On the agenda: Kenosha County meeting — License Plate Reader (Jan 26)
Past ⚠ Agenda Watch Kenosha County, Wisconsin · Monday, January 26, 2026 — 8 months ago
About this record
The published agenda for the January 26, 2026 meeting contains: "License Plate Reader", "License plate reader". The meeting has passed. The agenda stays here as a permanent public record.
Check the agenda document for the meeting time.
The agenda, word for word
Government public record — the full text of the published document, archived August 17, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗
Kenosha
County
BOARD OF SUPERVISORS
RESOLUTION NO.
Subject: Resolution to approve the Appointment of Lieutenant
Dan Ruth to serve on the Kenosha County Traffic Safety
Commission
Original Corrected 2nd Correction Resubmitted
Date Submitted:
01/26/2026
Submitted by:
Public Works/Facilities
Committee
Date Resubmitted:
Fiscal Note Attached
Legal Note Attached
Prepared by:
Signature:
WHEREAS, pursuant to County Executive Appointment 2026-8, the County
Executive has appointed Lieutenant Dan Ruth to serve on the Kenosha County
Traffic Safety Commission, and
WHEREAS, the Public Works/Facilities Committee has reviewed the request
of the County Executive for confirmation of the appointment of the above named to
serve on the Kenosha County Traffic Safety Commission and is recommending to
the County Board the approval of this appointment,
NOW, THEREFORE, BE IT RESOLVED that the Kenosha County Board
of Supervisors confirms the appointment of Lieutenant Dan Ruth to the Kenosha
County Traffic Safety Commission. Lieutenant Ruth’s appointment shall be
effective immediately and continuing until the 1st day of April, 2028 or until a
successor is appointed by the County Executive and confirmed by the County Board
of Supervisors. Lieutenant Ruth will fulfill the term of retired Lieutenant Keith
Fonk. Lieutenant Ruth will serve without pay.
Respectfully Submitted this first day of January, 2026.
Public Works/Facilities Committee:
Aye
William Grady, Chairperson
Laura Belsky, Vice Chairperson
Erin Decker
John Franco
Andres Gama
Keith Gray
Eric Meadows
2
Nay
Abstain
Excused
Shelly Billingsley, Director
Department of Public Works &
Development Services
Gregory J. Boldt, Director
Division of Highways
Highway Commissioner
Public Works / Facilities Committee
Highway Division Status Report
January 2026
General
• Greg Brunner named Interim Operations Superintendent.
• Coordinated with local municipalities requesting WisDOT LRIP Funding.
• Coordinated with local municipalities requesting WisDOT STP-Urban Funding
• Attended Winter Highway Conference hosted by Wisconsin County Highway
Association in LaCrosse, WI
• Worked with Paris Solar Farm to determine roadway degradation fees.
Kenosha County Crews
County Highways:
• Snow fighting operations as needed throughout the season.
• Crack sealing along CTH H, CTH S, and CTH O
• Brushing along CTH E
• Pothole repairs county-wide
• Train the trainer forklift training conducted.
• Acquired WI DNR Permits for culvert replacements.
State Highways:
• Snow fighting operations as needed throughout the season.
• Crack sealing along STH 142, STH 50 and STH 32(Sheridan Road)
• Brushing along STH 42, STH 50, STH 83, and STH 195
• Repair damaged guard rails as necessary,
• Pothole repairs county-wide
• Vehicle set-up for winter operations.
Fleet:
• 1 Tri-Axel Truck chassis built and sent to body builder. (Q2 2026 delivery)
• 1 Tri-Axel Truck chassis built and sent to body builder (Q2 2026 delivery)
2025 Equipment:
• 3 - One-Ton Trucks – In-Service
• 1 - Tri-Axel Truck - Chassis built. Sent to body builder (Q1 2027 delivery)
• 1 - Tandem-Axel Truck – Chassis built. Sent to body builder (Q1 2027 delivery)
• Stakebody Truck (x1) – Delivered to body builder (Q1 2027 delivery)
2026 Equipment
• Tractor
• Excavator
• 2 - Tandem Axel Trucks
• 2 - One Ton Trucks
19600 75th Street • Bristol, WI 53104 • 262-653-1870
[email protected] • www.kenoshacounty.org
•
•
Forklift
Trailer for semi to haul equipment.
County Contracted Projects
2025 Culvert Replacement
Project Overview: Replace 3 culverts along CTH A, CTH X, CTH Z
Project Status:
Culvert along CTH X completed and roadway opened. Culvert along CTH
Z currently under construction.
WisDOT Contracted Projects
CTH W from IL Stateline to CTH C
Project Overview: Roadway reconstruction with 10-foot asphalt sidewalk installation, storm
sewer improvements, pavement marking, and re-alignment of horizontal
and vertical curve.
Project Status:
Project currently out to bid by WisDOT. Bid Opening scheduled for
February 10th. Utilities currently on-site performing relocations.
Development Projects
Village of Somers Water Main Replacement
Project Overview: Village of Somers is installing new 12-inch watermain along CTH E from
100th Avenue to Post Office.
Project Status:
Project currently out to bid.
Staffing
• New Hires
o Highway Patrol
▪ 1 – Sam Semke
▪ 2 Accepted offers to start in early February
o Sign Maker
▪ Micheal Beal transferred from Highway Patrol to Sign Maker
o Mechanic
▪ None
• Resignations / Separations
o Retirement – Jim LaBreche, 24 years of Service
o Highway Patrol – 3
o Highway Superintendent
• Open Positions
o Highway Superintendent
o Highway Patrol (8)
o Mechanic (1)
o Mechanic / Fleet Inventory Specialist (1)
19600 75th Street • Bristol, WI 53104 • 262-653-1870
[email protected] • www.kenoshacounty.org
Page 2
Shelly Billingsley, Director
Department of Public Works & Development Services
Frank Martinelli
Project Manager
Division of Facilities
Public Works/Facilities Committee
Facilities Division Special Projects Report
Status Report January 2026
KCDC HVAC Replacements Phase 4 of 4
•
•
•
•
•
•
•
•
Project Budget:
$1,140,000
Total committed costs to date:
$1,103,000
Current Phase:
Punchlist
Engineer/Architect
Clark-Dietz
Contractor
Southport
Current Phase Status/Target Completion:
95% / Q1 2026
Final Completion est.
Q1 2026
Project Overview:
This project replaces end of life HVAC units on a 24/7 jail building with challenging HVAC
requirements. i.e., Controls, Fire panels, Smoke detection, Detention and Medical areas.
Phase 4 will complete the project. Punchlist Phase.
KCC Backup Generator Design and Replacement
•
•
•
•
•
•
•
•
Project Budget:
$524,000
Total committed costs to date:
$517,200
Current Phase:
Punch list
Architect/Engineer
Kuney/Root Engineering
Contractor
Triad
Current Phase Status/Target Completion:
95% / Q1 2026
Final Completion est.
Q1 2026
Project Overview:
This project is to design, spec and replace the 30-year-old end of life backup generator for
the KCC building. Planning to use this generator to supply backup power to the Bristol
Tower and thereby saving money. Oct. 7th generator to building cut over. Oct 16th
generator to radio tower cut over. Punch list phase.
19600 75th Street • Bristol, WI 53104 • 262-653-1863
[email protected] • www.kenoshacounty.org
Brookside Backup Generator Design and Replacement
•
•
•
•
•
•
•
•
Project Budget:
$1,925,000
Total committed costs to date:
$1,436,500
Current Phase:
Complete
Architect/Engineer
RTM Engineering
Contractor
Lee Mechanical
Current Phase Status/Target Completion:
100% / Q4 2025
Final Completion est.
Q4 2025
Project Overview:
This project is to design, spec and replace the 30-year-old backup generator. The current
generator only backs up life safety items. The new generator will back up the entire building
including all lighting, computers, and AC. By backing up the entire building instead of only
life safety, we not only saved money, but also eliminated noisy disruptive construction work
in the resident areas. Generator cut over completed on July 9th. Completed Dec. 5th.
Ceremonial Courtroom Restoration CCR
•
•
•
•
•
•
•
•
Project Budget:
$7,058,000
Total committed costs to date:
$5,849,000
Current Phase:
Construction
Architect/Engineer
InSite
Contractor
Camosy as CM
Current Phase Status/Target Completion:
60% / Q2 2026
Final Completion est.
Q2 2026
Project Overview:
This project is to design, spec and restore the Ceremonial Courtroom from floor to ceiling
including installing an up-to-date courtroom audio visual system and to remodel the back
offices. Phases 1-4 are within budget. Construction began on May 12th.
PSB Underground Gasoline and Diesel Fuel Tank Design and Placements
•
•
•
•
•
•
•
•
Project Budget:
$950,000
Total committed costs to date:
$755,100
Current Phase:
Construction
Architect/Engineer
Kuney
Contractor
Interstate Pump & Tank
Current Phase Status/Target Completion:
90% / Q1 2026
Final Completion est.
Q1 2026
Project Overview:
This project is to design, spec and replace the 44-year-old (qty 2) 10,000 gal. gasoline and
(qty 1) 10,000 gal. diesel underground tanks. The gasoline tanks fuel County vehicles
including Sherriff squads and City Police. The tanks aren’t leaking but our insurance
consultant highly recommended replacing them because of their age and insurability. Bids
are due on January 29th. The 2025 budget was increased by $200,000 because 2024 bids
came in over budget. Construction started June 10. Demo of existing fuel islands and tanks
started on schedule on Oct. 6th.
Kemper Water Infiltration Repairs 2025(Phase 5)
•
•
•
•
•
•
•
•
Project Budget:
$353,000
Total committed costs to date:
$150,650
Current Phase:
Completed
Architect/Engineer
InSite Architects
Contractor
Tron
Current Phase Status/Target Completion:
100% Q4 2025
Final Completion est.
Q4 2025
Project Overview:
This project includes tuck pointing and repairing brick, stone, and windows to Federally
mandated restoration standards. The purpose is to stop water from infiltrating the exterior
envelope and creating exterior and interior damage. Exterior wood in this area will also be
painted. This is the 5th phase of a multi-phase project. The County applied for the City’s
CDBG grant and will receive $35,000 for this project. Construction started June 9th. Contract
terminated on Dec. 22nd due to contractor not adhering to specifications.
Kemper Water Infiltration Repairs 2026(Phase 6)
• Project Budget:
$400,000
• Total committed costs to date:
$ 52,000
• Current Phase:
Bidding
• Architect/Engineer
InSite Architects
• Contractor
TBD
• Current Phase Status/Target Completion:
50% Q1 2026
• Final Completion est.
Q4 2026
• Project Overview:
This project includes tuck pointing and repairing brick, stone, and windows to Federally mandated
restoration standards. The purpose is to stop water from infiltrating the exterior envelope and
creating exterior and interior damage. Exterior wood in this area will also be painted. This is the
6th phase of a multi-phase project. Bid was posted on January 7th. Bids are due on Feb. 11th.
PSB HVAC Air Handling Unit Replacement
•
•
•
•
•
•
•
•
Project Budget:
$1,075,000
Total committed costs to date:
$ 431,900
Current Phase:
Construction
Engineer/Architect
Clark-Dietz
Contractor
J&H Heating Inc
Current Phase Status/Target Completion:
35% / Q2 2026
Final Completion est.
Q3 2026
Project Overview:
This project replaces end of life HVAC units on a 24/7 jail building with challenging HVAC
requirements. The scope is to demo and install a new air handling unit, condensing unit
rooftop equipment, and VAV boxes with new controls. Existing fire alarm devices will be
integrated into the new equipment. Work began on schedule on Oct. 27th.
HUMAN SERVICES RELOCATION & RENOVATION –
JANUARY 2026
• Current Building Recap:
• Windows are wrapping up with prep work for the curtain wall at entrance beginning along with installing
entrance frames and roof level windows.
• Low Voltage wiring is continuing in Zone D with fire alarm devices being installed.
• Accent wall painting in zone D and priming of second floor has begun.
Zone B
Zone E
Zone D
Zone C
Zone A
• Building Description: The Human Services portion of the project will include approximately 47,149 SF within the
two-story addition and another approximately 100,000 SF in the renovated portion of the site. The site will include
the Human Services department which provides the following services:
• Division of Public Health
• Department of Vocational Rehabilitation
• Food Share and Employment Training
• Economic Support
• Veteran Services
• Wisconsin Works program
• CMA Current Schedule:
Activity
Utilities
Underground Electrical
Masonry – Stairwell / Elevator
Roof Deck Replacement
1/21/2026
• Department of Aging & Disability
• Job Center
• Prevention Services Network
• Department of Children and Family Services
• Child Support Services
• Department of Behavioral Health
% Completed (end April)
100% Completed
100% Completed
100% Completed
100% Completed
Tentative Est. Completion
Qtr 2 2024
Qtr 1 2025
Qtr 3 2024
Qtr 3 2024
1
Steel
Vapor Mitigation Piping
Floor Box Install
Exterior Framing/ Sheathing/Weatherproofing
Exterior Masonry
Roofing
Exterior Siding
Window Install
Storefront Install
Exterior Painting
Building Interior Zone B
Building Interior Zone A
Building Interior 2nd Floor
Building Interior Zone C
Building Interior Zone D
Building Interior Zone E
Building Punchlist Walk Thru
Construction Completed
County Transition
100% Completed
100% Completed
100% Completed
100% Complete
100% Complete
100% complete
0% Complete
90% Complete
35% Complete
0% Completed
74% Completed
71% Completed
57% Completed
48% Completed
59% Completed
49% Completed
0% Completed
0% Completed
0% Completed
Qtr 4 2024
Qtr 4 2024
Qtr 1 2025
Qtr 3 2025
Qtr 4 2025
Qtr 3 2025
Qtr 4 2025
Qtr 4 2025
Qtr 4 2025
Qtr 2 2026
Qtr 1 2026
Qtr 1 2026
Qtr 2 2026
Qtr 2 2026
Qtr 2 2026
Qtr 2 2026
Qtr 3 2026
Qtr 3 2026
Qtr 3 2026
• Budget:
Financials as of end December
HSB Finance Summary
100%
80%
60%
40%
$26,675,776
$2,606,682
20%
0%
Design & Construction
Contingency
Expense Realized
Expense Breakdown
Grant Funded,
$9,118,565 ,
34%
County
Funded,
$1,457,939 ,
6%
Bear
Accumulated,
$16,099,272 ,
60%
1/21/2026
2
2025 Daily Rates
Brighton Dale Links and Petrifying Springs GC
2026 Golf Rates (Proposed)
Brighton Dale Links and Petrifying Springs GC
All Prices include tax
All Prices include tax
Summer Rates
Daily Rates
April 26 - October 5
April 25 - End of Season
Regular Rates
9 holes
18 holes
Monday - Friday
Weekends and Holidays
Cart Fees
$19
$24
$13
$27
$38
$22
Junior/Senior Rates
9 holes
18 holes
Monday - Friday
Cart Fees
Replay Rates
Monday - Friday
Weekends and Holidays
Cart Fees
$14
$13
$20
$17
9 holes
Unlimited
$7
$14
$9
$14
$22
$17
*Senior Rates not valid Saturday, Sunday, or Holidays
Spring/Fall Rates
(Open - April 25) & (October 6 - End of Season)
Regular Rates
Monday - Friday
Weekends/Holidays
Cart Fees
Unlimited (Spring/Fall)
Anyday
9 holes
18 holes
$32
$40
$19
$25
$49
$65
$27
$40
9 holes
18 holes
$27
$14
$37
$20
9 holes
18 holes
$17
$25
$31
$40
Monday - Friday Walking
$8
$14
Weekend and Holidays Walking
$15
$20
Monday - Friday Riding
Weekends and Holidays Riding
Monday - Friday Walking
Weekends and Holidays Walking
Junior/Senior Rates
Monday - Friday Riding
Walking
Replay Rates
Monday - Friday Riding
Weekends and Holidays Riding
*Senior Rates not valid Saturday, Sunday, or Holidays
9 holes
18 holes
Spring Rates
$16
$22
$11
$22
$27
$18
Open - April 24
Walking
Riding
$35
$55
Season Packages
Adult Value Golfer
Adult Couple Value Golfer
Regular Rates
$1,295
$2,105
* Adult packages have no restrictions and include 4 guest passses
Regular Rates
Monday - Friday Riding
Weekends/Holidays Riding
Monday - Friday Walking
Weekends/ Holidays Walking
9 holes
18 holes
$27
$35
$16
$22
$40
$50
$22
$30
Season Packages
Adult Value Golfer
Adult Couple Value Golfer
$1,295
$2,105
* Adult packages have no restrictions and include 4 guest passses
Senior Package
$735
*Senior Package not valid on Weekends/Holidays
Young Executive Package
Senior Package
$735
*Senior Package not valid on Weekends/Holidays
$735
* YE Package not valid between 8am and 12pm Weekends/Holidays
Young Executive Package
$735
* YE Package not valid between 8am and 12pm Weekends/Holidays
Junior Package
$105
Junior Package
$105
Golf Package Cart Fees $10 (9 holes) - $15 (18 holes)
Golf Package Riding Fees $10 (9 holes) - $15 (18 holes)
*Junior's pay $5 each time they play not valid before 1pm on Weekends/Holidays
*5 % Discount on individual rounds for active Millitary,
*Junior's pay $5 each time they play not valid before 1pm on Weekends/Holidays
Police, Fire, and EMS personnel. Must provide I.D.
*5 % Discount on individual rounds for active Millitary,
*Senior age 60 and older
*Junior age 17 and younger
*Young Executive 39 and Younger
Police, Fire, and EMS personnel. Must provide I.D.
WWW.KENOSHACOUNTYGOLF.COM
*Young Executive 39 and Younger
*Senior age 60 and older
*Junior age 17 and younger
WWW.KENOSHACOUNTYGOLF.COM
Department of Public Works & Development Services
Shelly Billingsley, Director
James J. Wallace
Director of Golf
January 26, 2026
Golf Division Report
2024 Recap
-
The final tally of golf rounds for 2025 is 122,823. Our previous record for total rounds
played was 121,615 set in 2024.
-
Brighton Dale 2025 Rounds: 83,259
-
Petrifying Springs 2025 Rounds: 39,564
Staffing
- Most of our seasonal positions will be posted in mid-February, and we are preparing all
our onboarding processes currently. Over the past few years, we have seen a high rate of
seasonals returning year-to-year, which is a positive sign. We expect to start bringing our
key seasonal employees back to work in early March.
General
-
We are submitting our proposed golf rates for 2026 to the committee for approval.
Included is a rates comparison study covering most golf facilities in the area for your
review. Very little change from 2025 rates, but we will address and answer any questions
from the committee during our meeting.
- With the break in snow cover during the first week of January, we were able to get out
and scout conditions on the golf courses. No signs of winter injury or damage to this
point were observed. We had a few small trees fall at Petrifying Springs, but nothing of
significance to the golf course or operation.
Project Updates
- Permit applications and drawings for the Brighton Dale storage building have been
submitted to the state with final review scheduled for early February. We expect things
will move quickly once we have permission to start from the state and weather allows for
productivity.
19600 75th Street, Suite 122-1 • Bristol, WI 53104 • 262-857-1865
[email protected] • www.kenoshacounty.org
- We are currently out to bid for design work on the Petrifying Springs maintenance shop.
We have paired the design work with the Parks department for design work on their
maintenance facility, which we expect will create cost efficiencies and savings for both
departments on the design component. We expect to have a firm hired and begin initial
design meetings by April and finalize design work through the spring and early summer.
- We are hoping to complete a small electrical project at Brighton Dale before the start of
the 2026 season. We will be boring a line for outdoor power on the North side of the
Brighton Dale clubhouse to accommodate a range ball dispenser.
Shelly Billingsley, Director
Department of Public Works & Development Services
Matt Sturino, Director
Division of Facilities
Public Works / Facilities Committee
Facilities Division Status Report
January 2026
Project Updates
Brookside Carpet and Windowsill replacement Project
•
•
•
•
•
•
•
•
•
Project Budget:
$445,000
Current Phase:
Construction
Engineer/ Contract:
N/A
Contractor/ Contract:
$188,640/ Dickow Cyzak- Flooring
Contractor/ Contract:
$66,600/ Rasch Construction- Sills
Contractor/ Contract:
$19,740/ Rasch - Painting
Target Completion:
Q4 2026
Rooms Completed:
42 of 115 rooms completed
Project Overview:
This work replaces 115 carpeted residence rooms with commercial grade vinyl flooring.
In addition, 74 rooms will have the windowsills removed and replaced with flush a
mounted sill design, improving the safety of the residences. To reduce disruption to the
residence and the building census, the contractors will complete 2 rooms per week.
Construction started on July 30th and is expected to last a minimum of 56 weeks.
KCC Elevator Hydraulic Cylinder Replacement
•
•
•
•
•
•
Project Budget:
$75,000
Current Phase:
Completed
Engineer/Architect:
$3875/ Kueny Architects
Contractor/ Contract:
$ 53,590/ Express Elevator
Current Phase Status/ Target Completion:
Q4 2025
Project Overview:
During routine operation, the hydraulic cylinder servicing the employee elevator at the
Kenosha County Center (KCC) failed beyond repair. Equipment lead times for the
project originally were anticipated for 8-10 weeks. Construction began on December 15,
2025, and was completed on January 12th, 2026.
912 56th Street • Kenosha, WI 53140 • 262-653-2548
[email protected] • www.kenoshacounty.org
PSB Washroom Remodel Phase II
•
•
•
•
•
•
Project Budget:
$205,000
Current Phase:
Final Punch-list
Engineer/Architect:
$9750/ Kueny Architects
Contractor/ Contract:
$180,100/ Absolute Construction
Current Phase Status/ Target Completion:
Q1 2026
Project Overview:
This project completely remodels the men’s and women’s washroom located in the NW
common hallway of the PSB. This project also includes a complete remodel of the ADA
washroom and shower areas located in the men’s locker room in the basement of the
PSB. New construction includes partitions, doors, plumbing fixtures, drinking fountains,
tiled shower units, concrete work, miscellaneous mechanical work, lighting, acoustic tile
ceiling, and paint. This project is substantially completed.
Brookside Kitchen Floor Replacement
•
•
•
•
•
•
Project Budget:
$118,000
Current Phase:
Final Punch-list
Engineer/Architect:
$5,300/ Kueny Architects
Contractor/ Contract:
$116,900/ Camosy Construction
Current Phase Status/ Target Completion:
December 2025
Project Overview:
The flooring in the kitchen of Brookside Care Center is original to the building and well
beyond its useful life. This project involves replacing the flooring in the kitchen and
dishwashing areas. To complete the work properly, all cooking and plumbing equipment
will need to be removed. A temporary menu will be implemented to reduce cooking
demand during construction. Most of the food preparation will be relocated to the
employee break room (to be used as a prep area) and to the small satellite kitchens
throughout the campus. In addition, a MOU between Kemper Center Inc. and Kenosha
County allows for the use of kitchen equipment at Kemper Center if needed. On 9/8
we met on-site to review the base bid and alternate bid options. Submittals have been
approved and construction started on 10/23/25. This project was substantially
completed on December 1, 2025.
KCDC Parking Lot Replacements Phase II
•
•
•
•
•
•
•
•
Project Budget:
Current Phase:
Engineer/Architect:
Contractor/ Contract: Base
Contractor/ Contract: Alt
Total Contract:
Current Phase Status/ Target Completion:
Project Overview:
$750,000
Punch-List
$94,915/Clark Dietz( Multiple Phases)
$485,132/ Asphalt Contractors, Inc
$71,442/ Asphalt Contractors, Inc
$556,574/ Asphalt Contractors, Inc
November 2025
This project replaces parking lots and service roadways on the KCDC grounds. The
parking lots and roadways have developed large cracks and potholes that have become
un-repairable. This phase of the project replaces the west public lot and loop, south
admin lot, south Huber lot and sally port roadway. In addition to milling and re-paving
the lots, new subbase material is being replaced, along with ADA improvements to the
entry sidewalks to the building. Construction for this project is completed.
KCDC/ PSB Emergency Panel Modifications
• Project Budget:
$110,000
• Current Phase:
Construction
• Engineer/Architect:
$2,310/ Hanson & Associates
• Contractor/ Contract:
$67,700/ ECI Inc.
• Current Phase Status/ Target Completion:
January 2026
• Project Overview:
Extended power outages of the past exposed numerous power deficiencies to the emergency
back-up power system servicing areas throughout the Jail and Administration within the
KCDC and PSB. This project addresses these issues by providing the electrical
infrastructure to supply the essential power to these critical areas. Electrical Contractors of
WI Inc was the lowest responsible bidder. Construction proceeded on schedule, with
minimal effect to staff and was completed on January 5th.
KCDC Secure Miscellaneous Security Upgrades
• Project Budget:
$515,000
• Current Phase:
Submittal Reviews
• Engineer/Architect:
$32,080/ Kueny Architects
• Contractor/ Contract:
$454,656/ Rasch Construction
• Current Phase Status/ Target Completion:
Q4 2026
• Project Overview:
This scope of work contains multiple projects within the KCDC. A secure front reception/
protective barrier for staff, lobby flooring replacement, installation of new padded/isolation
cells and 2 heavy duty exterior security jail door replacements. Bids were due on 11/5/2025
and Rasch Construction was the low bidder. A bid review meeting was held 11/15/ 2025,
PO has been issued, and the submittal and permit reviews have started. A pre-construction
meeting is scheduled for January 28th.
KCC Communications Building Roof
•
•
•
•
•
•
Project Budget:
Current Phase:
Engineer/Architect:
Contractor/ Contract:
Current Phase Status/ Target Completion:
Project Overview:
$50,000
Submittal Review
$0/ Garland Company
$26,190/ Vans Pro Service
Q4 2026
This scope of work replaces the roof of the radio communications tower buildings at the
Kenosha County Center (KCC), as it is original to the building (1992) and past its useful life.
The pre-bid conference was held on 10/21/2025, and the bids were due on 11/4/2025.
Van’s Pro Service was the low bidder. Submittal review to follow. Dependent on outdoor
weather conditions and temperature, construction will begin Spring of 2026.
Future Projects Currently Under Design
Staffing
•
•
•
•
•
•
KCDC Roof Replacement Phase I
KCDC Parking Lot Replacement Phase III
KCDC Shower Renovations
KCC Overhead Garage Door Replacement Phase III
Building Access Hardware Replacements, Phase II
PSB- CRAC Replacement Project
•
Open positions
o 2- Custodian
• 1st Shift PTF
• 2nd Shift KCCH
Open
Open
Shelly Billingsley, Director
Department of Public Works & Development Services
Wyatt J. Moore, Director
Division of Parks
Public Works/Facilities Committee
Parks Division
Status Report for January 2026
Brighton Dale Park Area #2 Playground:
• Project Budget:
$150,000
• Current Phase:
Design
• Engineer/Contract:
TBD
• Target Completion:
September 2026
Project Overview: The playground in Area #2 at Brighton Dale Park has reached the end of its
useful life, and is no longer in compliance with modern playground safety standards. This area is
heavily utilized by families participating in baseball league play at the nearby ball diamonds.
Following the current playground replacement schedule, the current playground will be completely
replaced with a new metal structure.
Kemper Center Chapel Repairs:
• Project Budget:
$250,000
• Current Phase:
Pre-Bid
• Design and Construction Oversight:
Enberg Anderson
• Target Completion:
End of April 2026
Project Overview: The chapel at the Kemper Center is a major source of revenue for Kemper
Center Inc., offering a rentable event and wedding space to the public. To increase the space’s
longevity and maximize on its revenue potential over the coming years, Kenosha County Parks has
plans to restore its interior.
Enberg Anderson is currently developing specifications for this project that Kenosha County will
use during the bidding process. The specifications are estimated to be available to the county by the
end of November, with bids being released once the specifications are fully prepared. It’s estimated
that the work will be complete by the end of April 2026, and will contain the following scope of
work:
• Wall and ceiling plaster work and repainting
• Refinishing wooden church pews
• Refinishing wooden floors, doors and doorways
• Replacing tile and carpet floors
• Updated lighting and electrical
19600 75th Street • Bristol, WI 53104 • 262-653-1899
[email protected] • www.kenoshacounty.org
Kemper Center Facility Condition Assessment:
• Project Budget:
$100,000
• Current Phase:
Complete
• Contractor/Contract:
InSite
• Target Completion:
End of December
A study was conducted at the Kemper Center to assess the exterior, interior, infrastructure, utilities,
and overall structure of this nationally recognized historic building. While this study was initially
proposed to assess Kemper’s structural foundation, it has been expanded to include a square footage
analysis, building code compliance, potential intervention options, cost estimates for those options,
and a proposed sequence of work.
Kemper Center – Shoreline Repair:
• Estimated Project Cost:
$15,400,000
• Current Phase:
Design
• Contract:
Red Barn D&E
• Target Completion:
December 2027
Project Overview: Kenosha County is working with Red Barn Design and Engineering to explore
two alternative shoreline repair options. Red Barn D&E has previously provided successful
shoreline design and construction oversight for both Milwaukee County and the City of Kenosha.
•
•
Option 1 (estimated at $15.4 million) involves constructing an onshore breakwater around
the shoreline, with Kenosha County responsible filling in at a later date.
Option 2 (estimated at $12.3 million) would follow a design similar to Red Barn D&E’s
work for the City of Kenosha. This approach reshapes the existing shoreline into a straight
edge, both protecting against further erosion and visually aligning with the rest of the city’s
shoreline.
These cost estimates are preliminary and may change as Red Barn D&E proceeds into the design
and engineering phase.
Kemper Center – Durkee Mansion Stained Glass Windows:
• Project Budget:
$100,000
• Current Phase:
Design
• Engineer/Contract:
TBD
• Target Completion:
Beginning of September
Project Overview: The stained-glass windows at the Kemper Center are an important part of its
history but have deteriorated significantly over the years. Willet conducted a review of every stainedglass window in the building. Based on this review, the windows in the Durkee Mansion are in
critical condition; the glass has bowed into a bowl shape and is at risk of failing.
The restoration work will involve removing the windows, restoring them, and reinstalling them with
proper ventilation to prevent further deterioration. Kenosha County Parks plans to complete the
design and construction phases in 2026.
License Plate Readers:
• Project Budget:
$42,000
• Current Phase:
Design
• Engineer/Contract:
TBD
• Target Completion:
May 2026
Project Overview: License plate readers will be installed at the CTH A entrance to Petrifying
Springs Park and at the main entrance to Old Settlers Park in 2026. These installations will help the
Parks Division curb illegal dumping, vandalism, and property damage within the parks.
Midwest Interstate Trail (Design Phase):
• Project Budget:
$110,000
• Current Phase:
Grant Seeking
• Engineer/Contract:
TBD
• Target Completion:
End of December 2026
Project Overview: The Midwest Interstate Trail project is a proposed 4-mile off-road multi-use
path that will run through the Town of Randall and the Village of Twin Lakes and connect to
additional off-road multi-use paths in McHenry County. KL engineering completed a feasibility
study and determined the proposed trail to be technically feasible. Kenosha County is now soliciting
grants to off-set the cost of designing this project.
Mobile Stage:
• Project Budget:
$170,000
• Current Phase:
Construction
• Engineer/Contract:
Century Stages
• Target Completion:
End of April 2026
Project Overview: Increased demand for events across the county has led to additional wear and
tear on the existing Parks mobile stage. The stage is used by Kenosha County Parks and Kemper
Center Inc. for events and is also available for rent to third parties hoping to host their own events
within the park system. The new stage will offer improved reliability and enhanced safety for
transportation on roadways. Kenosha County Parks has ordered the stage, and it’s estimated to take
over one year to manufacture.
Petrifying Springs Park Area #3 Playground:
• Project Budget:
$200,000
• Current Phase:
Design
• Engineer/Contract:
Burke
• Target Completion:
May 2026
Project Overview: The playground in Area #3 at Petrifying Springs Park had reached the end of its
useful life, and was no longer in compliance with modern playground safety standards. During
construction of the Pike River Phase III restoration, this playground was removed. A replacement
playground will be installed west of the Area #3 pavilion before rental season begins.
Petrifying Springs Biergarten Parking Improvements:
• Project Budget:
$220,000
• Current Phase:
Design (Clark Dietz)
• Engineer/Contract:
Kenosha County Highways
• Target Completion:
End of October 2026
Project Overview: The Petrifying Springs Biergarten is a popular destination in the county. Due to
the park’s age, it is not equipped to handle steadily increasing parking demands. Clark Dietz is
developing drawings, plans, and specifications to widen the parkway adjacent to the Biergarten to
allow for angled parking. An estimated 50 parking spaces will be added upon project completion,
and when the angled spaces are fully occupied, they will also serve as a barrier to prevent other park
users from driving through the grass.
Petrifying Springs Maintenance Shop:
• Project Budget:
$250,000
• Current Phase:
Design
• Engineer/Contract:
Open Bid
• Target Completion:
End of December 2026
Project Overview: The current maintenance shop building at Petrifying Springs Park is nearly 100
years old, beyond its useful life, and undersized for current operations. In 2016, a storage barn at the
park was razed due to unsafe conditions and having exceeded its useful life, further reducing
adequate space for proper equipment storage.
The Petrifying Springs Golf Course is also in need of building upgrades, which have already been
approved in the Golf Course Improvements Master Plan. There was originally a plan to combine the
divisions into a single building to save both time and cost. However, after months of thorough
review, both divisions determined that this approach is not feasible due to site constraints and
operational inefficiencies.
In 2026, design will begin for a new Parks Division maintenance building, with construction to
follow.
Roof Survey:
• Project Budget:
$125,000
• Current Phase:
Design
• Engineer/Contract:
Garland
• Target Completion:
May 2026
Project Overview: Maintaining and preserving building exteriors and roofs is a primary focus of the
County. The Parks Division is responsible for more than thirty buildings and pavilions and must
ensure their longevity is not compromised by leaks or failing roofing systems. Funding distributed
over the coming years will allow for the replacement of at least one roof per year. Based on the 2025
roof replacement survey conducted by a third-party consultant, the Brighton Dale Park Pavilion and
Maintenance Shop is scheduled for roof replacement in 2026.
Staffing: Kenosha County Parks is recruiting for a seasonal graphic designer to assist the
administrative team with marketing, and hosting its growing portfolio of special events.
Open Seasonal Positions:
• (1) Graphic Designer
Rochester Lateral: We Energies has approached Kenosha County about installing above-ground
natural gas equipment at the corner of BB and Hwy 75, which is located on Brighton Dale County
Park property. To accommodate this request, Kenosha County Parks has asked We Energies for a
donation to the park's playground fund.
Pringle Nature Center: Monthly Programming Report
November 2025
Programs and number of participants per program:
● October-November: StoryWalk Trail with the Kenosha Public Library (30 participants)
● November 1: Bristol Woods Trail Run (130 participants, 1 staff, 2 board, 8 volunteers)
● November 1: private “Meet the Animals” birthday party rental (25 participants, 1 staff)
● November 4: program meeting (4 staff)
● November 6: private building rental (1 board, 7 participants)
● November 11: Executive Committee meeting (3 board, 1 staff)
● November 13: Fundraising Committee meeting (4 board, 2 staff)
● November 15: Pokémon @ Pringle (129 participants, 1 staff, 1 board)
● November 18: private “Sensory Exploration of the Environment” field trip (25
participants, 2 staff, 2 volunteers)
● November 18: private building rental (1 board, 7 participants)
● November 19: 4K/5K Homeschool Science (4 participants, 1 staff, 1 volunteer)
● November 19: private building rental (1 board, 5 participants)
● November 20: Nature Story Time (0 participants, 1 staff)
● November 21: 1st-5th grade Homeschool Science x2 (21 participants, 3 staff, 1 board, 3
volunteers)
● November 22: Nature Story Time (9 participants, 2 volunteers)
● November 22: private scout hike (30 participants, 1 staff)
● November 22: private building rental (8 participants, 2 staff)
● November 27-December 1: Leave No Child Inside: Giving Thanks for Nature! (10
participants)
● November 27-December 31: Holiday Gnome Hunt
During this month, 22 volunteers contributed 134 hours of volunteer service to Pringle Nature
Center. An estimated 193 visitors came to the center during this period and 440 visitors
participated in programming, making a total of at least 633 visitors exposed to the center.
Upcoming Programs:
● November 27-December 1: Leave No Child Inside: Giving Thanks for Nature!
● November 27-December 31: Holiday Gnome Hunt
● December 1: program meeting
● December 3: Executive Committee meeting
● December 13: The Great Gnome Gathering
● December 18: Nature Story Time
● December 19: Winter Solstice Night Hike
● December 20: Nature Story Time
1
Pringle Nature Center: Monthly Programming Report
December 2025
Programs and number of participants per program:
● November 27-December 1: Leave No Child Inside: Giving Thanks for Nature! (10
participants)
● November 27-December 31: Holiday Gnome Hunt (195 participants)
● December 1: program meeting (3 staff)
● December 4: snowshoe rental training (1 volunteer, 1 staff)
● December 10: snowshoe rental training (1 volunteer, 1 staff)
● December 13: The Great Gnome Gathering (34 participants, 4 staff, 4 board, 6
volunteers)
● December 18: Nature Story Time CANCELED–no participants
● December 19: Winter Solstice Night Hike (65 participants, 2 staff, 1 board, 2 volunteers)
● December 20: Nature Story Time (17 participants, 2 volunteers)
● December 24-25: CLOSED
● December 31-January 1: CLOSED
During this month, 24 volunteers contributed 135 hours of volunteer service to Pringle Nature
Center. An estimated 100 visitors came to the center during this period and 321 visitors
participated in programming, making a total of at least 421 visitors exposed to the center. 10
snowshoes were rented. Hailey Everhart was hired as an Environmental Educator.
Upcoming Programs:
● January 6-9: CLOSED for staff training, maintenance
● January 6: staff CPR/first aid training
● January 7: program meeting
● January 15: Nature Story Time w/ Miss Lisa of The Traveling Trunk
● January 16-19: Leave No Child Inside: Snow Day!
● January 16: 1st-5th grade Homeschool Science
● January 17: Nature Story Time w/ Miss Lisa of The Traveling Trunk
● January 21: Board of Directors meeting
● January 31: private building rental
● January 31: private birthday party rental
1
The government’s own published record — read it yourself, then decide what to do about it.
The cameras, the coverage, and the local record for this community.
Not yet recorded. The record stays open — outcomes are added as minutes and vote results are published.
Provenance
Where this record came from. Every source is listed, permanently.
- Agenda Watch · Aug 17, 2026
Permanent ID DKT-2026-000474 — this record is never deleted.
Record history
Every change to this record, logged as it happened.
- Aug 17, 2026 Filed on the Docket
- Aug 17, 2026 Full document archived — public record
← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.