10,000.0 $ 10,000.0
$ 12,000.0 $ 12,000.0
$ 25
$ 80,500.0
$ 10
$ 3,500.0
$ 300
$ 6,000.0
$5
$ 17,500.0
$ 50
$ 63,500.0
$ 100
$ 1,400.0
$ 55
$ 66,550.0
$ 50
$ 40,500.0
$ 115
$ 13,800.0
$ 150
$ 90,000.0
$ 165
$ 82,500.0
$5
$ 2,200.0
$ 2,000.0
$ 2,000.0
$ 20
$ 16,600.0
$ 75
$ 4,500.0
$ 5,000.0
$ 55,000.0
$ 8,000.0
$ 8,000.0
$ 2,500.0
$ 2,500.0
$ 1,000.0
$ 3,000.0
$ 115
$ 121,900.0
$ 35
$ 3,850.0
$ 85
$ 57,800.0
$ 30
$ 20,400.0
$ 30
$ 165,000.0
$ 30
$ 55,800.0
$ 40
$ 4,000.0
$ 225
$ 15,750.0
$ 35
$ 13,650.0
$ 25
$ 13,500.0
$5
$ 2,700.0
$ 32,500.0 $ 32,500.0
$ 115,000.0 $ 115,000.0
$ 20,500.0 $ 20,500.0
$ 70
$ 10,500.0
$1
$ 1,520.0
$1
$ 2,140.0
$ 7.5
$ 4,800.0
$ 500
$ 10,000.0
$ 110
$ 133,100.0
$ 4,500.0
$ 18,000.0
$ 5,500.0
$ 11,000.0
$ 1,500.0
$ 1,500.0
$ 25,000.0 $ 25,000.0
$ 10,000.0 $ 10,000.0
$ 30,000.0
$ 24
$7
$ 85
$8
$ 55
$ 200
$ 56
$ 58
$ 120
$ 140
$ 148
$8
$ 2,000.0
$ 20
$ 98
$ 4,400.0
$ 5,550.0
$ 1,600.0
$ 2,500.0
$ 94
$ 50
$ 32
$ 12.5
$ 15
$ 18
$ 39.5
$ 90
$ 18
$ 12
$ 2.5
$ 20,000.0
$ 25,477.0
$ 8,000.0
$ 85
$ 1.2
$ 1.2
$ 7.5
$ 400
$ 112
$ 9,150.0
$ 18,000.0
$ 1,300.0
$ 30,000.0
$ 10,000.0
$ 40,000.0
$ 24
$4
$ 220
$4
$ 64
$ 250
$ 64
$ 30
$ 80
$ 150
$ 158
$1
$ 2,000.0
$ 10
$ 125
$ 6,250.0
$ 6,500.0
$ 1,200.0
$ 1,500.0
$ 110
$ 30
$ 50
$ 17
$ 20
$ 25
$ 30
$ 70
$ 28
$ 10
$7
$ 50,000.0
$ 60,000.0
$ 21,000.0
$ 110
$1
$1
$ 10
$ 200
$ 135
$ 6,500.0
$ 8,500.0
$ 2,000.0
$ 16,000.0
$ 10,000.0
$ 25,000.0 $ 25,000.0
$ 40
$ 128,800.0
$3
$ 1,050.0
$ 250
$ 5,000.0
$4
$ 14,000.0
$ 45
$ 57,150.0
$ 150
$ 2,100.0
$ 47
$ 56,870.0
$ 75
$ 60,750.0
$ 115
$ 13,800.0
$ 180
$ 108,000.0
$ 180
$ 90,000.0
$8
$ 3,520.0
$ 2,000.0
$ 2,000.0
$ 24
$ 19,920.0
$ 165
$ 9,900.0
$ 7,500.0
$ 82,500.0
$ 8,500.0
$ 8,500.0
$ 1,000.0
$ 1,000.0
$ 1,500.0
$ 4,500.0
$ 110
$ 116,600.0
$ 58
$ 6,380.0
$ 47
$ 31,960.0
$ 16
$ 10,880.0
$ 22
$ 121,000.0
$ 33
$ 61,380.0
$ 34
$ 3,400.0
$ 75
$ 5,250.0
$ 22
$ 8,580.0
$ 19
$ 10,260.0
$5
$ 2,700.0
$ 50,000.0 $ 50,000.0
$ 170,000.0 $ 170,000.0
$ 25,000.0 $ 25,000.0
$ 100
$ 15,000.0
$ 1.2
$ 1,824.0
$ 1.2
$ 2,568.0
$ 11
$ 7,040.0
$ 900
$ 18,000.0
$ 120
$ 145,200.0
$ 8,500.0
$ 34,000.0
$ 11,500.0 $ 23,000.0
$ 2,200.0
$ 2,200.0
$ 145,000.0 $ 145,000.0
$ 10,000.0 $ 10,000.0
$ 32,500.0
$ 30
$ 7.5
$ 400
$1
$ 56
$ 200
$ 71
$ 74
$ 162
$ 132
$ 150
$ 13
$ 2,000.0
$ 23
$ 210
$ 6,100.0
$ 6,000.0
$ 800
$ 2,650.0
$ 69
$ 22
$ 63
$ 22
$ 25
$ 26
$ 28
$ 125
$ 38
$ 23
$5
$ 27,500.0
$ 58,000.0
$ 32,500.0
$ 76
$ 0.65
$ 0.65
$8
$ 500
$ 195
$ 8,200.0
$ 11,500.0
$ 1,520.0
$ 32,000.0
$ 10,000.0
$ 40,000.0
$ 15
$3
$ 175
$8
$ 31
$ 150
$ 31
$ 35
$ 95
$ 140
$ 147
$ 11
$ 2,000.0
$ 21
$ 130
$ 4,100.0
$ 5,000.0
$ 950
$ 1,200.0
$ 111
$ 45
$ 45
$ 16.5
$ 22
$ 25
$ 35
$ 65
$ 19.25
$8
$ 2.5
$ 20,000.0
$ 45,000.0
$ 15,000.0
$ 80
$1
$1
$8
$ 200
$ 123
$ 5,750.0
$ 12,000.0
$ 1,200.0
$ 5,000.0
$ 10,000.0
$ 100,000.0 $ 100,000.0
$ 27
$ 86,940.0
$ 3.5
$ 1,225.0
$ 200
$ 4,000.0
$2
$ 7,000.0
$ 62
$ 78,740.0
$ 165
$ 2,310.0
$ 62
$ 75,020.0
$ 25
$ 20,250.0
$ 95
$ 11,400.0
$ 162
$ 97,200.0
$ 172
$ 86,000.0
$ 11
$ 4,840.0
$ 2,000.00 $ 2,000.00
$ 25
$ 20,750.0
$ 180
$ 10,800.0
$ 4,050.0
$ 44,550.0
$ 4,900.0
$ 4,900.0
$ 425
$ 425
$ 1,075.0
$ 3,225.0
$ 145
$ 153,700.0
$ 65
$ 7,150.0
$ 50
$ 34,000.0
$ 13
$ 8,840.0
$ 22.5
$ 123,750.0
$ 17.5
$ 32,550.0
$ 48
$ 4,800.0
$ 200
$ 14,000.0
$ 17.5
$ 6,825.0
$ 10
$ 5,400.0
$4
$ 2,160.0
$ 21,500.0 $ 21,500.0
$ 65,000.0 $ 65,000.0
$ 16,000.0 $ 16,000.0
$ 85
$ 12,750.0
$ 0.75
$ 1,140.0
$ 0.75
$ 1,605.0
$9
$ 5,760.0
$ 600
$ 12,000.0
$ 215
$ 260,150.0
$ 6,500.0
$ 26,000.0
$ 11,200.0 $ 22,400.0
$ 2,125.0
$ 2,125.0
$ 25,000.0 $ 25,000.0
$ 10,000.0 $ 10,000.0
$ 15,000.0
$ 128,800.0
$ 2,800.0
$ 4,000.0
$ 5,250.0
$ 76,200.0
$ 1,750.0
$ 72,600.0
$ 48,600.0
$ 10,980.0
$ 78,960.0
$ 70,000.0
$ 4,070.0
$ 2,000.0
$ 15,977.5
$ 7,500.0
$ 52,800.0
$ 4,600.0
$ 1,700.0
$ 3,600.0
$ 111,300.0
$ 1,210.0
$ 27,200.0
$ 14,960.0
$ 132,000.0
$ 52,080.0
$ 4,000.0
$ 9,800.0
$ 10,920.0
$ 5,940.0
$ 1,620.0
$ 25,000.0
$ 54,000.0
$ 15,000.0
$ 12,750.0
$ 1,216.0
$ 1,712.0
$ 1,920.0
$ 7,000.0
$ 175,450.0
$ 26,000.0
$ 19,000.0
$ 2,000.0
$ 75,000.0
$ 10,000.0
$ 30,000.0
$ 77,280.0
$ 2,450.0
$ 1,700.0
$ 28,000.0
$ 69,850.0
$ 2,800.0
$ 67,760.0
$ 46,980.0
$ 14,400.0
$ 84,000.0
$ 74,000.0
$ 3,520.0
$ 2,000.0
$ 16,600.0
$ 5,880.0
$ 48,400.0
$ 5,550.0
$ 1,600.0
$ 7,500.0
$ 99,640.0
$ 5,500.0
$ 21,760.0
$ 8,500.0
$ 82,500.0
$ 33,480.0
$ 3,950.0
$ 6,300.0
$ 7,020.0
$ 6,480.0
$ 1,350.0
$ 20,000.0
$ 25,477.0
$ 8,000.0
$ 12,750.0
$ 1,824.0
$ 2,568.0
$ 4,800.0
$ 8,000.0
$ 135,520.0
$ 36,600.0
$ 36,000.0
$ 1,300.0
$ 30,000.0
$ 10,000.0
$ 40,000.0
$ 77,280.0
$ 1,400.0
$ 4,400.0
$ 14,000.0
$ 81,280.0
$ 3,500.0
$ 77,440.0
$ 24,300.0
$ 9,600.0
$ 90,000.0
$ 79,000.0
$ 440
$ 2,000.0
$ 8,300.0
$ 7,500.0
$ 68,750.0
$ 6,500.0
$ 1,200.0
$ 4,500.0
$ 116,600.0
$ 3,300.0
$ 34,000.0
$ 11,560.0
$ 110,000.0
$ 46,500.0
$ 3,000.0
$ 4,900.0
$ 10,920.0
$ 5,400.0
$ 3,780.0
$ 50,000.0
$ 60,000.0
$ 21,000.0
$ 16,500.0
$ 1,520.0
$ 2,140.0
$ 6,400.0
$ 4,000.0
$ 163,350.0
$ 26,000.0
$ 17,000.0
$ 2,000.0
$ 16,000.0
$ 10,000.0
$ 32,500.0
$ 96,600.0
$ 2,625.0
$ 8,000.0
$ 3,500.0
$ 71,120.0
$ 2,800.0
$ 85,910.0
$ 59,940.0
$ 19,440.0
$ 79,200.0
$ 75,000.0
$ 5,720.0
$ 2,000.0
$ 19,090.0
$ 12,600.0
$ 67,100.0
$ 6,000.0
$ 800
$ 7,950.0
$ 73,140.0
$ 2,420.0
$ 42,840.0
$ 14,960.0
$ 137,500.0
$ 48,360.0
$ 2,800.0
$ 8,750.0
$ 14,820.0
$ 12,420.0
$ 2,700.0
$ 27,500.0
$ 58,000.0
$ 32,500.0
$ 11,400.0
$ 988.0
$ 1,391.0
$ 5,120.0
$ 10,000.0
$ 235,950.0
$ 32,800.0
$ 23,000.0
$ 1,520.0
$ 32,000.0
$ 10,000.0
$ 40,000.0
$ 48,300.0
$ 1,050.0
$ 3,500.0
$ 28,000.0
$ 39,370.0
$ 2,100.0
$ 37,510.0
$ 28,350.0
$ 11,400.0
$ 84,000.0
$ 73,500.0
$ 4,840.0
$ 2,000.0
$ 17,430.0
$ 7,800.0
$ 45,100.0
$ 5,000.0
$ 950
$ 3,600.0
$ 117,660.0
$ 4,950.0
$ 30,600.0
$ 11,220.0
$ 121,000.0
$ 46,500.0
$ 3,500.0
$ 4,550.0
$ 7,507.5
$ 4,320.0
$ 1,350.0
$ 20,000.0
$ 45,000.0
$ 15,000.0
$ 12,000.0
$ 1,520.0
$ 2,140.0
$ 5,120.0
$ 4,000.0
$ 148,830.0
$ 23,000.0
$ 24,000.0
$ 1,200.0
$ 5,000.0
$ 10,000.0
Indicates an error was corrected
26-2 - Rehabilitation of Maple Avenue, Century
Avenue, and Division Street
Project Overview
Project Details
Reference ID
26-2
Project Name
Rehabilitation of Maple Avenue, Century Avenue, and Division Street
Project Owner
Natasha Nau
Project Type
ITB
Department
Purchasing
Current Spend
$0.00
Target Savings
10%
Budget
$1300000.00 - $1630152.00
Project Description
ITB #26-2; STEAP Project #0006-0129; Beacon Falls is seeking bids
from qualified respondents for the roadway rehabilitation of Maple
Avenue, Century, and Division Street, which includes full-depth
reconstruction, paving, fine milling of bituminous pavement, installation
of new concrete curbing, driveway ramps, integral concrete sidewalks
with concrete curbing, concrete sidewalk ramps, storm drainage
modifications, sanitary sewer upgrades, and new signs and pavement
markings. Respondents must have demonstrated experience in
completing similar work (as described in the contract plans, standard
specifications and special provisions) and adhere to standards and
requirements (State of Connecticut Department of Transportation
Standard Specifications for Roads, Bridges, Facilities and Incidental
Construction Form 819, with July 2025 Supplemental Specifications and
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 1 of 75
all other supplements thereto, and Town of Beacon Falls standards)
typical for such work.
Open Date
Jun 04, 2026 10:00 AM EDT
Close Date
Jul 02, 2026 2:00 PM EDT
Highest Scoring Supplier
Score
M. Rondano Inc.
108 pts
Seal status
Requested Information
Unsealed on
Unsealed by
Optional Qualifications
Package
Jul 02, 2026 2:12 PM EDT
Natasha Nau
Resumes
Jul 02, 2026 2:12 PM EDT
Natasha Nau
Letter of Interest
Jul 02, 2026 2:12 PM EDT
Natasha Nau
References
Jul 02, 2026 2:12 PM EDT
Natasha Nau
List of Similar Projects
Jul 02, 2026 2:12 PM EDT
Natasha Nau
Maple, Century, and Division
Rehabilitation (Q-69CO)
Jul 02, 2026 2:12 PM EDT
Natasha Nau
Maple, Century and Division
Rehabilitation (BT-37AF)
Jul 02, 2026 2:12 PM EDT
Natasha Nau
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 2 of 75
Public Notices
Project Details Have Changed
Natasha Nau, Jun 04, 2026 1:02 PM EDT
Addendum 1 - Prevailing Wages from State of CT (Heavy Schedule) are hereby posted in the
public files area as addenda.
Addendum 2 Posted (6/11 Optional On-Site Pre-Bid)
Natasha Nau, Jun 16, 2026 12:55 PM EDT
Hello! Thanks to those who attended our 6/11 Optional On-Site Pre-Bid Meeting. Attached are
the notes from this meeting (including Q&A) as Addendum 2.
Addendum 3 Posted (changes to online bid table & deadline extension)
Natasha Nau, Jul 01, 2026 1:54 PM EDT
Hi folks: quantity corrections and items have been added to online bid table to match the project
manual. We have extended the deadline a few hours tomorrow to assist with making
adjustments.
Bid Tabulation Posted!
Natasha Nau, Jul 02, 2026 3:42 PM EDT
The Town of Beacon Falls wants to share a sincere thank you to all 10 bid respondents. We
appreciate your time and effort. The bid tabulation is hereby posted. Grading will now
commence. We anticipate to make the award at the regular 7/13 Board of Selectmen meeting.
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 4 of 75
Submissions
Supplier
Date Submitted
Name
Confirmation Code
C.J. Fucci, Inc.
Jul 02, 2026 9:20 AM EDT
Vincent Federico
ODYwMjE3
J. Iapaluccio Inc.
Jul 02, 2026 12:30 PM
EDT
Kris Nigro
ODYwNTI4
Asphalt Repair Solutions
Inc.
Jul 02, 2026 12:44 PM
EDT
Matthew Curtis
matt@asphaltrepairsolutions.
com
ODYwNTQx
M. Rondano Inc.
Jul 02, 2026 11:03 AM
EDT
Lynn Arnow
ODYwMzQw
Richards Corporation
Jul 01, 2026 4:04 PM EDT
Megan Hychko
ODYwMDA2
Dayton Construction
Company, Inc.
Jul 01, 2026 2:49 PM EDT
Matthew Dayton
ODU5OTMy
Grasso Companies
Jul 02, 2026 10:20 AM
EDT
Ralph Vavala
ODYwMjk0
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 5 of 75
Guerrera Construction
Co Inc
Jul 02, 2026 9:25 AM EDT
Joseph Guerrera
debs@guerreraconstructionc
o.com
ODYwMjI2
B&W Paving &
Landscaping, LLC
Jul 02, 2026 9:11 AM EDT
Betty Mucha
ODYwMjAx
EARTHWORKS
EXCAVATING AND
LANDSCAPING INC.
Jul 02, 2026 11:52 AM
EDT
MIKE WOROBEL
ODYwMzk5
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 6 of 75
Project Criteria
Criteria
Points
Description
Fee Proposal (Bid Table)
51 pts
Cost: based on Fee Proposal (Bid Table) Items: reasonableness, amount, etc.
(30%)
References
10 pts
Finance Manager Only: results of reference calls
CHRO
Pass/Fail
Is the CHRO document uploaded and does it meet the requirements?
LOI
Pass/Fail
Is the LOI uploaded and does it meet the requirements (i.e. states the prices can
be held for 90 days, their contact info, and why they are uniquely qualified to
complete this project)?
Bid Bond
Pass/Fail
Is the bid bond uploaded, in the proper format/template, sealed/stamped, and in
the proper amount?
5 pts
Is the list of projects uploaded and does it meet the requirements (i.e. project
name, owner name, scope, $ value, timeline)? Does the list demonstrate
capability and skill?
List of Similar Projects
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 7 of 75
Resumes
5 pts
A - Maple, Century, and Division
Rehabilitation (Q-69CO)
39 pts
A-1 - Qualifications
10 pts
A-2 - Special Provisions (Specifications) &
Scope of Work
18 pts
A-3 - Terms & Conditions
3.5 pts
A-4 - Affidavits: Non-Collusive/Non-Conflict +
AA/EEO
7.5 pts
Total
110 pts
Are the resumes uploaded? Are they professional looking? Does the staff appear
qualified?
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 8 of 75
Scoring Summary
Active Submissions
Total
Fee Proposal (Bid
Table)
References
CHRO
LOI
Supplier
/ 110 pts
/ 51 pts
/ 10 pts
Pass/Fail
Pass/Fail
M. Rondano Inc.
108 pts
51 pts ($1,153,767.70)
9 pts
Pass
Mixed
EARTHWORKS
EXCAVATING AND
LANDSCAPING INC.
102.57 pts
49.05 pts
($1,199,589.00)
9 pts
Pass
Pass
Dayton Construction
Company, Inc.
99.82 pts
40.82 pts
($1,441,458.00)
10 pts
Mixed
Pass
B&W Paving &
Landscaping, LLC
95.15 pts
41.9 pts
($1,404,265.70)
5 pts
Pass
Pass
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 9 of 75
Total
Fee Proposal (Bid
Table)
References
CHRO
LOI
Supplier
/ 110 pts
/ 51 pts
/ 10 pts
Pass/Fail
Pass/Fail
J. Iapaluccio Inc.
87.46 pts
39.21 pts
($1,500,768.00)
0 pts
Pass
Pass
Asphalt Repair
Solutions Inc.
87.08 pts
28.83 pts
($2,040,859.00)
10 pts
Pass
Pass
Richards Corporation
86.82 pts
38.32 pts
($1,535,390.00)
0 pts
Pass
Pass
Grasso Companies
85.78 pts
43.68 pts
($1,347,260.00)
0 pts
Pass
Pass
Guerrera Construction
Co Inc
82.18 pts
34.18 pts
($1,721,582.00)
0 pts
Pass
Pass
C.J. Fucci, Inc.
81.89 pts
33.14 pts
($1,775,500.00)
0 pts
Pass
Pass
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 10 of 75
Bid Bond
List of Similar
Projects
Resumes
A - Maple, Century,
and Division
Rehabilitation (Q69CO)
Supplier
Pass/Fail
/ 5 pts
/ 5 pts
/ 39 pts
/ 10 pts
M. Rondano Inc.
Pass
4.25 pts
4.75 pts
39 pts
10 pts
EARTHWORKS
EXCAVATING AND
LANDSCAPING INC.
Pass
2.25 pts
3.5 pts
38.77 pts
10 pts
Dayton Construction
Company, Inc.
Pass
5 pts
5 pts
39 pts
10 pts
B&W Paving &
Landscaping, LLC
Mixed
4.5 pts
4.75 pts
39 pts
10 pts
J. Iapaluccio Inc.
Pass
4.75 pts
4.5 pts
39 pts
10 pts
Asphalt Repair
Solutions Inc.
Pass
4.75 pts
5 pts
38.5 pts
10 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 11 of 75
A-1 - Qualifications
Bid Bond
List of Similar
Projects
Resumes
A - Maple, Century,
and Division
Rehabilitation (Q69CO)
Supplier
Pass/Fail
/ 5 pts
/ 5 pts
/ 39 pts
/ 10 pts
Richards Corporation
Pass
4.5 pts
5 pts
39 pts
10 pts
Grasso Companies
Pass
4.75 pts
2.75 pts
34.6 pts
5.6 pts
Guerrera Construction
Co Inc
Pass
4.25 pts
4.75 pts
39 pts
10 pts
C.J. Fucci, Inc.
Pass
5 pts
4.75 pts
39 pts
10 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 12 of 75
A-1 - Qualifications
A-2 - Special
Provisions
(Specifications) &
Scope of Work
A-3 - Terms &
Conditions
A-4 - Affidavits: NonCollusive/NonConflict + AA/EEO
Supplier
/ 18 pts
/ 3.5 pts
/ 7.5 pts
M. Rondano Inc.
18 pts
3.5 pts
7.5 pts
EARTHWORKS
EXCAVATING AND
LANDSCAPING INC.
18 pts
3.267 pts
7.5 pts
Dayton Construction
Company, Inc.
18 pts
3.5 pts
7.5 pts
B&W Paving &
Landscaping, LLC
18 pts
3.5 pts
7.5 pts
J. Iapaluccio Inc.
18 pts
3.5 pts
7.5 pts
Asphalt Repair
Solutions Inc.
18 pts
3.5 pts
7 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 13 of 75
A-2 - Special
Provisions
(Specifications) &
Scope of Work
A-3 - Terms &
Conditions
A-4 - Affidavits: NonCollusive/NonConflict + AA/EEO
Supplier
/ 18 pts
/ 3.5 pts
/ 7.5 pts
Richards Corporation
18 pts
3.5 pts
7.5 pts
Grasso Companies
18 pts
3.5 pts
7.5 pts
Guerrera Construction
Co Inc
18 pts
3.5 pts
7.5 pts
C.J. Fucci, Inc.
18 pts
3.5 pts
7.5 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 14 of 75
Proposal Score Comments
C.J. Fucci, Inc. - Scoring Comments
Fee Proposal (Bid Table) - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
33.14 pts ($1,775,500.00)
-
#9 of 10
Natasha Nau
33.14 pts ($1,775,500.00)
-
CJ Fucci's price ranks 9 out of 10
bids (9/10 Low to High) - i.e.
second highest
Michael Krenesky
33.14 pts ($1,775,500.00)
-
Bid
Paul DeStefano
33.14 pts ($1,775,500.00)
-
Bid Total
Rob Pruzinsky
33.14 pts ($1,775,500.00)
-
Second highest bid
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 15 of 75
References - Reviewer Scores
Reviewer
Score
Reason
Comments
Natasha Nau
0 pts
Other
Not calling CJ Fucci's references
as they are not in the top 3 lowest
bids.
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
CJ Fucci's CHRO is present and
complete
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
CHRO - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 16 of 75
LOI - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Demonstrated Interest
Natasha Nau
Pass
Meets the requirement(s)
CJ Fucci's LOI meets all
requirements. Strong in the "why
they are uniquely qualified"
section.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Bid Bond - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 17 of 75
Reviewer
Score
Reason
Comments
Natasha Nau
Pass
Meets the requirement(s)
CJ Fucci's bid bond is present and
of acceptable format
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
List of Similar Projects - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Strongly fits desired attribute(s)
Work for Derby and Naugatuck on
similar projects
Meets or exceeds my expectations
CJ Fucci's list of 3 similar projects
meets all requirements (has all
requested pieces of info) and
demonstrates capability with
projects of similar complexity to
ours (rehab/reconstruct of same
Natasha Nau
5 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 18 of 75
Reviewer
Score
Reason
Comments
magnitude and similar
components).
Michael Krenesky
5 pts
Meets or exceeds my expectations
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Provided
Meets or exceeds my expectations
CJ Fucci's 6 resumes are provided
and are in an acceptable format.
Members of their team
demonstrate they are qualified to
complete our project. One of the
superintendents currently also
Resumes - Reviewer Scores
Natasha Nau
4 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 19 of 75
Reviewer
Score
Reason
Comments
works for Lapaluccio (competitior
on this bid)? Kind of odd.
Michael Krenesky
5 pts
Meets or exceeds my expectations
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 20 of 75
J. Iapaluccio Inc. - Scoring Comments
Fee Proposal (Bid Table) - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
39.21 pts ($1,500,744.00)
-
#6 of 10
Natasha Nau
39.21 pts ($1,500,774.00)
-
Lapaluccio's price ranks 6 out of 10
bids (6/10 Low to High)
Michael Krenesky
39.21 pts ($1,500,774.00)
-
as bid
Paul DeStefano
39.21 pts ($1,500,774.00)
-
Bid Total
Rob Pruzinsky
39.21 pts ($1,500,774.00)
-
Sixth in bid price
References - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 21 of 75
Reviewer
Reason
Comments
0 pts
Other
Not calling Lapaluccio's references
as they are not in the top 3 lowest
bids.
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Lapaluccio's CHRO is present and
complete
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Natasha Nau
Score
CHRO - Reviewer Scores
LOI - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 22 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Demonstrated interest
Natasha Nau
Pass
Meets the requirement(s)
Lapaluccio's LOI meets all
requirements. Satisfied the "why
they are uniquely qualified"
section.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Lapaluccio's bid bond is present
and of acceptable format
Bid Bond - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 23 of 75
Reviewer
Score
Reason
Comments
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
List of Similar Projects - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Municipal work demonstrated
Meets or exceeds my expectations
Lapaluccio's list of 3 similar
projects meets all requirements
(has all requested pieces of info)
and demonstrates capability with
projects of similar complexity to
ours (rehab/reconstruct of same
magnitude and similar
components). They do an excellent
job of providing a detailed scope
Natasha Nau
5 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 24 of 75
Reviewer
Score
Reason
Comments
Michael Krenesky
4 pts
Well-supported claim(s)
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Resumes provided
Meets or exceeds my expectations
Lapaluccio's 2 resumes are
provided and are in an acceptable
format. Members of their team
demonstrate they are qualified to
complete our project. Just seems
like there are likely more team
members required in order to
complete our project and their
resumes were ommitted?
Resumes - Reviewer Scores
Natasha Nau
4 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 25 of 75
Reviewer
Score
Reason
Comments
Michael Krenesky
5 pts
Meets or exceeds my expectations
meets
Paul DeStefano
4 pts
Meets or exceeds my expectations
Only 2 resumes provided
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 26 of 75
Asphalt Repair Solutions Inc. - Scoring Comments
Fee Proposal (Bid Table) - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
28.83 pts ($2,040,859.00)
-
High bid
Natasha Nau
28.83 pts ($2,040,859.00)
-
ARS is highest out of 10 bids
(10/10)
Michael Krenesky
28.83 pts ($2,040,859.00)
-
Bid Table
Paul DeStefano
28.83 pts ($2,040,859.00)
-
Bid Total
Rob Pruzinsky
28.83 pts ($2,040,859.00)
-
Highest Bid
References - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 27 of 75
Reviewer
Reason
Comments
10 pts
Meets or exceeds my expectations
Not calling references as ARS is
not in the top 3 lowest bids. ARS is
also the Town's current on-call
paver so the Town is extremely
familiar with them. We are aware
of their capabilities and
performance. They have been very
pleasant to work with and always
gives us quantity breaks on pricing
tiers.
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Completed CHRO
Natasha Nau
Pass
Meets the requirement(s)
ARS's CHRO is present and
complete
Natasha Nau
Score
CHRO - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 28 of 75
Reviewer
Score
Reason
Comments
Michael Krenesky
Pass
Meets the requirement(s)
meets Req
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Current paving contractor for Town
of Beacon Falls
LOI - Reviewer Scores
Natasha Nau
Pass
Meets the requirement(s)
ARS's LOI meets all requirements.
Slightly weak in the "why they are
uniquely qualified" section. Should
have listed familiarity with roads
and processes with being the oncall paver!
Michael Krenesky
Pass
Meets the requirement(s)
meets
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 29 of 75
Reviewer
Score
Reason
Comments
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
ARS's bid bond is present and of
acceptable format
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Bid Bond - Reviewer Scores
List of Similar Projects - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 30 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Work completed for several towns,
including ours.
Natasha Nau
5 pts
Meets or exceeds my expectations
ARS's list of 8 similar projects
meets all requirements (has all
requested pieces of info) and
demonstrates capability with
projects of similar complexity to
ours (rehab/reconstruct of same
magnitude and similar
components).
Michael Krenesky
4 pts
Well-supported claim(s)
Meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Similar experience to this project
Resumes - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 31 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Provided with training certificattes
Natasha Nau
5 pts
Meets or exceeds my expectations
ARS's 3 resumes are provided and
are in an acceptable format.
Members of their team
demonstrate they are qualified to
complete our project.
Michael Krenesky
5 pts
Well-supported claim(s)
Meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 32 of 75
M. Rondano Inc. - Scoring Comments
Fee Proposal (Bid Table) - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
51 pts ($1,153,767.50)
-
Low bid
Natasha Nau
51 pts ($1,153,768.00)
-
Rondano's price ranks 1 out of 10
bids (1/10 Low to High) - low
bidder. My worry, as always, is,
can they do the job for this low
amount, or did they underbid and
there will be a ton of change
orders, putting them close to one
of their competitors by the end of
the project? The big swings are in
the following 3 items: 0202000
Earth Excavation, 0212000
Subbase, and 0304002 Processed
Aggregate Base.
Michael Krenesky
51 pts ($1,153,767.50)
-
as bid
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 33 of 75
Reviewer
Score
Reason
Comments
Paul DeStefano
51 pts ($1,153,768.00)
-
Bid Total
Rob Pruzinsky
51 pts ($1,153,767.50)
-
Lowest bid
Reason
Comments
Meets or exceeds my expectations
From ref calls: Very good
contractor. They are great with
making deadlines and even getting
done ahead of time. They are good
with staying at budget. They have
been doing pretty good. Pretty
satisfied. Great with
communication and respond very
quickly. Concrete work they were
excellent. Very responsive. They
worked through the winter, which
was very helpful. Zero change
orders. They sub out their paving.
References - Reviewer Scores
Reviewer
Natasha Nau
Score
9 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 34 of 75
Reviewer
Score
Reason
Comments
They are not a big finishing
company.
CHRO - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Rondano's CHRO is present and
complete
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
LOI - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 35 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Demonstrated Interest
Natasha Nau
Fail
Incomplete response
Rondano's LOI does not meet all
requirements. Missing the holding
the quote for 90 days piece but has
a strong "why they are uniquely
qualified" section.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Rondano's bid bond is present and
of acceptable format
Bid Bond - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 36 of 75
Reviewer
Score
Reason
Comments
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reason
Comments
Meets or exceeds my expectations
On call drainage for municipalities,
work for Aquarion, positive
reference checks. More drainage
work, less concrete and paving on
listing.
Partially meets my expectations
Rondano's list of 35+ similar
projects meets all requirements
(has all requested pieces of info)
and demonstrates capability with
projects of similar complexity to
ours (rehab/reconstruct of same
magnitude and similar
List of Similar Projects - Reviewer Scores
Reviewer
Erin Schwarz
Natasha Nau
Score
5 pts
3 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 37 of 75
Reviewer
Score
Reason
Comments
components). Hard to sift through
so many projects to find the
relevant ones. Seems like this
contractor is more heavily skilled in
drainage and water pipe
replacement. Majority of jobs has
been for Aquarion. Can they excel
at road rehab?
Michael Krenesky
4 pts
Well-supported claim(s)
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Resumes provided
Natasha Nau
5 pts
Meets or exceeds my expectations
Rondano supplies a summary
company profile with all 14
Resumes - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 38 of 75
Reviewer
Score
Reason
Comments
company employees and quick
snapshot of roles/experience.
Rondano also supplies 2 resumes
for the superintendants that are in
an acceptable format. Members of
their team demonstrate they are
qualified to complete our project.
Michael Krenesky
5 pts
Meets or exceeds my expectations
meets
Paul DeStefano
4 pts
Meets or exceeds my expectations
Only 2 resumes provided
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 39 of 75
Richards Corporation - Scoring Comments
Fee Proposal (Bid Table) - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
38.35 pts ($1,534,205.00)
-
#7 of 10
Natasha Nau
38.3 pts ($1,536,180.00)
-
Richards' price ranks 7 out of 10
bids (7/10 Low to High)
Michael Krenesky
38.3 pts ($1,536,180.00)
-
as bid
Paul DeStefano
38.35 pts ($1,534,205.00)
-
Bid Total
Rob Pruzinsky
38.3 pts ($1,536,180.00)
-
Seventh in bid price
References - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 40 of 75
Reviewer
Reason
Comments
0 pts
Other
Not calling Richards' references as
they are not in the top 3 lowest
bids.
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Richards' CHRO is present and
complete
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Natasha Nau
Score
CHRO - Reviewer Scores
LOI - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 41 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Demonstrated interest
Natasha Nau
Pass
Meets the requirement(s)
Richards' LOI meets all
requirements. Strong in the "why
they are uniquely qualified"
section.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Ricahrds' bid bond is present and
of acceptable format
Bid Bond - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 42 of 75
Reviewer
Score
Reason
Comments
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
List of Similar Projects - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
State DOT work primarily
Meets or exceeds my expectations
Richards' list of 5 similar projects
meets all requirements (has all
requested pieces of info) and
demonstrates capability with
projects of similar complexity to
ours (rehab/reconstruct of same
magnitude and similar
components). Only worry I would
have is that 4 out of 5 are DOT
projects. Only 1 town. Do they
know the in's and out's of working
Natasha Nau
4 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 43 of 75
Reviewer
Score
Reason
Comments
with a town and the paperwork
requirements.
Michael Krenesky
4 pts
Well-supported claim(s)
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Key personnel and resumes
provided
Meets or exceeds my expectations
Richards' supplies a summary of
its 14 employees' experience plus
3 resumes (VP, Superintendent,
and Site Manager) which are in an
acceptable format. Members of
Resumes - Reviewer Scores
Natasha Nau
5 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 44 of 75
Reviewer
Score
Reason
Comments
their team demonstrate they are
qualified to complete our project.
Michael Krenesky
5 pts
Well-supported claim(s)
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 45 of 75
Dayton Construction Company, Inc. - Scoring Comments
Fee Proposal (Bid Table) - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
40.82 pts ($1,441,460.00)
-
#5 of 10
Natasha Nau
40.82 pts ($1,441,460.00)
-
Dayton's price ranks 5 out of 10
bids (5/10 Low to High) - middle of
the road
Michael Krenesky
40.82 pts ($1,441,450.00)
-
bid
Paul DeStefano
40.82 pts ($1,441,460.00)
-
Bid Total
Rob Pruzinsky
40.82 pts ($1,441,460.00)
-
Fifth in bid price
References - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 46 of 75
Reviewer
Reason
Comments
10 pts
Meets or exceeds my expectations
Not calling references as Dayton is
not in the top 3 lowest bids. Dayton
has completed a couple projects in
Town. We are aware of their
capabilities and performance. They
have been very pleasant to work
with.
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Score
CHRO - Reviewer Scores
Natasha Nau
Fail
Does not meet the requirement(s)
Dayton's CHRO is not present.
They attached the affidavits for this
requirement in error.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 47 of 75
Reviewer
Score
Reason
Comments
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Has shown great interest in
working in Beacon Falls
LOI - Reviewer Scores
Natasha Nau
Pass
Meets the requirement(s)
Dayton's LOI meets all
requirements. Strong in the "why
they are uniquely qualified"
section.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Bid Bond - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 48 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Dayton's bid bond is present and
of acceptable format
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
List of Similar Projects - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Has done similar work for the
Town.
Natasha Nau
5 pts
Meets or exceeds my expectations
Dayton's list of 3 similar projects
meets all requirements (has all
requested pieces of info) and
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 49 of 75
Reviewer
Score
Reason
Comments
demonstrates capability with
projects of similar complexity to
ours (rehab/reconstruct of same
magnitude and similar
components).
Michael Krenesky
5 pts
Meets or exceeds my expectations
Dayton has previously completed
work for the Town that has been
exceptional.
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Positive experience with company
Natasha Nau
5 pts
Meets or exceeds my expectations
Dayton's 5 resumes are provided
and are in an acceptable format.
Members of their team
Resumes - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 50 of 75
Reviewer
Score
Reason
Comments
demonstrate they are qualified to
complete our project.
Michael Krenesky
5 pts
Meets or exceeds my expectations
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 51 of 75
Grasso Companies - Scoring Comments
Fee Proposal (Bid Table) - Reviewer Scores
Reviewer
Score
Reason
Erin Schwarz
43.68 pts ($1,347,260.00)
-
Natasha Nau
43.68 pts ($1,347,260.00)
-
Grasso's price ranks 3 out of 10
bids (3/10 Low to High) - third
lowest
Michael Krenesky
43.68 pts ($1,347,260.00)
-
as bid
Paul DeStefano
43.68 pts ($1,347,260.00)
-
Bid Total
Rob Pruzinsky
43.68 pts ($1,347,260.00)
-
Third lowest bid price
References - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 52 of 75
Comments
#3 of 10
Town has experience with them
Reviewer
Reason
Comments
0 pts
Doesn't meet my expectations
Not calling Grasso's references
even though they are in the top 3
lowest bids. From prior experience
the Town has had with Grasso on
a previous road project, we would
not hire them again. Work was ok dealing with them on issues was a
little painful.
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Other
Provided
Natasha Nau
Pass
Meets the requirement(s)
Grasso's CHRO is present and
complete
Michael Krenesky
Pass
Meets the requirement(s)
meets
Natasha Nau
Score
CHRO - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 53 of 75
Reviewer
Score
Reason
Comments
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Shows interest/Worked for the
Town in the past.
LOI - Reviewer Scores
Natasha Nau
Pass
Meets the requirement(s)
Grasso's LOI meets all
requirements. Satisfies the "why
they are uniquely qualified"
section.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Bid Bond - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 54 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Grasso's bid bond is present and
of acceptable format
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
List of Similar Projects - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Work for Town and utility; including
work n Beacon Falls
Natasha Nau
5 pts
Meets or exceeds my expectations
Grasso's list of 20+ similar projects
meets all requirements (has all
requested pieces of info) and
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 55 of 75
Reviewer
Score
Reason
Comments
demonstrates capability with
projects of similar complexity to
ours (rehab/reconstruct of same
magnitude and similar
components).
Michael Krenesky
4 pts
Strongly fits desired attribute(s)
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Reviewer
Score
Reason
Comments
Erin Schwarz
3 pts
Partially meets my expectations
Key personnel listing instead of
resumes
Natasha Nau
1 pts
Incomplete response
Grasso does not resumes in an
acceptable format. They provide a
1-page list of names, positions,
Resumes - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 56 of 75
Reviewer
Score
Reason
Comments
and years of experience. It is better
than nothing but not by much.
Michael Krenesky
5 pts
Meets or exceeds my expectations
meets
Paul DeStefano
2 pts
Partially meets my expectations
full resumes not provided
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 57 of 75
Guerrera Construction Co Inc - Scoring Comments
Fee Proposal (Bid Table) - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
34.18 pts ($1,721,582.00)
-
#8 of 10
Natasha Nau
34.18 pts ($1,721,582.00)
-
Guerrera's price ranks 8 out of 10
bids (8/10 Low to High) - third
highest
Michael Krenesky
34.18 pts ($1,721,582.00)
-
as bid
Paul DeStefano
34.18 pts ($1,721,582.00)
-
Bid Total
Rob Pruzinsky
34.18 pts ($1,721,582.00)
-
Eighth in bid price
References - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 58 of 75
Reviewer
Reason
Comments
0 pts
Other
Not calling Guerrera's references
as they are not in the top 3 lowest
bids.
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Guerrera's CHRO is present and
complete
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Natasha Nau
Score
CHRO - Reviewer Scores
LOI - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 59 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Has shown interest in working for
the Town.
Natasha Nau
Pass
Meets the requirement(s)
Guerrera's LOI meets all
requirements. Slightly weak in the
"why they are uniquely qualified"
section.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Guerrera's bid bond is present and
of acceptable format
Bid Bond - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 60 of 75
Reviewer
Score
Reason
Comments
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
List of Similar Projects - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Extensive work in public sector
Partially fits desired attributes
Guerrera's list of 40+ similar
projects meets all requirements
(has all requested pieces of info)
and demonstrates capability with
projects of similar complexity to
ours (rehab/reconstruct of same
magnitude and similar
components). I like how they have
the % complete columns and % of
work self performed. Just a lot of
projects to sift through and not as
Natasha Nau
3 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 61 of 75
Reviewer
Score
Reason
Comments
much scope description as I would
have liked. Just has a title "road
improvements" - could have used a
few more words.
Michael Krenesky
4 pts
Well-supported claim(s)
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Reviewer
Score
Reason
Comments
Erin Schwarz
4 pts
Meets or exceeds my expectations
Principal listing and 1 detailed
resume
Meets or exceeds my expectations
Guerrera uploaded a summary
resume style document for 6 of
their team members. Provides a
nice snapshot of their experience
and backgrounds. In addition,
Resumes - Reviewer Scores
Natasha Nau
5 pts
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 62 of 75
Reviewer
Score
Reason
Comments
Guerrera provides a full detailed
resume for the Construction
Manager. Members of their team
demonstrate they are qualified to
complete our project.
Michael Krenesky
5 pts
Meets or exceeds my expectations
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 63 of 75
B&W Paving & Landscaping, LLC - Scoring Comments
Fee Proposal (Bid Table) - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
41.9 pts ($1,404,265.50)
-
#4 of 10
Natasha Nau
41.9 pts ($1,404,266.00)
-
B&W's price ranks 4 out of 10 bids
(4/10 Low to High)
Michael Krenesky
41.9 pts ($1,404,265.50)
-
from Bid-table
Paul DeStefano
41.9 pts ($1,404,266.00)
-
Bid total
Rob Pruzinsky
41.9 pts ($1,404,265.50)
-
Fourth in Bid price
References - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 64 of 75
Reviewer
Reason
Comments
5 pts
Partially fits desired attributes
Not calling B&W's references as
they are not in the top 3 lowest
bids. From prior experience the
Town has had with B&W on a
previous road project, we would
not hire them again. Work was ok dealing with them on a fix on one
of the roads was painful.
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
B&W's CHRO is present and
complete
Michael Krenesky
Pass
Meets the requirement(s)
meets
Natasha Nau
Score
CHRO - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 65 of 75
Reviewer
Score
Reason
Comments
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Has shown interest and worked for
the Town in the past.
LOI - Reviewer Scores
Natasha Nau
Pass
Meets the requirement(s)
B&Ws LOI meets all requirements.
Very strong in the "why they are
uniquely qualified" section.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Bid Bond - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 66 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
Fail
Incomplete response
Application for Payment form
which his notarized.
Natasha Nau
Fail
Does not meet the requirement(s)
B&W's bid bond is not present.
This is an application for payment
to Naugatuck on Rubber Ave.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Other
Bid Bond not provided; Payment
application from another project
provided
Paul DeStefano
Fail
List of Similar Projects - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Has worked for Towns and the
State as well as private companies
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 67 of 75
Reviewer
Score
Reason
Comments
Natasha Nau
4 pts
Meets or exceeds my expectations
B&W's list of 30+ similar projects
meets all requirements (has all
requested pieces of info) and
demonstrates capability with
projects of similar complexity to
ours (rehab/reconstruct of same
magnitude and similar
components). A state contract form
is provided, which is fine, it is just
difficult to weed through them to
find the relevant projects.
Michael Krenesky
4 pts
Meets or exceeds my expectations
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Resumes - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 68 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
5 pts
Meets or exceeds my expectations
Provided
Natasha Nau
4 pts
Meets or exceeds my expectations
B&W's 3 resumes are provided
and are in an acceptable format.
Members of their team
demonstrate they are qualified to
complete our project.
Michael Krenesky
5 pts
Meets or exceeds my expectations
has employees
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 69 of 75
EARTHWORKS EXCAVATING AND LANDSCAPING INC. - Scoring Comments
Fee Proposal (Bid Table) - Reviewer Scores
Reviewer
Score
Reason
Comments
Erin Schwarz
49.05 pts ($1,199,589.00)
-
#2 of 10
Natasha Nau
49.05 pts ($1,199,589.00)
-
Earthworks' price ranks 2 out of 10
bids (2/10 Low to High) - second
lowest
Michael Krenesky
49.05 pts ($1,199,589.00)
-
as bid
Paul DeStefano
49.05 pts ($1,199,589.00)
-
Bid Total
Rob Pruzinsky
49.05 pts ($1,199,589.00)
-
Second lowest bid price
References - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 70 of 75
Reviewer
Reason
Comments
9 pts
Meets or exceeds my expectations
From ref calls: Family-owned
company. They do good work.
Their quality is high. They do not
nickel and dime. There has been
several change orders but they
were all a result of in-the-field
design changes. Mark and his son
are great family guys. Very
accommodating. They run a tight
ship with their workers. Compared
to other site contractors, they are
pretty fair to work with on change
orders. There are no extras and if
there are, they point them out.
They are clean.
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Score
CHRO - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 71 of 75
Reviewer
Score
Reason
Comments
Natasha Nau
Pass
Meets the requirement(s)
Earthworks' CHRO is present and
complete
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
LOI - Reviewer Scores
Natasha Nau
Pass
Meets the requirement(s)
Earthworks' LOI meets all
requirements. Slightly weak in the
"why they are uniquely qualified"
section.
Michael Krenesky
Pass
Meets the requirement(s)
meets
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 72 of 75
Reviewer
Score
Reason
Comments
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Reviewer
Score
Reason
Comments
Erin Schwarz
Pass
Meets the requirement(s)
Provided
Natasha Nau
Pass
Meets the requirement(s)
Earthwork's bid bond is present
and of acceptable format
Michael Krenesky
Pass
Meets the requirement(s)
meets
Paul DeStefano
Pass
Meets the requirement(s)
Meets requirement
Bid Bond - Reviewer Scores
List of Similar Projects - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 73 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
4 pts
Strongly fits desired attribute(s)
Work done for Naugatuck, positive
references
Natasha Nau
1 pts
Missing / mismatched attributes
Earthwork's list of 3 similar projects
does not meet all requirements (it
is missing the scope of work and
the timeline) so I really can't
confirm if these projects
demonstrate capability with
projects of similar complexity to
ours (rehab/reconstruct of same
magnitude and similar
components). 1 oujt of 3 are
municipal. This is more of a
reference list.
Michael Krenesky
4 pts
Well-supported claim(s)
meets
Paul DeStefano
0 pts
Incomplete response
Not provided
Resumes - Reviewer Scores
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 74 of 75
Reviewer
Score
Reason
Comments
Erin Schwarz
3 pts
Partially meets my expectations
Org chart rather than detailed
resumes
Natasha Nau
1 pts
Incomplete response
Earthworks' dis not upload
resumes in an acceptable format.
They provide a 1-page
organizational chart and a 1-page
list of names (over 15 individuals)
under their area of work (driver vs.
laborer vs. foreman) and their
years of experience. It is better
than nothing but not by much.
Michael Krenesky
5 pts
Meets or exceeds my expectations
meets
Paul DeStefano
5 pts
Meets or exceeds my expectations
Meets expectations
Generated on Jul 09, 2026 3:48 PM EDT - Natasha Nau
Page 75 of 75
REFUNDS
To be presented at Board of Selectmen Meeting
7/13/2026
NAME/ADDRESS
VW CREDIT LEASING LTD
1401 FRANKLIN BLVD
LIBERTYVILLE, IL 60048-4460
Prepared by office of the Tax Collector
GRAND LIST BILL #
2024-03-0055803
UNIQUE ID#
AMOUNT
TOTAL
55803
235.12
235.12
TOTAL: $
235.12 $
235.12
7/1/2026
COMMENTS
VIN#/NOTES
OVERPAYMENT
3VV2X7B29NM047397
4:22 PM
The government’s own published record — read it yourself, then decide what to do about it.
The cameras, the coverage, and the local record for this community.
Not yet recorded. The record stays open — outcomes are added as minutes and vote results are published.
Provenance
Where this record came from. Every source is listed, permanently.
- Agenda Watch · Oct 5, 2026
Permanent ID DKT-2026-001885 — this record is never deleted.
Record history
Every change to this record, logged as it happened.
- Oct 5, 2026 Filed on the Docket
- Oct 5, 2026 Full document archived — public record
← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.